ML19225A139
| ML19225A139 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 07/13/1979 |
| From: | Opeka J NORTHEAST UTILITIES |
| To: | NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA) |
| Shared Package | |
| ML19225A140 | List: |
| References | |
| MP-2-4079, NUDOCS 7907180466 | |
| Download: ML19225A139 (1) | |
Text
-
MoltrHi!JuiT UTII.fril!!i ARTFORD CONNECTICUT 06101 (203) E66-6311
=
k L i ;
July 13, 1979 MP 4079 Director Office of Management Information and Program Control U.S. Nuclear Regulatory Commission "ashington, D.C.
20555
Reference:
Facility Operating License No. DPR-65 Docket No. 50-336
Dear Sir:
This letter is forwarded to provide the report of operating and shutdown experience relating to Millstone Unit 2 for the Month of June 1979 in accordance with,pyndix A Technical Specifications, Section 6.9.1.3.
One additional copy of the report is enclosed.
Yours truly, t
- (Lk%
. F. 9peka Station Superintendent Millstone Nuclear Power Station JF0/GH/mw cc: Director, Office of Inspection and Enforcement, Region 1 Director, Office of Inspection and Enforcement, Washington, D.C. (10) h 9 \\
\\
v;,
347 005 7907183W6