,--_y Metropolitan Edison Company I
j f
Post Office Box 542 II L
Reading Pennsylvania 19640 215 929-3001 Writer's Direct Dial Number July 13,1979 gal 089h Director of Nuclear Reactor Regulation Attn: R. W. Reid, Chief Operating Reactors Branch No. L U.S. Nuclear Regulatory Cc==ission Washington, D.C.
20535
Dear Sir:
Three Mile Island Nuclear Station, Unit 1 (2C-1)
Operating License No. DPR-50 Docket No. 50-239 Fire Prctection Program By letter of Decenter 23,1978 (GQL 2070), Met-Ed ec.=itted to submit a conceptual design of an alternste shutdown station for T:C-1 by July 31, 1979.
By letter of Septenber 29, 1978 (GqL 1585),
Met-Ed proposed the end of the 1981 refueling outage as the implementation date for the alternate shutdown staticn.
As a result of the " arch 28, 1979 accident at TE-2, the desi.=
of the alternate shutdown station is being revised. Consequently, Met-Ed will sutrit the design for your review by September 30, 1979 Our proposed implementation date, for which Met-Ed seeks :EC's approval, remains unchanged.
Sincerely,
/
J. G. Herbein Vice President Generation JGH:WSS:=rm ao&
7907190 5 5 N() J 6#0 g,
trccc cn Ec scn Cycan, < 3 - emner of ra G-w cr_m, t es C,s.sm