ML19225A932
| ML19225A932 | |
| Person / Time | |
|---|---|
| Issue date: | 05/03/1979 |
| From: | Potapovs U NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Bald C BECHTEL GROUP, INC., BECHTEL POWER CORP. |
| Shared Package | |
| ML19225A927 | List: |
| References | |
| REF-QA-99900519 NUDOCS 7907230061 | |
| Download: ML19225A932 (2) | |
Text
'
[gn ngcq UNITED ST ATES Do NUCLEAR REGULATORY COMNilSSION 3%
REClON IV 3.h I 611 RYAN P1 AZA DRIVE, SUITE 1000 AR LINGTON, TEX AS 76011 O 3 MAY 1979 Docket No. 99900519/79-02 Bechtel Power Corpcration Gaithersburg Power Division Attn: Mr. C. E. Bald Vice President and Division Manager 15740 Shady Grove Road Gaithersburg, Maryland 20706 Gentlemen:
This refers to the QA program inspection conducted by 'ir. R. H. Brickley of this office on April 9-13, 1979, of your facility a t Gaithersburg, Maryland, and to the discussions of our findings with you and members of your staff at the conclusion of the inspection.
Areas examined during the QA program inspection and our findings are dis-cussed in the enclosed report. Within these areas, the inspection consisted of an examination of procedures and representative records, interviews with personnel, and observations by the inspector.
During this inspection it was found that the implementation of your QA program failed to meet certain NRC requirements. The specific findings and references to the pert'nent requirements are identified in the enclosures to this letter.
Please provide us within thirty (30) days a written statement containing, (1) a description of steps that have bcen or will be taken to correct these items, (2) a description of steps that have been or will be taken to prevent recurrence, and (3) the dates your corrective actions and preventive measures were or wil1 be completed.
In accordance with Section 2.790 of the Commission's " Rules of Practice,"
Part 2, Title 10, Code of Federal Regulations, a copy of this letter with enclosure and your reply together with the enclosed inspection report will be placed in the Commission's Public a cument Room.
If tnis report containc any information that you believe to be proprietary, it is necessary that you 42 318 qq clnn rMM
Bechtel Power Corporation make a written application within thirty (20) days to this office to with-hold such information from public disclosure. Any such application must include a full statement of the reasons on the basis of which it is claimed that the information is proprietary and should be prepared so that proprietary information identified in the application is contained in a separate part of the document.
If we do not hear from you in this regard within the specified period, the report will be placed in the Puolic Document Room.
Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
Sincerely, I
o i ;
1, Uldis otapovs, Chief Vendor Inspection Branch
Enclosures:
1.
Notice of Deviation 2.
Inspection Report No.
99900519/79-02 Al2 317