j Enclosure to Hove-193-79 Bechtel Associates Professional Corporation
SUBJECT:
MCAR 25 (issued 11/20/78)
Seismic and Environmental Component Qualificatien INTERIM REPORT 4 DATE:
July 5, 1979 PROJECT:
Consuners Power Company Pudland Plant Units 1 & 2 Bec;
- 1 Job 7220 Status of Corrective Action in Process 1.
Attached is Revision S vf the qualification test status report (QTSR).
This document provides pertinent information concerning the status of the qualification test documentation rereview by engineering.
As noted in the QTSR status column, six NCRs have been dispositioned.
They are NCRs 17 $ 3, 17 55, 17 62, 1765, 1776, and 1784.
The sta us of review for ceveral additional tests has chanded from " closed" to "inprocess", since Revision 7.
Vertical revision bars have been added adjacent to these as well as all other changes.
2.
The remaining 45 open NCRs are being tracked weekly.
The respons-ible discipline engineers and procurement expeditors are following up with the vendors to check their progcess in submitting the docu=entation needed to close out the open items.
An example of the coordination ef fort in process is in the area of valve sup-pliers. Seven orders (>b117, M-120, !b123A, M-1233, M-123C, M-125A, and M-125C) are open due to the cotor operator supplier (Limitorque) not having supplied the valve suppliers with the qualification information.
Engineering and procurement repre-sentatives are working activaly with the suppliers to obtain adequate qualification test reports in a uniform manner.
3.
To date, only the previously-identified Foxboro transmitters were unable to meet qualification requirements in the final analysis.
4.
As previously reported, interface and revicw requirements for qualification type documentation requirement is being expanded to include Quality Engineering review.
In the past 3 months. 21 supplier submittals containing 26 documents have been interfaced with and revies.ed by the Quality Engineering group.
5.
In addition, Bechtel Power Corporation created a task force to in-vestigate and r&ommend action on a corporate level, based on problems experienced by current projects.
1he task force has 322 107
- ,e 9070'
o Bechtel Associates Professional Corporation
~
MCAR 25 Interim Report 4 Page 2 released guidance, based on published documents and standards, written to acquaint engineers and designers with criteria to implement qualification requirements when specif ying saf ety-related equipment. The final goal is to obtain vendor documents that will d emons t ra t e - the equipments capability to perf orm as intended in a specified ( esign environment.
This guide is intended to be used for new procurements.
Submitted by: [,'C-9 Z 3 4,';
Approved by:.b O&@72 @
/
Concurrence by:
/y,-.m,---/,-. t e o
s
--s 7/2/4 At tachment:
QTSR Revision 8 dated 6/8/79 e-2# 7 r,.,
J l
IUv
g 8
lI s
ll g i
hd Ted t
t ll t
t t
po o p o.de p
o p
o p
o i t N
i N ni i
N i N i
N h
d h
daf h
d hA d hF d
Sd e
Sd eh S
e S8 e
S9 e
s e
.r e
.r e
.r 7
.r 7
.r u
t pd v i t p vi r h t
vi t/vi t/vi 3
t r pl eu rpeuet r
eu r3 eu r5 eu a
aierq ai r qd a
rq a1 rq a1 rq N
t thiee theery tAee t/ee t/ee 9c S
ssfRr SsRrob sNRr S9Rr S7Rr 7
8r
/
)
n g
8 9
s
/E o
8 i
6 m-i s
t s
3 y
8c-a t
w y
l 2
w 1
l c-ctl 1, e b
e e
a v o-isu 39i 9u 19i 9
2n e
fes 17 v n7f)37v 29 a
R s.
iTe
/e o/ s /e 7l u.
l R
84r i5 wk22r 2/eh RT_
a 11 t1 ec42 42 v-SA u
/n c/na /n
- /et Tn Q
Q C5i A6( rC5 i C4L(
)
8 s 3
8 8
lI k
l
)
n c
s o
y a
i i e l
r s
t r
n y
- a. t u o
y l
2 w
1 l
csd b
e e
a iee s
9u 19i 9
2n fTc t
n7f 37v 29 a
i o l
o/
- /e
- 7l l
r u
i5w 22 r 2/eh a
P s
t1 e 42 42v-u e
c/n
- /n
/et Q
R A6(
C5i C4L(
T
)
l R
e d
C F,
,n B,
Ca O
c n
N
,eo m
)
P n
a x
)di x
xr y
E e
d n i sot
,, i i el R
r 3
n 3
o
,d tCc e
64 d
dh n
ne 2
da i
n n e l
n ntao
_n S
of
- 0. G 1
tAe eEs c
12 eE e i 1
an
- 2. d 0s
- c p mMb i
pE pd r s U
ie T
tR 3
5 o
n 5cexp eS u t
14,pE R pnek n
,),i A
a 3 a 3e esiA RAS r
0AI A Aatc T8 cn so t
r) sSbd A
s
,1
(
P i a S
io hi)2c h2 hu2 h
un
,3.i (
h4.322)
, S e 2 2 q 0. l
,yrr u
n9 fi p t 4.1.e p
pd p
tc l
p 0
- 2. i To7 it aa p
a1 ae1 ae p1 e
F a1 5
l Si/
ca rc10s r0 rc0 rd p hr4I r
59277 6l ce Es8 ec gi01 n g1 go1 goI A, p x
g3 aiu Ti/
pi af1Ni aN) arN aCT 1anen i
a
,,e4D eclf v6 Sf riN
()
r 4
rp r
I
,1 rgl o d
r,02l4 -
li u 1
Ne i
ac I
s iI a
I aE 4
gici n
a211 c31 ctat OR l
peI S 0.t rS1 pts pM n
. asit e
p
.i 2
i irn I
a b pS N s
bN0 bsN gretc) p0 b123.td3 trde bSo3padreC T
u uSNA0 e uA1 ueA uAi p
u rt -
rcyp A
Q S(A(1t S(N St(
S(t 5 pP (ASN A3 S355ASG A(hs C
I F
I L
n A
o e
e U
ndi n
n Q
Eont*
o o
d Ei a a
- n n
t Et cs S
I a*it l
l l
l l
csfn e
a e a e a e
a E
a didie n
t n
t n
t n
t E
t efrl m o
n o n o n o
n E
n uiaat n
e n e n e n
e I
e sldui m
m m
m m
sanQm c
n c n c n c
n c*
n I ua m i
o i o i o i
o i5 o
QtRo m
r*
m r
m r
m r*
m7 r*
SAC s
ie s i s
i s
ie s-i e S
i vn i v i v i
vn i4 vn F
e no e n e n e
no e4 no S
En S
E S
E S
En S3 En g
r g
n dr t
r
- e n
i ee n
e ac i
nt tv e
dr na m pf os ca ps nu if ioo re er sk) at mr) rt l s it rG cr c
aun p
gee v
e(
dae ma tso rnec nl) nrt ef n r doit a eaL ds) a h tu oee l/tsf tN lkk l c I n cvm eda r AnR enn wea a
eiA inofu BeO iaa euW M
Dt(
Facos Dm(
FtT Nf(
no
)
il e tat 8
2 ana
)
1
)
5
)
1
)
4
/ciD 6
4 7
4 6
5
)
Rig 7
7 7
C 7
C 8
Mfi
/
A /
A
/
/ /
/
7 irO
,63
/42
/24 865 22/
cO 5
2 1
1 5
/
1 2
4 9
e(P 1 v/
4v/
4v1 0v/
0v/
s L Nn#
p e8
- e4 e1 e1 e6
/
"3:
S AR(
AR(
AR(
CR(
CR(
' C'
8 g
g 9
ll li d
'c t
ero p
p ron p
n i
s i
d(i iAI h
s hA yn d
h8 6
SA e
s9 pe9e S7 s4 s
9
.c 7
ov7v
/: s7 u
t7vo t/
c /o t0ve1 t
r/er r0 em9r r2 ec U
a a1 rp a3 l o2p a/roR N
t t/en t/
er/p t0 erC 9C S
S5RI S3 Tf3 a S 1 R pN 7
8E
/
n 0
8 8
8
/T o
y 6
i t
3 0
P 7
8 1
1 8C t
s i
y y
C a
t l) 1 1
ctl 2
as b
b 2,
3,
7,
8,
vD isu
- 91 ci 481 581 9) 191 181 191 191 e
fes 67 i s 27 27 n0 n7 s
- 7
- 7
- 7
- 7 RS R W_
i Te
- /l t y
- /l
- /l o8 o/l B/l B/l B/l 8/l l
R 22eil 47 e 47 e i/
i5 a 03 e 04 e 03 e 03 e a
41 vra 42v 42v t1 t1 e 51 v 5/v 51 v 51 v SA u
- /ecn
- /e
- / e c/
c/s
- /e
- 2 e
- /e
- /e TT Q
C4L( a C7L C7L A2 A8(
C4L C1L C3L C3L QS 0
8 8
8 ll no y
i e t
3 0
t r
i y
y 7
8 1
1 atu l) 1 1
csd 2
as b
b 2,
3,
7,
8,
i ee
- 91 ci 481 581 9) 191 181 191 191 fTc 67 is 27 27 n0 n7 s 7
7 7
- 7 i o
- /l ty
/l
- /l o8 o/l B/l B/l B/l B/l l
r 22 eil 47e 47 e i/
i5a 03 e 04e 03 e 03 e a
P 41 vra 42v 42v t1 t1 e 51 v 5/v 51 "
51 v u
- /ecn
/e
- / e c/
c/s
/e
- 2e
/e
- /e Q
C4L( a C7L C7L A2 A8(
C4L C1L C3L C3L ecn h) e E
p5 r
E ne E
a7
) ;r -
of I
, 5 6. g 4 ie (4v5r3 a4 d
tR a
a 35e a
r cn
,R
,Pd 2
i
(
io 2
t
,4 fi
)
,S 3
1 3
4 it s575D ca h7 -
E 5
5 4
7 ec p G5xE sd pi a4(
i E ea e
e e
Sf r1
,dI l r) l l) l 2
i g323 n(
c( s c
cs c
l a
e i e i ie i
a r d 4 5. p p2 t2s t
ts t
u at r - o r
ro r
Q PS55A2 A5d A
Ad A
no ndi Eont*
Ei a a
- 5 Et cs 7
I a*it l
l csfn 4
a e
a e
didie 4
t n
t n
efrl m 3
n o
n o
uiaat e
n e
n sldui d
m m
sanQm ct n
c n
c 1 ua m iS o
i o
i QtRo m
r*
m r*
m SAC sE ie s
ie s
S iE vn i
vn i
F eE no e
no e
SI En S
En S
s
)
ry k
y r
ea c e e
f w osl dr J
sh l el nu l.
