ML19224D265

From kanterella
Jump to navigation Jump to search
Forwards Pages from Plant Operating Procedures Re Addition of Feedwater to Hot Dry Steam Generators.Number of Transients Which Are Acceptable Might Be Explored.W/O Encl
ML19224D265
Person / Time
Site: Palisades, Crane  Entergy icon.png
Issue date: 05/25/1979
From: Bates A
Advisory Committee on Reactor Safeguards
To:
Advisory Committee on Reactor Safeguards
References
ACRS-SM-0123, ACRS-SM-123, NUDOCS 7907110216
Download: ML19224D265 (1)


Text

%_

,<~Yq

  1. ga arci.,9'o,g UNITED STATES

^

NUCLEAR REGULATORY COMMISSION EN

.,, cf,' r ADVISORY COMMITTEE ON REACTOR SAFEGUARDS 5-

'"J//

!f4 8

WASHINGTON, D. C. 20555 o<y'us,/

May 25, 1979 ACRS Members ADDITION OF FEEDWATER 'IO M7F IRY STEAM GENERA'IORS

SUBJECT:

The attached pages from a set of Plant Operating Procedures from Palisades is interesting in that it cautions the operators not to add feedwater to

'Ihe Committee has a dry steam generator except in a extreme emergency.

heard several statements following 'IMI-2 indicating that water addition to a dry steam generator is all right. The number of such transients wt.ich are acceptable might be explored.

Also note that the operators are instructed to isolate leaks if they know

' f, where they are and it can be done.

i A. Bates Staff Engineer

Attachment:

as stated cc w/o attach: ICaS Technical Staff Qf M

4 4 9 w

e' i et-y

,l g rn s

m

--m

,