ML19225A139

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Rept for June 1979
ML19225A139
Person / Time
Site: Millstone Dominion icon.png
Issue date: 07/13/1979
From: Opeka J
NORTHEAST UTILITIES
To:
NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA)
Shared Package
ML19225A140 List:
References
MP-2-4079, NUDOCS 7907180466
Download: ML19225A139 (1)


Text

-

MoltrHi!JuiT UTII.fril!!i ARTFORD CONNECTICUT 06101

= (203) E66-6311 k L i ; ,

July 13, 1979 MP 4079 Director Office of Management Information and Program Control U.S. Nuclear Regulatory Commission "ashington, D.C. 20555

Reference:

Facility Operating License No. DPR-65 Docket No. 50-336

Dear Sir:

This letter is forwarded to provide the report of operating and shutdown experience relating to Millstone Unit 2 for the Month of June 1979 in accordance with ,pyndix A Technical Specifications, Section 6.9.1.3. One additional copy of the report is enclosed.

Yours truly, t

  • (Lk%

. F. 9peka Station Superintendent Millstone Nuclear Power Station JF0/GH/mw cc: Director, Office of Inspection and Enforcement, Region 1 Director, Office of Inspection and Enforcement, Washington, D.C. (10) h 9\ \

v;, 347 005 7907183W6