nt ho at oW) aa) gco c
o( y rPs rntW ma p
e t( w oia ef sl o
tdh tu l el l el cl J
I n eto ebl aid.
a uao uue eunW M
F gW FtB Rba(
O n
o l
il e 0
tat 4
6 5
ana 4
4
/ ciD
)
)
C
)
Rig C
7 C
8
/
9 m
Mfi
/
7
/
7 B36 u
irO 43/
66/
01/
qj) cO 4
9 4
8 5
5 sg
-Q e(P 0v/
0v/
0v/
(p g p
e8 ce8 e6 p
i S
CR(
CI CR(
(
y g
r l
l e
a v e m
r i
.s p n o
o t
l r e
p n
i I
c sf s sdeenbd i I
nA 7
e
,d n
eedbo e h 8
S d s4 l8rdo tt b
ot SA s4 s
7.s7 e7 aeiT tguttt 7. s7 u
t/ve1 T/dtsT oinnr i t7ve1 t
r1 ec 3naiI rmisoem r/ec a
a/roR r/adv dbr pfb a7roR M
t t0erC e0tpey yuufeiu t/erC 9e S
S 1 R ;N P1 surb HsdoRl s S 2 R pN 7
8W
/
n
/E o
8 8
8 6'3 6
4 i
t s
l 3
2 2
e 8^
a t
8 1
y y
y l
vD O
ctl 3,
4,
b 4
58 8,
b b
1
,b 2,
isu 181 181 9
1
,1 071 293 9
9 a
- 93 e
fes 7
- 7 n7 18 2/
37 n7 n7 36t 17 RS iTe 8/l 8/l o/
- 7l
- 9l
- /l o/
o/
57 p 8/l U
l R
04e 04e i5 0/e 01 e 04 e i0 i0
/e 4 e R "'
a 5/v 5/v t1 74v 7/v 72 v t3 t3 64c 61 v SA u
- 2 e
- 2 e
/ - /e
- 2e
- /e c/
c/
/c
/e T T.
Q C1L C1L A6 C5L C1L C1L A6 A6 E1 a E3L QS
)
5 7
n 8
8 4
4 o
li 4
s 4
i e 6
4 gr e
e e
e 3
r 3
t r
3 2
2 2
3 atu 8
1 y
aa,
ld m
ld csd 3,
4,
b 4
58 8,
3 2
t e1
,bt r1,bt iee 181 181 9
1
,1 071 293 3
,1 391 l g7aS o7 aS fTc 7
- 7 n7 18 2/
37 39 37 oh57t f07t i o B/l B/l o/
7l 9l
/l 7l
/l v c 3 / pE s8/pE l
r 04e 04e i5 0/e 01 e 04e 0/e 06 e t
9eE n5 eE a
P 5/v 5/v t1 74v 7/v 72 v 73 v 72v wi6/cE a6/cE) u 2e
- 2e c/
/e 2e
/e
/e
/e ow 1 cI r
0cI 5 Q
C1L 01L A6 C5L C1L C1L C4L C4L LsE1 a(
TE1 aI 7 e
I
)
c I
d n
I t
e n
S
)
r n
n4 o
)
ne g
o7 r) s E
of i
1 i9 is t
E i e s
.t1 vnRs E)R tR e
9c noAe 4N I
a d
e,
eiPt A
(
cn
,SF (t -
vP
()
io s
2
,N e
1 e-
- 4. t 0di 0. c fi
.R0 n 4en n6n 4
itca 7e do 5o2a
,7 ec m
soi c m s7 pi ee eCt e Dr eD Sf l r l
c ll o
lG-3 i
ci cEe ca1f c(1 l
iu i Ms it2r i
2 a
tq tSb tn3 e t63 u
re rAu re p
r Q
Ar A(S AmG(
A5G no ndi Eont*
Eiaa*
15 Et cs 77 I a*
it l
l csf n a
e a
44 didie t
n t
4s ef rl m n
o n
33 uiaat e
n e
sl dui m
m dd sanQm n
c n
ctt I ua m
o i
o iSS QtRo r*
m r*
m SAC ie s
ie sEE S
vn i vn iEE F
no e no eEE En S
En SI I
)
l r
l e
e ts dr n
in nu cp n dno
)
at i usi auil c c
l srr o
tai ma u oG l rarr ef aks etet tu rcsT Vtsnc in doeT 0 nbee a
yhrI 8 euGl M
Hsp(
4cs(E no
)
il e
,' 3 tat
)
,\\M
.s ana 0
4
)
/ciD 7
7 4
(
~
Rig
- /
6 7
I Mfi C
1
- /
~
~
irO
/33 E72 cO 0
/
/ /
e(P 7 v0 6v0 p
- e1
- e1 S
CR(
ER(
Issued IEEE KR/
Qualification Specification Standards
- and Qualification Qualificaticn (Original Item and FSAR Qualification Specification Test Test P.O. Date)
Manu factu rer CommitmentG**
Quali fi 'ation Reference Procedure Results Status Environmental-Paragraphs 4.1, 8.1.5 IEEE Std 321-71 IEEE Std 323-74*
(ANSI C37.20, Section not part 01 8-2.2.2, temperature contract; and water tight tests) engineering in process of contacting vendor.
E-7/E-7, 480V motor Seismic-Article 4.0 and E-7-58-9, E-7-SC-9, Start Ship:
Rev 6 control IEEE Std 344-75*/**
Appendix A, Paragraph 3/30/79, 3/30/79, 12/1/77A (6/14/76) centers 1.4 (IEEE Std; G-7, in review in review Add-on (Gould)
Rev 4; G-29, Chipment:
Rev 2; and G-30, Rev 1.);
12/29/78F G-29, Article 1.0 Rerev:
l8 (IEEE Std 344-75);
Inprocess i i
G-30, Art.:le 1.0 NCR 1749 (IEEE Std 344-75)
G-321-D 7.0-PANR Environmental-Article 4.0, 8.4 (IEEE E-7-101-1, E-7-129-3, IEEE Std 323-74*/**
Std G-28, Rev 2, 10/7/77, 3/21/79, Paragraph 1.6.1 (IEEE acceptable in review S td '2 3-74 ), G-30 Dev 1, Faragraph 1.6.1 IEEE Std 323-74)
G-321-D 26.1-PANR (test results)
E-ll/E-ll, Battery Selsmic-Paragraphs 4.1, 5.3 E-ll-7-2, E-ll-18-1, Start Ship:
Rev 8 charg s IEEE Std 344-71*
(IEEE Std and G-7, 7/18/77, 2/22/78, 1/6/78A (9/27/74)
(SCI)
IEEE Std 344-75**
Rev 4)
Level 1 (IEEE Level 1 Rerev:
In-l8 G-321-D 7.0-PANR Std 344-75) process.
t NCR 1750 E-11-20-1, E-ll-20-1, 3/14/79, 3/14/79, Level.
Level 1 Environmental-Subparagraph 6.1.3, IEEE Std 323-71
(,,,
IEEE Std 323-74*
(temperature requirements) not part of rg 3 contract;
,y}
letter to endor 3/26/79 r-~)
4 QTSR-Rev 8-6 /8 /79 STisn'S OT D'rN' N'
~
g g
Issued IEEE Qualification Qualification Qualification MR/
Standards
- and Test Test Specificatien FSAR Qualification Specification Results Status (Original Item and Procedure P.O. Date)
Manufacturer Commi tments *
- Qualification Reference Start Ship:
E-12/E-12, Station Seismic-Paragraph 10.1 (IEEE E-12-3 8 -3, 11/6/78A Rev 5 batteries IEEE Std 344-75*/**
Std 344 and G-7, 11/28/78, Rerev: Not Rev 5); G-7, Paragraph Level 3 required (8/25/76)
(Exide) 2.2 (IEEE Std 344-75)
G-321-D 7.0-PANR VYCRs sent to Environmental-Article 10.4 (IEuE E-12-38-3, supplier 12/78 11/2d /78, and 1/79.
IEEE Std 323-74*/**
Std 323)
Level 3 Articles 4.0, 5,3 E-13-25-1, E-13-29-3, Start Ship:
Rev 7 tion centers IEEE Std 344-71*i**
(G-7, Rev 4) 6/11/77, 9/13/78, 9/27/78A E-13/E-13, DC disti;nu-Seisn.ic-In- {8 G-321-D 7.0-PAR acceptable Level 1 Rerev:
process.
'C/11/74)
(Westing-(certification only)
(IEEE Std NCR 1751 house) 344-75)
IEEE Std 323-71 Environmental-None not part of contract; IEEE Std 323-74*
letter to vendor 2/27/79 requesting ANSI and IPCEA certification Paragraphs 4.1 (IEEE E-19-17-3, E-19-32-1, Start Ship:
Rev 6 power supplies IEEE Std 344-71*
Std), 5.3 (G-7, Rev 4) 9/19/77, 3/16/78, 1/6/78A E-19/E-19, Preferred ac Seismic-(10/11f74)
(SCI)
IEEE Std 344-75**
G-321-D 7.0-PANR Level 1 Level 1 Rerev:
In-18 I
ocess.
ACR 1752 IEEE Std 323-71 Environmental-Paragraph 4.1 not part of IEEE Std 323-74*
(IEEE Standard) contract-letter ' o vendor 3/9/79 requesting r,,a verification of p
compliance with IEEE Std
%s 323-71 and IPCEA S-61-402.
