Submits Info Requested in IE Bulletin 79-10 Re Requalification Training Program Statistics
ML19225A063
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 05/25/1979
From: Trimble D
ARKANSAS POWER & LIGHT CO.
To: Seyfrit K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
1-059-30, 1-59-30, NUDOCS 7907180225
Download: ML19225A063 (5)


Text

.. ,

CENTRAL FILES

?e PDR:HQ 441 K I. NSIC U R .)

ARKANSAS POWER & LIGHT COMPANY POST OFFICE BOX 551 LITTLE ROCK. ARKANSAS 72203 (501)371-4000 .

May 25,1979 1-059-30 2-059-14 Mr. K.V. Seyfri t, Direc tor Office of Inspection & Enforcement U.S. f'uclear Regulatcry Comnission Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011

Subject:

Arkansas Nuclear One - Units 1 and 2 Doc ket No. 50-313, 50-368 License flo. DPR-51, NPF-6 IE Bulletin No. 79-10 Requalification Training Program Statistics (File: 1510.1,2-1510.1)

Gentl emen:

The information requested by the subject bulletin is attached. Please note that Attachment 1 is for Arkansas f!uclear One - Unit 1 and Attachment 2 is for Arkansas Nuclear One - Unit 2.

Very truly yours, b&0V David C. Trimble Manager, Licensing DCT: CSP:gw Attachment cc: Mr. W.D. Johnson U.S. fluclear Rcgulatory Commission P. O. Box 2090 Russellville, AR 72801 Director of Nuclear Reactor Regulation ATTN: F.P. Collins, Chief Operator Licensing Branch }j n/ 7 Division of Project Management J 0 2..

U.S. fiuclear Regulatory Comission Washington, D.C. 20555 7g ,

72 80935 MEME3ER M'OOLE SOUTH UTiu rrES SYSTEM

c ATTACINENT 1 Utility: Arkansas Power 6 Light Co. Date: May 25, 1979 Facility: Arkansas Nuclear One - Unit One Operators Senior Operators Exan Exan Exam Exam Exam Exam..

1 2 3 1 2 3

1. Action 1: Responses A. Total number failed 0 0 0 0 0 0 annual examination B. Percent that failel 0 0 0 0 0 0 annual exaninati.an
2. Action 2: Reeponses A. Percecu recuired to 100 85 90 100 15 71 att end additional lectures B. Nunber of eperators 3/5 6/4 9/S 2/6 3/3 8/s attending specified 6/6 3/s number.of lectures (no. 1/7 2/9 of operators /no, of 1/S lectures) 1/9 1/10
3. Action 3: Responses A. Total number attending 0 0 0 0 0 0 accelerated training because secred less than 70 percent on annual written examination B. Percent attending 0 0 0 0 0 0 accelerated training lesson because scored less than 70 percent on annual written exam-ination C. Total number attending 0 0 0 0 0 0 accelerated training because unsatisfactory oral examination Xpo

./ f f 7nT JJ

Operators Senior Operators Exam Exan Exan Exan Exan Exam 1 2 3 1 2 3 D. Percent attending 0 0 0 0 0 0 cccelerated training because unsatisfactory --

oral exanination Date of Exan 1 January 1976 2 March 1977 3 March 1978

- / 4 Annual Requalification Exaninations have not been completed as of this date.

J Fi avr

ATTACFr!ENT 2 ,_

Ut ility: Arkansas Power and Light Co. Date: .Atay 25, 1979 Facility'. Arkansas Nuclear One - Unit 2 Operators Senior Operata: s Exam Exam _

1 1 ..

1. Action 1: Responses A. Total Number failed *First Annual Requalification annual examination Examination is not complete as of this date.

B. Percent that failed ar.nual examination

?. Action 2: Responses A. Percent required to attend additional lectures 0 0 B. Number of operators 4/4 1/3 1/8 attending specified 2/9 1/4 2/ 9 number of lectures 3/10 1/7 4/10

3. Action 3: Responses A. Total number a ttending 0 0 accelerated training because sc, red less than 70 percent on annual written examination B. Percent attending 0 0 accelerated training lesson because scpred less than 70 percent on annual written exam-ination C. Total number attending 0 0 accelerated training because unsatisfactory oral examination 349 305 ie-em-

s Operators Senior Operators Exan Exan 1 1 D. Percant attending 0 0 accelerated training --

because unsatisfactory

. oral examination Date of Exan 1 First Annual Requalification Exaninations have not been completed as of this date.