ML19225A063
| ML19225A063 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 05/25/1979 |
| From: | Trimble D ARKANSAS POWER & LIGHT CO. |
| To: | Seyfrit K NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| 1-059-30, 1-59-30, NUDOCS 7907180225 | |
| Download: ML19225A063 (5) | |
Text
CENTRAL FILES
?e PDR:HQ 441 K
I.
NSIC U R.)
ARKANSAS POWER & LIGHT COMPANY POST OFFICE BOX 551 LITTLE ROCK. ARKANSAS 72203 (501)371-4000 May 25,1979 1-059-30 2-059-14 Mr. K.V. Seyfri t, Direc tor Office of Inspection & Enforcement U.S. f'uclear Regulatcry Comnission Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011
Subject:
Arkansas Nuclear One - Units 1 and 2 Doc ket No. 50-313, 50-368 License flo. DPR-51, NPF-6 IE Bulletin No. 79-10 Requalification Training Program Statistics (File:
1510.1,2-1510.1)
Gentl emen:
The information requested by the subject bulletin is attached.
Please note that Attachment 1 is for Arkansas f!uclear One - Unit 1 and Attachment 2 is for Arkansas Nuclear One - Unit 2.
Very truly yours, b&0V David C. Trimble Manager, Licensing DCT: CSP:gw Attachment cc:
Mr. W.D. Johnson U.S. fluclear Rcgulatory Commission P. O. Box 2090 Russellville, AR 72801 Director of Nuclear Reactor Regulation ATTN:
F.P. Collins, Chief Operator Licensing Branch
}j n J 0 2..
7 Division of Project Management
/
U.S. fiuclear Regulatory Comission Washington, D.C.
20555 7g 72 80935 MEME3ER M'OOLE SOUTH UTiu rrES SYSTEM
c ATTACINENT 1 Utility:
Arkansas Power 6 Light Co.
Date:
May 25, 1979 Facility:
Arkansas Nuclear One - Unit One Operators Senior Operators Exan Exan Exam Exam Exam Exam..
1 2
3 1
2 3
1.
Action 1:
Responses A. Total number failed 0
0 0
0 0
0 annual examination B. Percent that failel 0
0 0
0 0
0 annual exaninati.an 2.
Action 2:
Reeponses A. Percecu recuired to 100 85 90 100 15 71 att end additional lectures B. Nunber of eperators 3/5 6/4 9/S 2/6 3/3 8/s attending specified 6/6 3/s number.of lectures (no.
1/7 2/9 of operators /no, of 1/S lectures) 1/9 1/10 3.
Action 3:
Responses A. Total number attending 0
0 0
0 0
0 accelerated training because secred less than 70 percent on annual written examination B. Percent attending 0
0 0
0 0
0 accelerated training lesson because scored less than 70 percent on annual written exam-ination C. Total number attending 0
0 0
0 0
0 accelerated training because unsatisfactory oral examination Xpo 7nT
./ f f JJ
Operators Senior Operators Exam Exan Exan Exan Exan Exam 1
2 3
1 2
3 D. Percent attending 0
0 0
0 0
0 cccelerated training because unsatisfactory oral exanination Date of Exan 1
January 1976 2
March 1977 3
March 1978
- /
4 Annual Requalification Exaninations have not been completed as of this date.
J Fi avr
ATTACFr!ENT 2 Ut ility:
Arkansas Power and Light Co.
Date:
.Atay 25, 1979 Facility'.
Arkansas Nuclear One - Unit 2 Operators Senior Operata: s Exam Exam 1
1 1.
Action 1:
Responses A. Total Number failed
- First Annual Requalification annual examination Examination is not complete as of this date.
B. Percent that failed ar.nual examination
?.
Action 2:
Responses A. Percent required to attend additional lectures 0
0 B. Number of operators 4/4 1/3 1/8 attending specified 2/9 1/4 2/ 9 number of lectures 3/10 1/7 4/10 3.
Action 3:
Responses A. Total number a ttending 0
0 accelerated training because sc, red less than 70 percent on annual written examination B. Percent attending 0
0 accelerated training lesson because scpred less than 70 percent on annual written exam-ination C. Total number attending 0
0 accelerated training because unsatisfactory oral examination 349 305 ie-em-
s.
Operators Senior Operators Exan Exan 1
1 D. Percant attending 0
0 accelerated training because unsatisfactory
. oral examination Date of Exan 1 First Annual Requalification Exaninations have not been completed as of this date.
2,G 7r J jf /
s t,I -d
-