(J QTSR-Rev 8-6/8/79 5
STATUS DOCUVENT sty
g l1 sme l
.y d bTb l
oQ eorDn p
s i
e
.htp o
h.AiA e
eiF Y
Ss6l8 t g9 s h t 9 L
s e7b7.en7 stu7 t g/ m / vli / u l/
N 9C u
r n 8 e 0 e pt 4 c h o0 7
t aa2s1rme1sts3 tl/s/eoe/iie/
/C.
a 8
8 t
SF7A2RCM3dwR7
/E S
6T yl 8C ras t
no e
y att,
1 1
1 1
O l,
1 l
tnl4 a
t a-8eoo8 ems 2 6,
7,
8,
9,
vD i
t s
b2
- drn) neu-,
691 692 692 691 RS e
ctl t3,
5tf 7
mne691 isu c s p6 9 3 1tnn/
eor 17 17 17 17 17 U
fes ite17
- iio8 l r
- /l
/l
/l
/l
/l RT pit 02e 02 e 02e 02e 02e SA l
R suc02 e 2brt/
pvs21 v 21 v 21 v 21 v 21v TT iTe mlc
/l 0m i1
- uoa4 une /e
- /e
- /e
- /e
- /e QS u
een /e Esfm(
SETE4L E4L E4L E4L E4L a
isa22v Q
SruE1L g
4 d2 g
n7 yl 2
n a-ra 6
n idE 7
at - 1 o
i e nttE
,1 tne-osse 43 nec0 t
r 4
re I7 emo2,
atu
-,.e itE
- d mnr 91 rs csd 47 iee l71 uecv E
,3 t eoPE7 fTc l/ dninlE52S l r
/l i o
- 9l ei m e a I 7 3 pite2 e 01 ecbs t
E pvs r1 v l
r a
P 2/vomidnr4dE uneu/e 0eroenee4tE SeTd4L uQ E 1 L P c s a m p3 S I ec n
0,
e 2
1 1 2.E r
1 1
ne 5
11E 1
.E of
- 1. 5 47I ie tR 4
R
(
4)
A
)
3 s,
acn s4 P
h2 h11 io h4) -
p3 p
.)
fi p340 a
a 1 3. 7 2
it a
rd r
ca rdv7 gt g77 -
6 ec gte aS a
7 pi aSRD r
r,
,1 Sf r
aE a113 i
aE
,1 pE p
l pE62 bE b52.d a
bE 1
uI u
t u
uIG -
S(
S67S Q
S((G n
o ndi
/
Eont*
4 2
Eiaa*
5 7
7 Et cs 7
l -
I a*it a3 7
csfn 4
t2 1
didie 4
n3 3
efrlm 3
e ulaat md d sldui d
nt t
sanQm ct oS S
I ua m iS r
QtRo m
iE E
SAC sE vE E S
iE nE E
F eE EI I
SI re dr e
nu n
l at eso c
pnn ma oe ef eih) tu ltps I n bamm a
arAa M
Ct(S no
)
il e tat ana 0
/ciD 2
)
Js jJ Rig 4
b Mfi E
7 s
C P
irO
/5/
cO 0
6 e(P 2v/
p
- e8 S
ER(
Issued IEEE Qualification Qualification Qualification MR/
Standards
- and Specification (Original Item and FSAR Qualification Specification Test Test Procedure Results Status P.O. Date)
Manufacturer Commitments **
Qualification Reference E-21/E-21, 5,000V and Seismic-9/22/76A Rev 7 8,000V none*
Rerev:
(Kerite)
Environmental-Paragraph 5.4 (service E-21-8-1, E-21-8-1, Complete.
(6/20/74) power cable IEEE Std 323-74*
design requirements), no 8/5/76, 8/5/76, NCR 1753:
IEEE Std 383-74*
reforence to IEEE Level 1 Level 1 Lispositioned 8
2/13/79.
standards E-22/E-22, 600V power Seismic-2/1/77A Rev 3 cable (Essex) none*
Rerev:
In-(8 (4/2/76) process.
I NCR 1754 Environmental-Appendix A (engineering E-22-40-1, E-22-5-1, Cable sent to IEEE Std 323-74*/**
data), no reference to 2/16/79, 8/18/76, field for IEEE Std 383-74*
IEEE Standards Level 1 Level 1 inspection 1/2/79.
Subparagraphs 8.2.3, 8.3, E-22-6-1, and 12.3.3 (IEEE Std 7/17/76, Level 1 383-74)
G-321-D 26.2-PANR E-22-8-3, E-22-9-3, E-22-11-3, E-22-12-2.
E-22-14-2, E-22-15-2, E-22-17-2, E-22-18-2, 3/12/79, Level 2 E-22-10-3, 5/3/77, acceptable E-22-13-1, E-22-16-1, 3/15/77,
(/J acceptable h)
E-22-19-1
J through E-22-22-1, 4/18/77, acceptable L3 QTSR-Rev 8-6/8/79 7
<TATUS PCC NENT CNLY
Issued IEEE KR/
Qualification Specification Standards
- and Qualification Cualification (Original Item and FSAR Qualification Specification Test Test P.O. Date)
Manu f ac tu re r Commi tmen ts *
- QualificLtion Re ference Procedure Results Status E-22-23-1, E-22-24-1, 6/16/77, acceptable E-22-26-2, E-22-27-3, E-22-29-1, 8/18/77, acceptable E-22-28-1, 7/29/77, Level 1 E-22-30-1, E-22-31-1, 10/3/77, acceptable E-26/E-26, 600V control Seismic-Start Ship:
7/26/77A Rev 4 cable none*
Rerev:
(10/29/76)
( Roc kbestos )
Complete.
NCR 1755:
Dispositioned 0
2/13/79.
Environmental-Article 4.0 (IEEE E-26-27-2, E-26-27-2, IEEE Std 323-74*/**
Std 323-74) 2/12/79, 2/12/79, IEEE Std 383-74*
Article 4.0, 7.3, 11.3 Level 1 Level 1 (IEEE Std 383-74)
G-321-D 26.2-PANR U
r%)
INJ
__4 C:'
8 QTSR-Rev 8-6/8/79 STATUS _DOct?EN* CNLY
5 S
Issued IEEE MR/
Qualification Specification Standards
- and Qualification Qualification (Original Item and FSAR Qualification Specification Test Test P.O. Date)
Manufacturer Comm i tments *
- Qualification Reference Procedure Results Status E-45/E-45, a.
480Vac dis-Seismic-Articles 4.0, 5.3 E-45-22-3,j E-45-22-3,l Start Ship:
g 8
Rev 3 tribution IEEE Std 344-75*/**
(IEEE Std 344-75 and in review I in review I ll/10/76A (9/26/77) panels G-7, Rev 5); G-7, Para-Rerev:
In-lg 120Vac and graph 2.2 (IEEE Std 344-process.
I 125Vdc 75); G-30, Rev 1, NCR 1756.
distribution Paragraphs 1.1.1, 1.6, panels 1.7 (IEEE Std 344-75)
(Square D)
G-321-D 7.0-PAR (prototype test only)
Environmental-Articles 4.0, 5.2, 12.2.1 E-45-10-3, E-45-10-3, IEEE Std 323-74*/**
(IEEE Std 323-74); G-30, 6/12/78, 6/12/78, Rev 1, 1.6 (IEEE Level 1 Level 1 Std 323-74) b.
120Vac Seismic-Articles 4.0, 5.3 E-45-54-3, E-45-54-3, Start Ship:
8 4/24/79, 8
1/12/79A preferred IEEE Std 334-75*/**
(IEEE Std 344-75 and 4/24/79, panels G-7, Rev 5); G-7, Para-Level 1 Level 1 VPCR sent to graph 2.2 (IEEE Std Supplier 1/79 344-75); G-30, Rev 1, Paragraphs 1.1.1, 1.6, 1.7 (IEEE Std 344-75)
G-321-D 7.0-PAR (prototype test only)
Environmental-Articles 4.0, 5.2, 12.2.1 E-45-51-2, E-45-51-2, IEEE Std 323-74*/**
(IEEE Std 323-74); G-30, 2/1/79, 2/1/79, Rev 1, 1.6 (IEEE Level 1 Level 1 Std 323-74) c.
120Vac Seismic-Articles 4.0, 5.3 E-45-55-3, E-45-55-3, Stert ship:
control and IEEE Std 344-75*/**
(IEEE Std 344-75 and 4/24/79, 8
4/24/79, 8
12/21/78A instrument G-7, dev 5);
G-7, Para-Level 1 Level 1 panels graph 2.2 (IEEE Std 334-75); G-30, Rev 1, Paragraphs 1.1.1, 1.6, 1.7 (IEEE Std 344-75)
G-321-D 7.0-PAR (prototype test only)
Environmental-Articles 4.0, 5.2, 12.2.1 E-45-63-1, E-45-63-1, (f4 IEEE Std 323-74*/**
(IEEE Std 323-74); G-30, 1/17/79, 1/17/79, Rev 1, 1.6 (IEEE Level 2 Level 2 pgj Std 323-74) ps) 4 9
QTSR-Rev 8-6/8/79 STATUS DOCl* MENT CNLY
=
Issued IEEE MR/
Qualification Specification Standards
- and Qualification Qualification (Original Item and FSNR Qualification Specification Test Test P.O. Date)
Manu f acturor.
Commitments **
Qualification Reference Procedure Results Status d.
125Vdc Seismic-Articles 4.0.
5.3 E-45-53-3, E-45-53-3, Start ship:
distributis4.
TEEE Std 344-75*/**
(IEEE Std 344-75 and 4/24/79, 8
4/24/79, 9
2/7/79A panels G-7, Rev 5);
G-7, Para-Level 1 Level 1 graph 2.2 (IEEE 344-75);
G-30, Rev 1, Paragraphs 1.1.1, 1.6, 1.7 (IEEE Std 344-75)
G-321-D 7.0-PAR (prototype test only)
Environmer.tal-Articles 4.0, 5.2, 12.2.1 E-45-52-1, E-45-52-1, IEEE Std 323-74*/**
(IEEE Std 323-74); G-30, 11/30/78, 11/30/78, Rev 1, 1.6 (IEEE Level 1 Level 1 Std 323-74)
E-49/E-49, Station Seismic-Articles 4.0 (IEEE Std),
E-49-2-3, E-49-2-3, Start Ship:
Rev 3 battery IEEE Std 344-75*/**
7.1.1 (IEEE Std 344-75),
9/26/78, 9/26/78, 5/26/78A (10/31/77) fused dis-7.1.2 (G-7, Rev 5)
Level 1 Level 1 Rerev:
In-lg connect G-321-D 7.0-PANR process.
