ML19225A791
| ML19225A791 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 07/16/1979 |
| From: | Opeka J NORTHEAST UTILITIES |
| To: | NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA) |
| Shared Package | |
| ML19225A792 | List: |
| References | |
| MP-1-1259, NUDOCS 7907200256 | |
| Download: ML19225A791 (1) | |
Text
.
[CC]N}313R837 U.TEl5E3335
(
no nox na H Ut i f (M). CO? NE CTICUT C*,101 L
gcq uaran J,._W
, J ',
July 16,1979 l',P-1 -12 59 Director Office of lianagement Infomation and Program Control U. S. ?!uclear Regulatory Con:aission Washington, D. C.
20555
Reference:
Provisional License DPR-21 Docket ilo. 50-245
Dear Sir:
In accord 1nce with itillstone Unit 1 Technical Specification 6.9.1.6, the following r:enthly operating daf.a report for liillstont Unit 1 is enclosed.
One additional copy of the report is enclosed.
Very truly yours.
. OgL-J. F. Opeka Station Superintendent liil] stone fluclear Power Station JF0/Fdr//lln Enclosu res:
(6)
Director, Of fice of Inspection and Enforccnent, Region I cc:
Director, Office of Inspection and Enforcement, Washington, D. C.
(10) 366 194 7 0072 o o a56,.