ML19225A357
| ML19225A357 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 06/06/1979 |
| From: | Daltroff S PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | Grier B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| NUDOCS 7907190080 | |
| Download: ML19225A357 (1) | |
Text
TTc PHILAD ELPHI A ELECTRIC COMPANY 2301 MARKET STREET P.O. BOX O f,99 PHILADELPHI A. PA.19101 R15) 8415001 sHistos t. DALTROFF mJf0"a:%,,
June 6, 1979 Re: Docke-Nos.: 50-277 50-278 IE Bulletin 79-03 Mr. Boyce R.
Grier, Director Office of Inspection & Enforcement Region I United States Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406
Dear Mr. Grier:
This letter is our complete response to IE Bulletin No. 79-03, forwarded to us on March 12, 1979, concerning longitudinal wela defects in ASME SA-312 type 304 stainless steel pipe spools manufactured by Youngstown Welding and Jagineering Company.
We have completed our review of the pertinent records and have determined that no pipe spools manufactured by Youngstown Welding and Engineering Company are installed in safety related systems at Peach Bottom Atomic Power Station.
Should yo2 have any questions or require additional information, please do not hesitate to contact us.
Very truly yours, y,-
.,/jY 9, f. l
./
_L
' cc:
United States Nuclear Regulatory Commission Office of Inspection and Enforcement Division of Reactor Construction Inspection Wauhington, DC 20555 346 34e non900s c>
>