l switches Environmental-Articles 4.1 (IEEE Std),
NCR 1757 (Gould)
IEEE Std 323-74*/**
7.2.1 (IEEE Std 323-74)
E-49-7-2, G-321-D 26.2-PANR in review E-051B/E-051B, Instrument ac Seismic-Articles 4.0, 5.2, 11.2 E-51B-15-2, Action by Start Ship:
8 Rev 1 power trans-IEEE Std 344-75*/**
(IEEE Std 344-75); G-7 11/6/78, 8
6/30/79 11/16/79F (11/4/77) formerr and Rev 5, Paragraph 2.2 Level 1 Rerev: Not regulator (IEEE Std 344-75); G-30, (regulator required transformers Rev 1, Paragraphs 1.11, transformer)
(SCI) 1.6, 1.7 (IEEE Std To be resubmitted 344-75)
G-321-D 7.0-PANR Environmental Articles 4.0, 11.2 E-51B-13-5, Action by IEEE Std 323-74*/**
(IEEE Std 323-74) 2/21/79, 6/30/79 G-321-D 26.2-PANR Level 1 (certified test reports (regulator before shipment) transformer) bJ ib
~,
ij 10 QTSR-Rev 8-6/8/79 STATUS DOCUME C CNLY
a Issued IEEE MR/
Qualification Specification Standards
- and Qualification Qualification (Original Item and FSAR Qualification Specification Test Test P.O. Date)
Manufacturer Commitments **
Qualification Reference Procedure Results Status Start Ship: lg E-56/E-56, Coax, triax, Seismic-6/30/79F l
Rev 1 and twinax none*
Rerev: Not (6/22/78) cable required
( Rockbestos )
Environmental-Articles 4.0, 10.5.5 E-56-8-3, E-56-8-3, IEEE Std 323-74*/**
(IEEE Std 323-74);
2/21/79, 2/21/79, Appendix A (engineering Level 2 Level 2 IEEE Std 383-74*
data)
Articles 4.0, 7.1, 7.3, 7.4, 10.5.4 (IEEE Std 383-74)
G-321-D 26.0-PANR (approval before shipment)
Start Ship:
E-060/E-60, Instrument and Seismic-1/26/79A Rev 1 special pur-none*
Rerev: Not (8/17/78) pose cable required
( Rockbes tos )
Environmental-IEEE Std 323-74*/**
Articles 4.0, 11.5.5 E-60-21-2, Test to start (IEEE Std 323-74) 1/3/79, 3/2/79 (120 IEEE Std 383-74*
Appendix A (engineering Level 3 day duration data)
Articles 4.0, 7.0, 7.1 E-60-21-2, 7.3, 7.4, 11.5.4 (IEEE 1/3/79, Std 383-74)
Level 3 G-321-D 26.2-PANR (test results)
E-205/E-205, Metalc' Seismic-Articles 4.0, 5.3 Not required E-205-222-1, Start Ship:
Rev 8 switc!
r IEEE Std 344-71*/**
(G-7, Rev 4) per engineering 6/7/76, 12/9/76A G-321-D 7.0-PANR acceptable Rerev:
In-g (4/24/74)
(ITE)
(certifica-process.
tion only)
NCR 1758
'd Environmental-Article 4.1 (ANSI C37.09, E-205-467-1, I\\J IEEE Std 323-74*
Section 4.15, requirements 3/8/79, In review for temperature and INJ total expected life)
(certification only)
~.
~...
~3 QTSR-Rev 8-6/8/79 11 STATUS _DCCUVES"" CNg
Issued IEEE FR/
Qualification Specification Standards
- and Qualification Qualification (Original Item and FSAR Quali fication Specification Test Test P.O. Date)
Manu factu re r Commi tments *
- Qualification Peference Procedure Results Status J-201/J-201, Main control Seismic-Paragraphs 1.5b, J-201-286-1, Start Ship:
Rev 5 boards IEEE Std 344-75*/**
2.1.lc, 2.1.5, 4.1.2, 8/16/77, e/19/77A (4/14/75)
(Magnetics) 13.0, Attachment 5, acceptable Forev:
Rev 1; Paragraphs Inprocess.
4.1.15, 13.1.1, NCR 1759 Attachment Sa, Para-J-201-287-2 J-201-287-2 Letter to CPCo graphs 1.3, 2.0, 2.8, through 289-2, through 289-2, BLC 7636 8 b, 1.3, and J-201-296-2 and dated 5/25/79 2.0, 2.7, 5.0 (IEEE Std through 300-2, J-201-296-2 344) 8/10/78, th"ough 300-2, G-321-D 7.0-PAR Level 1 8/10/78, (procedures and reports)
Level 1 J-201-318-2 and J-201-318-2 and 321-2, 8/10/78, 321-2, 8/10/78, Level 1 Level 1 J-201-397-1, J-201-397-1, 2/28/78, 2/28/78, Level 1 Level 1 J-201-410-1, J-201-410-1, 8/10/78, 8/10/78, Level 1 Level 1 Environmental-Subparagraph 4.1.13 SCN issued IEEE Std 323-74*/**
11/29/78 Article 5.0 which incorpor-8 (service conditions) ates IEEE G-321-D 26.1-PAR Std 323-74 (test procedures)
G-321-D 26.2-PANR (test report)
J-202/J-202, Auxilia.y/
Seismic-Articles 2.2.1, 9.3.1, J-202-79-1, J-202-79-1, Start Ship:
Rev 5 local control IEEE Std 344-75*/**
9.3.2, (IEEE Std 344-75) 10/6/77, 10/6/77, 3/10/78A (12/20/77) boards (Harlo) acceptable acceptable Rerev:
Inprocess.
NCR 1760
(,
'd Environmental-Article 4.1
\\)
7EEE Std 323-74*/**
(service conditions)
~,
8' s )
C.
12 QTSR-Rev 8-6/8/79 STATUS DOCUMEN'_CNLY
Issued IEEE MR/
Qualification Specification Standards
- and Qualification Qualification (Original Item and FSAR Qualific ation Specification Test Test P.O. Date)
M3nufacturer Commitments **
Qualification Reference Procedure Results Status J-204/J-204, Major Seismic-Subparagraphs 4.1.3 J-204-33-1, J-204-33-1, Start Ship:
Rev 6 ins t1urent IEEE Std 344-71*/**
(IEEE Std 344-71);
in review in review 11/24/70A 8
(5/3/74) package unstrument racks, Subparagpaph 5.1.2 8
8 Rerev:
In-(Foxboro) tack mounted (C-6, Rev 4 and J-204-244-1, J-204-244-1, process.
j g
instrumentation G-7, Rev 4); 6.1 in review in review NCR 1761.
and pcwer supplies)
G-321-D 7.0-PAR Discrepancy has been resolved by deleting field transmitters from P.O.
J-204 and issuing new P.O.
J-245 in 2/79A.
IEEE Std 344-71*
IEEE Std 344-75**
J-204-33-2, J-204-33-2, (panel mounted 2/26/79, 2/26/79, electronic acceptable acceptable controllers)
J-204-147-1, J-204-147-1, Vendor requalifi-9/8/76, 9/8/76, cation in process, acceptable acceptable To be resolved late 1979.
J-204-176-1, J-204-176-1, 9/21/77, 9/21/77, acceptable acceptable J-204-230-1, Currently 4/18/78, 8
being tested.
Level 2 Resulis by (IEEE Std 344-75) 9/30/7S.
Environmental-Subparagraph 4.1.2 and J-204-189-1, IEEE Std 323-74*
6.1 (IEEE Std 323-71),
6/27/77, Subparagraph 5.1.1 information only, (J-1564) rack mounted modules only IEEE Std 383-74*
Subparagraphs 4.1.6 and (IEEE Std 344-75 7.3 (IEEE Std and IEEE Std C-321-D 26.0-PANR 323-74) l'i (test results) iM tb b
6
)
13 QTSR-Rev 8-6/8/79 STATUS DCCUVENT CNt.,Y
Issued IEEE Mh/
Qualification Specific
- tion Standards
- and Qualificatlon Qualification (Origincl Item and FSAR Qualification Specification Test Test P.O. Dat'[_
Manufacturer Commitments **
Qualification Reference Procedure Results Status J-207/J-207, Engineering Seismic-Section 2B J-207-16-3, J-207-85-3, Start Ship:
Rev 4 safety fea-IEEE Std 344-75*/**
(IEEE Std 344-75) 2/13/78, 10/23/78, 6/30/78A (3/11/77) tures Secticn E2 Level 1 Level 1 Rerev:
actuation (G-7, Rev 5)
- Complete, 0
NCR 1762:
system C-321-D 7.0-PAR Dispositioned (Vitro Lab) 5/4/79.
Environmental-Section 2B, SE1 J-207-18-?,
J-207-222-1, IEEE Std 323-74*/**
(IEEE Std 323-74) 10/19/77, 10/19/78, IEEE 383-74*
Article 4.0 Level 1 Level 1
( se rvice conditions)
J-207-16-3, 8
J-207-16-3, 2/13/73, 2/13/78, 8
Level 1 Level 1 (radiation)
Certification Section 2B (IEEE Std 383-74) of compliance G-321-D 26.0-PAR shipped to field with ESFAS docu-mentation package.
J-214/J-214, Seismic Seismic-Paragraphs 2.2 (IEEE Std J-214-1-1, J-214-1-1, Start Ship:
l8 Rev 1 instruments IEEE Std 344-75'/**
344), 3.3.1 2/5/79, 2/5/79, 7/1/79F l
(9/13/78)
(Terra (IEEE Std 344-75),
Level 2 Level 2 Rerev: Not Technology)
Subparagraphs 4.1.2, required.
7.1.4 (G-6, Rev 5 and Reviewed by G-7, Rev 5), and civil and found Article 6.1 (design qualification) acceptable.
Attachment M to MR, Sh 2 Environmental-Attachment M to MR Not required Not required (jg none*
(J-1564, Rev 0) psg f> )
l' J I.)
14 QTSR-Rev 8-6/8/79 STATUS I;0C'JMENT CN: Y
=
8 Issued IEEE MR/
Qualification Specification Standards
- and Qualification Qualification (Original Item and FSAR Qualification Specification Test Te.st P.O. Date)
Manu f actu rer Commi tments *
- Qualification Reference Procedure Results Status J-229/J-563, Temperature Seismic-none*
Attachment E to MR Not required Not required Start Ship:
g Rev 3 switches (J-1564, Rev 2) 5/18/79A Rerev: Couplete.
(2/14/57)
(Thermowells)
Bulk shelf items (United previously Electric qualified.
Controls)
No further qualification necessary.
Environmental-Attachment E to MR Not required Not required none*
(J-1564, Rev 2)
J-232/J-435, Orifice Seismic-none*
Paragraphs 1.1.1, Not required Not required Start Ship:
Rev 3 plates for (ASME Code,Section III, ll/ll/79F (3/29/77) nuclaar Division 1, Classes 2 Rerev:
service or 3)
Complete.
Bulk shelf items (Vickery-previously Simms) qualified.
No further qualification necessary.
Environmental-Attachment C to MR Not required Hot required none*
(data sheets)
J-233/J-563, Resistance Seismic-none*
Par.
aphs 1.1.1, 2.2, 13o t re quired Not required Start Ship:
Rev 3 temperature Attachment E to MR ll/14/77A (11/24/76) detector (J-1564, Rev 3)
Rerev:
Complete.
assemblies Bulk shelf items
( The rmowells )
previously (Weed Instru-qualified.
ments)
No further qualification necessary.
L/J Environmental-Attachment E to MR Aot required Not required none*
(J-1563, Rev 0)
J-241, Pressure Seismic-Paragraphs 2.2, 6.1, Field purchase Field purchase Start Ship: NA gages, nuclear IEEE 344-75*
and Attachment 4 to ETL RPT 4947 TL RPT 4947 Rerev:
Rev 5 8
(9/3/76)
.~, 3 service MR (J-1564, Rev 1) 2/13/73 2/13/73 8 Complete.
