Text
.
~
JUN 141975
'd MEMORANDUM FOR: Boyce H. Grier, Director, RI FROM:
Alan E. Finkel, Reactor Inspector
SUBJECT:
REPORT OF ACTIVITIES AT THREE MILE ISLAND (MAY 8-11, 1979)
Site Time The inspector arrived onsite on May 8,1979 and logged in 32 regular hours and 8 overtime hot.rs.
Inspector started at C645 daily and left on Fridav May 11, 1979 at 1530.
Activities Performed Onsite
_ Diesel Generator The inspector witnessed the installation of the (Gray) and (White) diesel cables to the 2-3 and 2-4 bus positions.
The inspector also witnessed the trouble shooting and tercing of the Gray Diesel Engines and Controls asso-ciated with the system.
Back feeding from the 2-3 bus to the Gray Diesel was also performed Juring this period of time.
Steam Generator A and B Short Term Solid Water Coeration The inspector inspected the installation and termination of the 13.2/4.16 KV for the circulating water pumps rated at 2250 horsepower each.
Steam Generater Modification During this inspection period only the "B" modification was being made. The inscector witnessed the electrical installation of the 700 horsepower high pre;sure pump motor.
Testing and phasing of the motor was not completed.
Reacrar Cooiant Pressure Control System The 100 KW heaters for the charging water ;torag tank was in process of being wi ed.
The same for the 100 horsepowe.r charging pump motors.
The motor operated isolation valve was being fabricated.
259 310 7907100535 3
1,a
fjemorandum for Boyce H. Grier 2
_ Cap Gun System Ir.3pectad the installation of trays, conduits, switchgear, fans and power cables for the T.V. and crane equipment.
Installation work still being performed.
Comments The following items were discussed with the licensee:
Installation of the 13.2 KV tr3asformer cables, trays and grounding metho(*..
Separation of power and control cables in trays and inside eqc'ement.
Tie down of power cables in trays.
Cable break-outs of cable trays.
NRR Inouts at Site The above itcms were discussed with both IE and flRR personnel at site. fiRR directed the licensee to correct tne above conditions identified by the inspector with the exception of the separation of power and control cables.
ftRR at this t.me is accepting the power, control and instrumentation cable separa-tion problem in both trays and equipment. The power output of the Gray and White Diesels is being looked at by t;RR to determine if the Turbine Building installation is acceptable. Both outputs of the Gray and White Diesels are together at this poin' in the installation.
Due to dirt during the installation process in the diesel control system fcr the Gray Diesel, the inspector recom: ended a complete cleaning and main.tenance program be instituted prior to the system being put in service.
Durino che diesel control check out, relays were hanging up and it appeared that dirt, grit, etc. may have been the cause for some of the relay problem.
The licensee indicated he would evaluate the above condition.
Alan E. Cinkel Reactor Inspector