ML19224D285

From kanterella
Jump to navigation Jump to search
Notification of 790622 Meeting W/Util in Bethesda,Md to Discuss Induced Seismicity at Facility Site.List of Discussion Items Encl
ML19224D285
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 05/31/1979
From: Tibbitts D
Office of Nuclear Reactor Regulation
To: Baer R
Office of Nuclear Reactor Regulation
References
NUDOCS 7907110268
Download: ML19224D285 (4)


Text

N& Paz ga nc,b o

UNITED STATES 8

',j 3,,(

NUCLEAR REGULATORY COMMISSION

-C WASHINGTON, D. C. 20555 v

NOTE: THIS MEETING RESCHEDULES THE JUNE 5, 1979 MEETING Docket No. 50-395 W3 MEMORANDUM FOR:

Robert L. Baer, Chief, Light Water Reactors Branch No. 2, DPM FROM:

Dean L. Tibbitts, Project Manager, Light Water Reactors Branch No. 2, DPM

SUBJECT:

FORTHCCMING MEETING WITH SOUTH CAROLINA ELECTRIC & GAS COMPANY ON THE SUMMER STATION DATE & TIME:

Friday, June 22, 1979 - 9:00 a.m. - 4:00 p.m.

LOCATION:

Room P-110, Phillips Building Bethesda, Maryland PURPOSE:

To discuss induced seismicity at the Sumer site.

A list of discussion items is enclosed.

PARTICIPANTS:

SOUTH CAROLINA ELECTRIC AND GAS COMPANY (M. B. Whitaker, R. Whorten)

WOODWARD-CLYDE (W. Gardner, J. Lovegreen)

DAMES & MOORE (J. McWnorter)

NRC - STAFF (R. Jackson, P. Sobel, D. Tibbitts)

) h L Te% k Dean L. Tibbitts Light Water Reactors Branch No. 2 Division of Project Management Er-losure:

Discussion Items ccs w/ enclosure:

See next page 7907 3, 9 f {, g DJ

}l

.s Mr. E. H. Crews, Jr., Vice President May 31, 1979 and Group Executive - Engineering and Construction South Carolina Electric & Gas Company P. O. Box 764 Col umbia, South Carolina 29218 cc:

Mr. H. T. Babb General Manager - Nuclear Operations South Carolina Electric & Gas Company P. O. Box 764 Columbia, South Carolina 29218 G. H. Fischer, Esq.

Vice President & General Counsel South Carolina Electric & Gas Company I

P. O. Box 764 Columbia, South Carolina 29218 Fr. Willian C. Fescher President & Chief Officer South Carolina Public Service Authority

'ss 223 North Live Oak Drive N s, Moncks Corner, South Carolina 29461

'N.

I ss s a

s Mr. William A. Williams, Jr.

's s

s Vice President N

South Carolina Public Service Authority 223 North Live Oak Drive Moncks Corner, South Carolina 29461 Wallace S. Murphy, EP.

General Counsel South Carolina Public Service Authority 223 North Live Oak Drive s

Moncks Corner, South Carolina 29461 i'

Troy B. Conner, Jr., Esq.

I Conner, Moore & Corber 1747 Pennsylvania Avenue, N. W.

Washington, D. C.

20006 f

l Mr. Mark B. Whitaker, Jr.

Licensing and Staf f Engineer South Carolina Electric & Gas Company P. O. Box 764~

Col uabia, South Ca rolina 29218 i

i Mr. O. W. Dixon Group Manager, Production Engineering South Carolina Electric & Gas Company P. O. Box 764 Col tobia, South Ca rolina 29218 3 Il l ikh i

h

=

Mr. E. 61. Crews, Jr.

May 31, 1979 w

cc:

Mr. 3 rett Allen Bursey Route 1 Box 93C

[;

Little Mountain, South Carolina 29076 i

  • 7 i

l 6:

I 8

-N wWse 4bd C~.

~

g-

r. -

M.

LE s-

[

N

,P

))I 3

-)

f

,,3 i

d

  • h.#. **
  • t *" $

g A.%.M w.

S. Eh.i,Is

MAY 3 1 E79 DISCUSSION ITEMS FOR JUNE 5, 1979 MEETING WITH SOUTH CAROLINA ELECTRIC AND GAS COMPANY I.

Discussion by applicants of the results of seismic monitoring:

a.

Relationship between seismicity and structural features b

Correlation between seismicity and daily pumping of water from Monticello Reservoir c.

Increase in seismic activity in August 1978 d.

Estimates of the largest earthquake associated with the reservoir II.

Applicants Comparison of USGS accelerograms at the site to the OBE spectra for seismic Category I structures.

III.

Discussion of future monitoring with the applicant's seismic stations.

IV.

Discussion of any large and rapid changes in the level of Monticello reservoir.

771 1 C ei JJt J,

i