', ~
(field G-321-D 7.0-PAR acceptable acceptable purchase)
(issued for bids) 15 QTSR-Rev 8-6/8/79 c T AT"s r'mP;- '. 5
9 Issued IEEE MR/
Qualification Specification Standards
- and Qaalification Qualification (Original Item and FSAR Qualification Specification Tesc Test P.O. Date)
Manufact2rer Commitments **
Qualification Reference Procedu a Results Status Environmental-Paragraph 4.1 and Field purchase Field purchase none* to MR (J-1564, Rev 1)
J-242/J-425, Venturi tubes, Seismic-none*
Appendix D, Article 2.4 Start Ship:
Rev 3 nuclear of J-425, Rev 5 7/21/78A Rerev:
[g (4/29/77) s e rvice (B.I.F.)
Complete.
I Bulk shelf items previously qualified.
No further quali-fication necessary.
Environmentri-Appendix D, Article 3.0 Not required Not required none*
o f J-425, Rev 1 and Attachment C to MR (data sheets)
J-245 Field Seismic-Paragraph 5.4.la, Start Ship:
Rev 0 9
Transmitters IEEE Std 344-75*
Appendix A 8/18/79F (3/15/79)
(Rosemount)
Environmental-Paragraph 5.3.2, IEEE Std 323-71** to MR IEEE Std 323-74*
(see response to RG 1.89 FSAR Appendix 3A)
J-253/J-253, Atmospheric Seismic-none*
Paragraph 5.2 J-253-23-4, J-253-23-4, Start Ship:
Rev 3 ste am (seismic criteria) 7/28/76, 7/28/76, 12/1/77A (6/7/74) dump valves G-321-D 7.0-PAR acceptable acceptable Rerev:
(CCI)
Complete Environmental-Paragraph 5.1 Not required Not required none*
(environmental criteria)
J-255 A, Nuclear Seismic-none*
Paragraph 5.3, 5.4 J-255A-19-1, J-255A-19-1, Start Ship:
J-255. Rev 8 se rvice s (seismic critera);
12/23/75, 12/23/75, 6/5/78A (7/8/74) control G-9, 4.2 (IEEE Std 344): Level 1 Level 1 Rerev:
In-lg valves 7.1 (IEEE Std) process.
l y
(Uulcan (A)
G-321-D 7.0-PAR NCR 1763 a
and CCI (B) 7 s
/'*
N.,e s
16 QTSR-Rev 8-6/8/79 STATUS DOC" VENT CNLY
Issued IEEE MR/
Qualification Specification Standards
- and Qualification Qualification (Original Item and FSAR Qualification Specification Test Test P.O. Date)
Manu facture r Commitments **
Qualification Reference Procedure Results Status J-255B/
J-255B-25-2, J-255B-25-2, Start Ship:
J-255, Rev 8 8/31/76, 8/31/76, 8/1/76A (7/9/74) acceptable acceptable Rerev:
In-process Environmental-Paragraph 5.2 Action by l8 J-255B-62-3, This report none*
(environmental criteria) 8/15/79 l
4/21/79, 8 covers Rotork and Attachment F to J-255 Level 3 valve operators.
(G-9, Rev 2)
(informational document, and actual test report).
J-256/J-603, Nuclear Seismic-Article 4.0 (IEEE Std J-256-45-3, J-256-45-3, Start Ship:
Rev 6 service IEEE Std 344 344): Appendix A 7/24/78, 7/24/78, 6/78A (7/16/76) solenoid Article 2, Appendix I Level 1 Level 1 Rerev: In-valves (design limits process.
(Target Rock qualification NCR 1764 Co rp )
J-256-71-2, Action by lg Discrepancy 7/24/78, 8/15/79 I
on J-256-45-J Level 1 resolved by J-256-71-2.
Environmental-Article 4.0 J-256-42-1, J-256-42-1, IEEE Std 323-74*/**
12/8/77, 12/8/77, IEEE Std 382-72*/**
Paragraph 5.1 and acceptable acceptable Appendix J (environmental criteria)
Article 4.0 J-256-42-1, J-256-42-1, J-256-42-1 (IEEE Std 382);
12 /':/77, 12/8/77, request to Paragraph 5.1 and acceptable acceptable
- vendor, R.L.
Attachment G Castleberry (G-29, Rev 1) to R. Wells (TRC) 1/24/79.
LeJ N
tN)
( ~)
(n 17 QTSR-Rev 8-6/8/79 STATUS DOCUVENT ONLY
9 Issued IEEE MR/
Qualification Specification Standards
- and Quaiffication Qualification (Original Item and FSAR Qualification Specification Test To t P.O. Date)
Manufacturer Commi tment s *
- Qualification Reference Procedure Results Status J-258/J-605, Nuclear Seismic-Article 4.0 J-258-21-1, J-258-21-1, Start Ship: lg Rev 8 se rvice IEEE Std 344-75*/**
(IEEE Std 344-75),
6/17/76, 6/17/76, 5/79A l
(7/29/75) butterfly Paragraph 5.1; Appen-acceptable acceptable Rerev:
control dix I,
Paragraph 4.2 Complete.
valves (IEEE Std 344)
NCR 1765:
(Fisher Dispositioned 8 Controls) 4/20/79.
J-258-39-1 J-258-39-1 through through J-258-55-1, J-258-55-1, 3/20/78, 3/20/78, Level 1 Level 1 Environmental-Paragraph 5.1 and Refer to letter IEEE Std 323-74*/**
Appendix L from Fisher IEEE Std 382-72*
(environmental criteria) controls 10/18 78 no reference to (File J-258-PL)
IEEE Standards Article 4.0 J-258-40-1, J-258-40-1, ITT actuator (IEEE Std 382);
4/18/78, 4/18/78, qualifications to G-9, Paragraphs 4.2 Level 1 Level 1 be submitted; (IEEE Std 382)
(Limitorque (Limitorque letter from Fisher Paragraphs 4.0, 7.13 cperators) operators) 3/6/79 requesting IEEE 382-72)
$600 for liner and ITT actuator test reports.
J-275/J-275, Engineering Seismic-Paragraphs 2.2, 3.3.3 J-275-68-2, J-275-58-2, Start Ship:
Rev 3 safety IEEE Std 344-75*/**
(IEEE Std 344-75);
6/7/78, 6/27/78, 4/1/78A (8/17/77) isolation Section 4.1.3 Level 1 Level 1 Rerev: In-system (G-7, Rev 5) process.
(CCC)
G-321-D 7.0-PAR NCR 1766 J-275-76-1, 6/28/78, (ja Level 1 pg) f\\)
Environmental-Paragraphs 2.2, 3.3.3,5.1 J-275-75-2, J-275-79-1, IEEE Std 323-74*/**
(IEEE Std 323-74);
7/5/78, 7/5/78, Subpart;raph 4.1.1 Level 1 Level I
--a rsj (J-156s )
g IEEE Std 383-74*
Paragraphs 2.2, 6.7.1 J-275-80-1, (IEEE Std 383-74) 7/11/78, G-321-D 26.2-PANR Level 1 18 QTSR-Rev 8-6/8/79 STATUS DOCL?*ENT CNtY
9 Issued IEEE MR/
Qualification Specification Standards
- and Qualification Qualification (Original Item and FSAR Quali fication Specification Test Test P.O. Date)
Manu factu re r Commitments **
Qualification Reference Procedure Results Status J-275-81-1, Requast to 7/13/78, Vendor 11/6/78.
Level 1 Response by lg (Certificate 7/79F.
I of compliance)
J-278/J-278, Room water seismic Section 2.2, 3.3.3, J-278-5-2 Start Ship:
g Rev 3 level safet)
IEEE Std 344-75*/**
6.2.5, 6.4.4, 6.6.4 in review 8/31/79F 8
2/6/79 monitoring (IEEE Std 344-75),
(requires post Qualification system 4.1.3 (G-7, Rev 5) functional test results testing) and conclusion report expected 8/79F (seismic and environmental).
Environment.R Section 3.3.3, 5.1, J-278-14-1, IEEE Std 323-74*/**
6.2.5, 6.6.4 J-278-15-1 8
(IEEE Std 323-74) in review J-284/J-284, Containment Seismic-Section 2B, 3C4 Start Ship:
Rev 1 post-LOCA IEEE Std 344-75*/**
(IEEE Std 344-75);
2/15/80F (5/14/79F, hydrogen Section 4.A.2 Rerev: Not monitoring (G-7, Rev 5) requi red equipment (reissued for bids)
Environmental-Section 2B, 3C4, 5A IEEE Std 323-74*/**
(IEEE Std 323-74);
Section 4A
( 722 0-J-1564, Rev. 3)
M-14/M-14, Auxiliary Seismic-Articles 2.0, 6.1.3, Start Ship:
Rev 3 feedwater IEEE Std 344-75*/**
d.4.1.k, and 6.4.2.e 5/24/78A (12/10/75) p umps (IEEE Std 344-75);
Rerev:
(Bingham-Article 13.0 Complete.
Willamette)
(G-7, Rev 4)
NCR 176'/
8 8
G-321-D 7.0-pap M-14-124-1, M-14-124-1, Action by l8 t
in review in review 6/30/79 l
I (motor driven
{
pumps )
i 19 QTSR-Rev 8-6/8/79 STATUS DOCUME ON7
Issued IEEE KR/
Qualification Specification Standards
- and Qualification Qualification (Original Item and FSAR Qualification Specification Test Test P.O. Date)
M.inu factu re r Commitments **
Qualification Reference Procedure Results Status M-14-125-1, M-14-125-1, Action by g
g in review 3 in review 6/30/79 (turbine driven pumps)
M-14-34-1, M-14-34-1, Action by lg 8/1/ 78, 8/1/78, 6/30/79 I
unacceptable unacceptable M-14-ll8-1, M-14-118-1, 1/5/79, 1/5/79, Level 2 Level 2 (motors)
Environmental-Articles 2.0, 6.4.1.k, M-14-119-2, M-14-119-2, 4/23/79, 8
IEEE Std 323-74*/**
and 6.4.2.e 4/23/79, g
(IEEE Std 323-74) in review in review (motors)
(motors)
M-18/M-18, Emergency Seismic-Subparagraphs 1.6, 3.b.7 M-18-30-3, Refer to Start Ship:
Pev 4 diesel IEEE Std 344-75*/**
and 5.1.14 2/28/78, M-18-370, g 9/22/78A (IEEE Std 344-75);
Level 1 371, 372 for Rerev:
(5/4/77) generators test results Complete.
(Delaval)
Appendix A (G-29, Rev 3)
G-321-D 7.0-PAR M-18-59-4, Refer to 1/25/78, M-18-370, 371 8 Level 1 372 for test (panels) results M-18-370-1, M-18-370-1, To be 2/7/79, 2/7/79, resubmitted Level 3 Level 3 6/79 M-18-371-1, M-18-371-1, To be 2/7/79, 2/7/79, resubmitted Level 3 Level 3 6/79 M-18-372-1, M-18-372-1, To be 2/7/79, 2/7/79, resubmitted L/d Level 3 Level 3 6/79 Ps )
Environmental-Subparagraphs 3.b.7, M-18-389-1, Test results N
IEEE Std 323-74*/**
5.1.la and c, 5/20/79, 8
expected early 8
9.2.k Level 3 1980.
INI (IEEE Std 323-74 )
(switchgear, cabinets per CU IEEE Std 323-74) 20 QTSR-Rev 8-6/8/79 STA'1TS DOC'NENT CNL'r
=
O Issued IEEE MR/
Qualification Specification Standards
- and Qualification Qualification (Original Item and FSAR Qualification Specification Test Test P.O. Date)
Manufacturer Commitments **
Qualification Reference Procedure Results Status M-18-334-4, 5/22/79, Level 1 8
(engine con-trol system components)
M-18-362-1, Test results 6/29/78, expected mid-8 Level 1 1980.
(Class lE motors, etc, per IEEE Stds 323-74, 334-75, 344-75, 387-76)
(generator)
M-19/M-19, Emergency Seismic-Subparagraphs 4.1.1.h, M-19-20-3, M-19-20-3, Start Ship:
8 Rev 2 diesel fuel IEEE Std 344-75*/**
4.2.2, 4.5.2, 10.3.3.c 1/3/79, 1/3/79, 10/79F (7/29/77) trans fer (IEEE Std 344-75);
Level 1 Level 1 Rerev: Not pumps Appendix H, required.
( Chemp ump )
Subparagraphs 1.o.1, 1.7 1.8, 1.9 (IEEE Std 344-75);
Appendix I, Paragraph 3.5 G-321-D 7.0 PAR Environmental-Subparagraphs 4.1.1.h, M-19-2C-2 Expected 8
IEEE Std 323-74*/**
4.2.2, 4.5.3, 10.3.3.c 4/3/79 8
19j1779 (IEEE Std 323-74);
Level 3 Appendix H, Subparagraph 1.6.1, 1.7, 1.8, 1.9 (IEEE Std
'ppendix I, 323-74);
Articles 3.0, 4.0; E-10, Rev 9, Subparagraph ll.3a,b (ja (IEEE Std 323-74, p)
IEEE Std 334-74)
IN
~O 21 QTSR-Rev 8-6/8/79 STATUS DCCt_JVENT ONLY
Issued IEEE Qualification Qualification Qualification MR/
Standards
- and Test Test Specification FSAR Qualification Specification Results Status Procedure (Original Item and Qualification Reference Commitments **
M-020/M-020, Traveling Seismic-Page 3, MR, Paragraphs A-20-21-3, M-20-21-3, Start Ship: [8 P.O.
Date)
Manufacturer IEEE Std 344-75*/**
1.c and 1.d; 3/13/79, 3/1' /79, ll/10/78A I
Level 1 Level 1 Rerev: Not,
required Rev 2 water screens (8/01/77)
(FMC)
Subparagraphs 3.B.9, 4.A.1, S.E.6, 6.A.1; Appendix B, Articles 1.A.27, 2.A, Motors and 2.B, 4.C, S.B; controls are E-10, Paragraphs not Class lE.
2.10, 3.1 (IEEE Std);
G-5, Paragraphs 2.0 (IEEE Std);
G-30, Paragraph 1.0; Subparagraphs 1.1.1, 1.7 (IEEE 344-75)
G-321-D 7.0 PAR Not required Not required Environmental-none*
M-51-51, M-51-51, Start Ship:
Paragraphs 4.12, 2/18/76, 2/18/76, 3/10/78A M-51/M-51, Component Seismic-Rev 4 cooling IEEE Std 344-71*
acceptable acceptable Rerev:
7.4.b, Appendix 1, Complete.
(2/5/74) water heat 2.0, 5.0 NCR 1768 exchangers (G-7, Rev 4)
( Yut 's )
Not required Not required Environmental-Articles 3.0, 3.1.2, 3.2.3, (see FSAR none*
Table 3.11-4, Appendix 1 Test 16)
M-52-27-8, M-52-27-8, Start Ship:
Rev 5 cooling water 1EEE Std 344-71*
(G-7, Rev 4), 4.9, 7.4; 1/30/78, 1/30/78, 12/21/77A Paragraphs 4.4 M-052/M-052, Component Seismic-E-10, Rev 8, 2.10, 3.1 Level 1 Level 1 Rerev:
Inprocess.
(5/13/74) pump motors NCR 1769 (B&W Canada)
Telex received Subparagraphs 3.1.2, 5/23/79.
Environmental-IEEE Std 323-74*
3.3.2, 4.10.1, 4.10.16, Siemens-Allis 8
4.11.2; E-10, Rev 8, is presently Paragraphs 2.9, proceeding with IN3 3.1 test program.
tM vi C
QTSR-Rev 8-6/8/79 22 STATyS_DOCyMENT CNLY
Issued IEEE MR/
Qualification Specification Standards
- and Qualification Qualification (Original Item and FSAR Qualification Specification Test Test P.O. Date)
Manufacturer Commi tments *
- Qualification Reference Procedure Results Status M-53/M-53, Component Seismic-Paragraphs 2.2, 5.4.1, M-53-24-5, M-53-24-5, Start Ship:
8 Rev 5 cooling IEEE Std 344-75a/**
3.2.5, 5.5 12/30/78, 12/30/78, 5/1/78A (5/20/77) water (IEEE Std 344-75);
Level 1 Level 1 Rerev:
pumps Appendix A, Complete (Bingham-Articles 2.0, 5.0 Willamette)
(G-7, Rev 5)
G-321-D 7.0 PAR Environmental-Paragraphs 2.2, 5.4.1; Not required l8 Net required l8 IEEE Std 323-74*/**
Subparagraphs 5.1.2; Appendix A, 3.0 M-5414-54, Reactor Seismic-Subparagraph 4.5.1, M-54-25-3, M-54-25-3, Start Ship:
a Rev 5 building IEEE Std 344-71*
4.5.2 (E-10),
1/16/75, t 1/16/75, 1/20/78A
( 2/.' r74 $
spray Section 10.3 (G-9)
Level 1 8 Le/el 1 Rerev:
pumps G-321-D 7.0-PAR Complete.
(B&W M-54-54-1, M-54-54-1, NCR 1770 Canada) 1/16/75, 1/16/75, Level 1 Level 1 M-54-55, M-54-55, 1/16/75, 1/16/75, Level 1 Level 1 Environmental-Subparagraphs Not required Not required IEEE 323-71*
2.1.2, 2.2 (see FSAR Table 3.11-4, Test 16)
M-5 5/M-5 5, Fuel pool Seismic-Subparagraphs 2.2 M-55-27-2, M-55-27-2, Start Ship:
Rev 4 cooling IEEE Std 344-71*
Item 7; 2.3.3; 6/22/76, 6/22/76, 4/15/77A W(10/18/74) heat 4.3.9; 7.4b acceptable acceptable Rerev:
exchanger (IEEE Std 344);
Complete IN2 (Yuba)
Appendix 1, M-55-27-3, M-55-27-3, ps)
Article 2.0 7/25/77, 7/25/77, (G-7, Rev 4) acceptable acceptable G-321-D 7.0 PAR C^I Environmental-Subparagraphs 3.1.2, Not required Not required
~*
none*
3.2.2, 3.2.3.1, (see FSAR Appendix 1, Table 3.11-4, Article 3.0 Test 16)
M-56/M-56, Fuel pool Seismic-Subparagraphs 4.2.2, M-56-70-1, M-56-70-1, Start Ship:[8 Re-3 cooling and IEEE Std 344-71*
4.5.2, 10.3; Appendix 1, 10/27/77, 10/27/77, 2/11/79A l
4/75) chilled water 2.3, 5.0 unacceptable unacceptable Rerev:
pumps (G-7, Rev 4)
Complete.
(Gould)
G-321-D 7.0 PAR (seismic) 23 QTSR-Rev 8-6/8/79 STATUS DOCUMENT CNLY
9 Issued IEEE MR/
Qualification Qualification Qualification Standards
- and (Original Item and FSAR Qualification Specification Test Test Specification P.O. Date)
Manufacturer Commi tments *
- Qualification Reference Procedure Results Status M-56-71-1, M-56-71-1, Not required.
10/27/77, 10/27/77, (environmental) unacceptable unacceptable NCR 1771 M-56-72-1, M-56-72-1, 1/12/78, 1/12/78, acceptable acceptable M-56-73-1, M-56-73-1, 2/22/78, 2/22/78, Level 1 Level 1 M-56-69-3, M-56-69-3, Environmental-Appendix 1, IEEE Std 323-74*/**
Article 3.0 3/20/79, 8
3/20/79, 8
Level 1 Level 1 M-61/M-61, Makeup Seismic-none*
Paragraph 6.5 M-61-17-1, M-61-17-1, Start Ship:
Rev 2 filters (G-7, Rev 4) 6/15/77, 6/15/77, 5/8/78A, G-321-D 7.0 PAR Level 1 Level 1 Rerev:
(11/13/75)
(Pall Complete.
Trinity)
NCR 1772 Environmental-Paragraphs 5.3 and 6.1 Not required Not Iequired none*
(Table 1 and Appendix (see FSAR Table 3.11-4, A)
Test 16)
M-64/M-64, Nuclear tanks Seismic-none*
Subparagraphs 7.2.1.i M-64-32-4, M-64-32-4, Start Ship:
Rev 6 (Richmond)
(G-29, Rev 2; 9/13/76, 9/13/76, 7/8/76A, G-7, Rev 4) acceptable acceptable Rerev:
(3/29/74)
Inprocess.
NCR 1773 M-64-33-4, M-64-33-4, 4/15/76, 4/15/76, acceptable acceptable M-64-34-5, M-64-34-5, 6/22/78, 6/22/78, acceptable acceptable (f4 N
M-64-35-4, M-64-35-4, py 4/15/76, 4/15/76, acceptable acceptable M-64-42-2, M-64-42-2,
_4 LI 11/25/74, 11/25/74, p3 acceptable acceptable QTSR-Rev 8-6/8/79 24 STATUS DOCL7EN'" (NLY
O Issued IEEE KR/
Qualification Qualification Qualification Standards
- and Specification (Original Item and FSAR Qualification Specification Test Test P.O. Date)
Maru f acture r Commitments **
Qualification Reference Procedure Results Status M-64-64-4, M-64-64-4, 5/3/79, 8
5/3/79, 8
acceptable acceptable I
d-64-65-4, M-64-65-4, 5/3/79, 8
5/3/79, 8
acceptable acceptable Environmental-Paragraph 3.1 Not required Not required none*
(temperaturej (see FSAR Table 3.11-4, Test 16)
M-75/M-75, Service Seismic-Paragraphs 4.1, 8.1 M.75-21-6, M-75-21-6, Start Ship:
Rev 5 water IEEE Std 344-75*/**
(IEEE Std);
l/28/78, 1/28/78, 12/30/77A Subparagraphs 7.1.8-11.
Level 1 Level 1 Rerev:
9.3.2 (0-30, Rev 1),
( pumps )
(pumps )
Complete.
(12/30/70) pumps NCR 1774 (Gould)
Article 13.0; M-75-38-3, M-75-38-3, Appendix 1, Article 2.0; 8/22/78, 1/22/78, Appendix 2, Paragraph 2.4 Level 1 Level 1 (G-30, Rev 1); Article (motors)
(motors) 1.0 (IEEE Std 344-75)
Envi ronmental-Paragraphs 4.1, 8.1 M75-28-1, M-75-63-1, Request to IEEE Std 523-74*/**
(IEEE Std);
11/28/77, 8
4/24/79, 8
vendor 4/23/79 Appendix 1, Level 1 Level 3 requesting more 8
data on motor Article 3.0;
- testing, Appendix 2, Paragraph 3.0 G-321-D 7.0 PAR M-90/M-90, Incore Seismic-none*
Faragraphs 5.12, 10.2.4, M-90-34-3, M-90-34-3, Shipped Article 7.0 6/27/78, 6/27/78, 4/1/78A (5/17/77) tank (G-6, Rev 4);
Level 1 Level 1 Rerev:
Rev 2 instrument Cc.mplete Appendix 1, (CBI)
Paragraphs 2.0, 9.3 (G-6, Rev 4)
G -321-D 7. 0 PAR (la Environmental-Paragraphs 4.1; Not required Nct required none" Appendix 1, (see FSAR pgj Article 3.0 Table 3.11-4,
\\d (G-26, Rev 1)
Test 16) m sa QTSR-Rev 8-6/8/79 25 STAG S_qqcmENT cpty
S O
Issued IEEE KR/
Qualification Specification Standards
- and Qualification Qualification (Original Item and FSAR Qualification Specification Test Test P.O. Date)
Manufacturer Commi tmen ts *
- Qualification Reference Procedure Results Status M-92/M-92, Reactor Seismic-Paragraph 3.2 M-92-34-3, M-92-34-3, Start Ship:
Rev 4 building none*
(G-6);
3/7/78, 3/7/78, 3/14/75A (1/26/70) cranes E-10, Rev 5, In review In review Rerev:
(Harni-Paragraphs 2.10, 3.0 Inprocess.
schfeger)
(G-7, Rev 4)
NCR 1775 Environmental-Paragraph 2.9; Not required Not required none*
E-10, Rev 5, (See F3AR Paragraph 3.1 Table 3.11-4 Te s t 16 )
M-93/M-93, Auxiliary Seismic-Paragraphs 3 2, 3.12 M-93-1-3, M-93-1-3, Start Ship:
Rev 3 building IEEE Std 344-75*
9.3, 10.2, (G-7, Rev 4) 8/18/76, 8/18/76, 9/17/76A (10/23/75) crane 4.22 (E-10) acceptable acceptable Rerev:
(Ederer)
G-321-D 7.0-E?.R Complete.
NCR 1776:
Dispositioned 8 4/20/79.
Environmental-Paragraph 4.22 (E-10)
Not required Not required none*
(see FSAR Table 3.11-4, Test 27)
M-ll7/M-ll7, Nuclear Seismic-M-221, Paragraph 3.1, M-117-40-3, M-117-40-3, Start Ship:
Rev 10 se rvice IEEE Std 344-71*
Appendix 1, 8/5/76, 8/5/76, 5/15/78A (3/13/74) valve Paragraph Al.12 acceptable acceptable Rerev:
(Anchor /
(RG 1.48);
G-9, Para-M-117-41-3, M-117-41-3, Inprocess.
Darling) graphs 4.2, 7.1 8/5/76, 8/5/76, NCR 1777 (IEEE Std 344-71) acceptable acceptable Environmental-M-221, Paragraph 3.1, M-117-54-2 Action by Letter to Anchor /
g IEEE Std 323-74*
7.1:
G-9, Paragraph 4.2 Limitorque Test 6/15,79 Darling 11/3/78 IEEE Std 382-72*/**
(IEEE Std 382-72);
Report (solenoid valves 600456 applicable, inside Anchor / Darling 8
containment) letter, 7/18/78, IEEE Std 382-72, For information Draft 13**
only.
(motor operated
(/4 valves inside containment) psj N
VJ
-s 26 QTSR-Rev 8-6/8/79 STATUS DOCUMENT CNLY
Issued IEEE MR/
Qualificaticn Specification Standards
- and Qualification Qualification (Original Item and FSAR Qualification Specification Test Test P.O. Date)
Manufacturer Comm i tments *
- 2uali fication Reference Procedure Results Status M-ll8A/M-ll8A, Nuclear Seismic-M-221, Paragraph 3.1, M-118A-55-2, M-118A Start Ship:
Rev 4 se rvice IEEE Std 344-71*
Appendix A1, 3/17/78, 3/17/78, 4/24/78A (5/9/74) gate and Paragraphs A1.11, acceptable acceptable Rerev:
globe valves A1.20, A1.23 Complete.
(E.B.V.
(IEEE Std 344-71);
NCR 1778 Systems)
Appendices B, C,
D G-321-D 7.0 PAR Environmental-M221, Paragraph 3.1, IEEE Std 323-74*
Appendix 1, 8
Paragraphs A1.4, A1.19.20 M-118B/M-ll8B, Nuclear Seismic-M-221, Paragraph 3.1, M-118B-48-1, M-118B-48-1, Start Ship: lg Rev 4 service IEEE Std 344-71*
Appendix Al, 6/6/77, 6/6/77, 1/79A l
(5/9/74) gate and Paragraphs A1.ll, A1.31; acceptable acceptable Rerev:
globe valves (G-32), Paragraphs 2.A, Inprocess.
(Rockwell B,
8.C.6 NCR 1779 International)
(IEEE Std 344-75);
Paragraph 5.5 G-321-D-7.0-PAR Environmental-M-221-Sect 3.1, M-ll8B-81-2, M-118B-81-2, IEEE Std 323-74*
Paragraphs A1.4, A1.31 4/3/79, 8
4/3/79, 8
IEEE Std 382-72*/**
A1.34; Appendix A14, Level 1 Level 1 (solenoid valves Article 5.0; inside containment)
G-32, Paragraph 2.A, B,
8.C.4-5; (IEEE Std 323-72, IEEE Std 382-72)
M-120/M-120, Nuclear Seismic-M-221, Article 3.1, M-120-77-2, M-120-77-2, Start Ship:
Rev 3 valves, 2 1/2" IEEE Std 344-71*
Paragraph 3.1, Appendix 1 8/5/76.
8/5/76, 9/lb/78A (7/6/74) and larger Paragraph A1.4; G-9, acceptable acceptable Rerev:
(Anchor /
Paragraphs 4.2, 7.1, Comp.ete.
Darling)
NCR l'R0 G-321-D-7.0-PAR M-120-95-1 M-120-95-1 through through (jg 97-1, 97-1, 8/5/76, 8/5/76, I\\d acceptable acceptable fN M-120-105-1, M-120-lG5-1, and -106-1, and -106-1, (s;
12/9/77, 12/9/77, acceptable acceptable te,
27 QTSR-Rev 8-6/8/79 STATUS DC; GENT ONLY
Issued IEEE MR/
Qualification Specification Standards
- and Qualification Qualification (Original Item and FSAR Qualification Specification Test Test P.O. Date)
Manu factu re r Commi tments *
- Qualification Reference Procedure Results Status M-120-107-2, M-120-107-2, 6/16/78, 6/16/78, Level 1 Level 1 Environmental-M-221, Paragraph 3.1 M-120-86-2, Action by 8
IEEE Std 323-74*
Appendix 1, Para-Limitorque 6/15/79 IEEE Std 382-72*
graph Al.1; G-9, Test Report IEEE Std 382-72, Section 4.2, 7.1, 600456 ap-8 Draft 13**
(IEEE 382-72,
- plicable, (motor operated valves 323-71)
Anchor / Darling inside containment) letter 7/18/78.
For information only.
M-123A/123A, Nuclear Seismic-M-221, Article 3.1 M-123A-93-2, Start Ship:
Rev 2
- valves, IEEE Std 344-71*
Appendix 1, Para-1/25/77, 4/30/76A (5/24/74) 2 1/2" and graphs A1.14, G-9, Para-acceptable Rerev:
In-l8 larger graphs 4.2, 7.1 process.
1 (Westing-(IEEE Std 344) house)
Appendix 7, 4.2 G-321-D 7.0 PAR Environmental-M-221, Article 3.1 M-123A-96-2, Action by l IEEE Std 323-74*
Appendix 1, Para-Limitorque 6/15/79 lg IEEE Std 382-72*
graphs A1.1, G-9, Test Report IEEE Std 382-72, Paragraphs 4.2, 7.1 600456 B
Draft 13**
(IEEE Std 323 and applic able,
(motor operated 382)
Westinghouse valves inside G-321-D 26.0 PAR letter 1/16/78 containment)
Level 1 M-12 3 B/ M-12 3 B, Nuclear Seismic-M-221, Paragraph 3.1, M-123B-48-1, M-123B-48-1, Start Ship:
Rev 2
- valves, IEEE Std 344-75*/**
Table 1, 3; Appendix 1, 5/19/77, 5/19/77, 4/30/77A (10/25/75) 2 1/2" A1.4 (RG 1.48);
Level 1 Level 1 Rerev:
and larger G-9, Paragraphs 4.2, Complete.
(Target 7.1 (IEEE Std 344)
NCR 1781 Rock)
G-321-D-7.0-PAR Environmental-M-221, Article 3.1 M-123B-54-2 Action by i
IEEE Std 323-74*/**
Appendix 1, Lim 1 torque 6/15/79 l0 IEEE Std 382-72*
Paragraphs 1.1; Test Report k/4 IEEE Std 382-72, G-9, Paragraphs 4.2, 600456 ap-8 PN)
Draft 13**
7.1
- plicable, psj (motor operated valves (IEEE Std 323 and 382)
Target Rock inside containment) letter S/23/ 78, CN5491 Level 1 ul C's G-321-D 7.0 PAR 28 QTSR-Rev 8-6 /8/79 STATUS DOCUMENT CNLY
e>
Issued IEEE MR/
Qualification Specification Standalds* and Qualification Qualification (Original Item and FSAR Qualification Specification Test Test P.O.
Date)
Manufacturer Commitments **
Qualification Reference Procedure Results Status M-123C/M-123C, Nuclear Seismic-M-221, Paragraph 3.1; M-123C-44-1, M-123C-44-1, Start Ship:
Rev 2
- valves, IEEE Std 344-71*
Table 1, 3;
8/5/76, 8/5/76, 4/12/78A (10/25/74) 2 1/2' and Appendix 1, A1.4 acceptable acceptable Rerev:
larger (RG 1.48) G-9, Paragraphs Inprocess.
(Anchor /
4.2, 7.1 (IEEE Std 344)
NCR 1782 Darling)
G-321-D 7.0-PAR Environmental-M-221, Paragraph 3.1; M-123C-37-2, Action by g
IEEE Std 323-74*
Appendix 1, A1.1; 12/19/78, 6/15/79 IEEE Std 382-72*
G-9, Paragraphs 4.2, 7.1 Limitorqe2 (IEEE Std 323 and 382)
Test Report 600456 ap-8
- plicable, Anchor / Darling letter 7/18/78.
For information only M-125A/M-125A, Nuclear Seismic-M-221, Paragraph, 3.1, M-125A-88-2, M-125A-88-2, Start Ship:
Rev 3
- valves, IEEE Std 344-71*
Appendix 1, A1.4, 12/13/76, 12/13/76, 9/28/76A (6/14/74) globe and (RG 1.48);
G-9, Paragraph acceptable acceptable Rerev:
check 4.2, (IEEE Std 344)
Complete.
(Westing-G-321-D 7.0-PAR NCR 1783 house)
Request to vendor 11/11/77 Environmental-M-221, Article 3.1, M-125A-92-1 Action by 8
IEEE Std 323-74*
Appendix 1, Paragraph Limitorque 6/15/79 IEEE Std 382-72*
A1.1; G-9, Paragraphs Report IEEE Std 382-72, 4.2, 7.1 (IEEE Std 323 600456 8
Draft 13**
and 38z) applicable, (niator operated valves Westinghouse inside containment) letter 1/16/78, Level 1 M-125B/M-125, Nuclear Seismic-M-221, Paragraph 3.1; M-125B-26-1 M-125B-26-1 start Ship:
Rev 3 check IEEE Sta 344-71*
Table 1, through 32-1, through 32-1, 1/5/77A (6/21/74) valves Appendix 1, A1.4; G-9, 10/16/75, 10/16/75, Rerev:
(Target Rev 1, 4.0 (IEEE Std 344) Level 1 Level 1 Complete.
Rock)
G-321-D 7.0-PAR NCR 1784:
Dispositioned 8
4/20/79.
l/d Environmental-none*
Not required Not required N
N va
'd 29 QTSR-Rev 8-6/8/79 STATUS DOC'MN' CNtY
8>
9 Issued IEEE MR/
Qualification Specification Standards
- and Qualification Qualification (Original Item and FSAR Qualification Specification Test Test P.O. Date)
Menufacturer Commitments **
Qualification Reference Procedure Results Status M-125C/M-125, Nuclear Seismic-M-221, Paragraph 3.1, M-125C-54-3, M-125-C-54-3, Sturt Ship:
Rev 3 service valves IEEE Std 344-71*
Table 1, 3;
11/9/79, 8
11/9/79, 8 4/12/78A (6/21/74) 2-1/2" and G-9, Paragraphs 4.2, Level 1 Level 1 Rerev:
larger 7.1 (IEEE Std 3 Complete.
(Anchor G-321-D 7.0-PAR NCR 1785 Darling)
M-125C-59-1 M-125C-59-1 through 1, through 1, 6/5/76, 8/5/76, acceptable teceptable M-125C-92-1, M-125C-92-1, 2/1/78, 2/1/78, Level 1 Level 1 Environmental-M-221, Paragraph 3.1, M-125C-lll Action by g
IEEE Std 323-74*
Appendix 1, S ubparagraph Limitorque 6/15/79 IEEE Std 382-72*
A1.1; G-9, Paragraphs 4.2, Test Report IEEE Std 382-72, 7.1 (IEEE Std 323 600456 8
Draft 13**
and 382)
Anchor / Darling (motor operated valves letter 7/18/78, inside containment)
Level 1 M-127A/M-127, Nuclear Seismic-M-225, Paragrapn 3.2, M-127A-20-1, M-127A-20-1, Start Ship:
Pev 4 manual and IEEE Std 344-71*
16.4, Appendix Al, Para-9/20/76, 9/20/76, 3/31/78A (9/16/74) air-operated graph A1.3; G-9, Para-acceitable acceptable Rerev:
valves 2" graphs 4.2, 7.1, (IEEE),
Complete.
and under G-10, 11.3 NCR 1786 (Kerotest) operated valves G-321-D 7.0 PAP on surplus.
Environmental-Not required Not required none*
(manual valves)
(manual valves)
M-127B/M-127, Nuclear Seismic-M-225, Paragraphs Start Ship:
Rev 3 manual oper-IEEE Std 344-71*
3.2, 16.4.4c; Appendix 9/18/78A
( 9,'16/74 )
Ated valves Al, Paragraph A1.3 Rerev:
2" and G-321-D 7.0-PAR Complete.
under (Henry NCR 1787 Vogt)
Request to vendor 4/11/77 8
Vendor response
(>4 4/18/77 N
Environmental-M-225 Paragraph 3.2; Not required Not required ps) none*
Appendix A1, Paragraph A1.1, Al.9; G-26 m
( ~1 CO 30 QTSR-Rev 8-6/8/79 STAT'JS_DCCLTET ON:'
8>
a Issued IDEE MR/
Qualification Specification Standards
- and Qualification Qualification (Original Item and FSAR Qualification Specification Test Test P.O. DateJ_
Manu f acture r Commi tments *
- Qualification Reference Procedure Results Status M-127C/M-127, Nuclear Seismic-M-225, Paragraphs M-127C-ll-1 Start Ship:
Rev 3 manual oper-ISLE Std 344-71*
3.2, 16.4.4c; Appendix 11/6/75, 10/13/78A (9/17/74) ated valves Al Paragraph A1.3 Level 5 Rerev:
2" and G-321-D 7.0-PAR Complete.
under Nk0 1788 (Yarway)
Request to vendor 4/5/77 8
Vendor response 4/22/77 Enviror mental-M-225, Paragraph 3.1, none*
Appendix A1, Paragraph A1.1, Appendix A1, Paragraph A1.9; G-26 M-129A/M-129, Nuclear Seismic-M-225, Article 3.2, M-129A-63-1, M-129A-63-1, Start Ship:
Rev 2 valves, sst, Std 344-71*
Appendix A1, Paragraph 9/20/76, 9/20/76, 2/15/78A (9/16/74) 2" and under A1.3; G-9, Paragraphs acceptable acceptable Rerev:
In-8 (Kerotest) 4.2, 7.1 (IEEE),
process.
G-10 Article 11.3 G-321-D 7.0-PAR Environmental-Appendix A1, A1.1; G-9, Action by Action by 0
IEEE Std 3^3-74*
Paragraphs 4.2, 7.1 6/15/79 6/15/79 8
IEEE Std 382-72*
G-26; G-10, Paragraph 11.3 G-321-D 26.0 PAR M-1293/M-129, Nuclear seismic-M-225, Paragraphs 3.2, M-129B-31-1, M-1293-31-1, Start Ship:
Rev 1 valves, sst, IEEE Std 344-71*
3.2.3; G-9, Paragraphs 6/25/76, 6/25/76, 2/15/78A (9/16/74) 2" and under 4.2, 7.1 (IEEE Std 344); acceptable acceptable Rerev:
(Weston G-10, Paragraph 11.3 Ir.p roce s s.
Hydromatics)
G-321-D 7.3-PAR M-129B-32-5, M-1293-32-5, All valves 3/20/79, 8
3/20/79, 8 currently Level 1 Level 1 s u rplus.
M-129B-33-2, M-1293-33-2, 11/18/76, 11/18/76, accep tab le acceptable l>d Environmental-M-225, Paragraph 3.2, Limitorque Letter to Ps)
IEEE Std 323-74*
Appendix A1, Paragraph Report 600456 g vendor 7/17/78.
pgj IEEE Std 382-72*
A1.1; G-9, Paragraphs (33?) and TkX to vendor 8
IEEE Std 382-72, 4.2, 7.1 (IEEE Std 382); 603461 (382) 1/17/79.
Draft 13**
G-26; G-10, Paragraph 11.3 Reply from
-~^
(motor operated valves G-321-D 26.0 PAR vendor 3/1/79.
(~'I inside containment) s _3 31 QTSR-Rev B-6/8/79 STATUT DOCTEC CNL :
An Issued IEEE MR/
Qualification Specificatior.
Standards
- and Qualification Qualification (Original Item and FSAR Qualification Specification Test Test P.O. Date)
Manufacturer Cemm i tmen t ; *
- Qualification Reference Procedure Results Status A tion by l8 Start Ship:
M-131/M-131, Diaphram Seismic-Paragraph 3.B.1.C, 4.A.1, Action by l8 Rev 2 valves IEEE Std 344-75*/**
5.B; Attachment E, 6/30/79 I
6/30/79 I
Dn strike g
(7/7/78)
(ITT Crinnell)
Article 1.0; Table C-1 since 4/28/79.
G-321-D 7.0-PAR One valve shipped.
Rerev: Not required Environmental-Paragrapns 4.A.1, 4.A.4, Action by Action by g g
IEEE Std 323-74*/**
Appendix A; Article 3.0 6/30/79 6/30/79 Attachment E, Table C-1 M-132/M-132, Butterfly Seismic-228, Paragraph 3.1, M-132-67-3, M L32-67-3, Start Ship:
Rev 3 valves IEEE Std 344-71*
Appendix 1, through 3, through 3, 11/22/76A (11/27/74)
(H. Pratt)
Section A1.3, 9/7/76, 9/7/76, Rerev:
(RG 1.48) acceptable acceptable Complete.
G-321-D 7.0-PAR NCR 1789 M-132-83-1 M-132-83-1 and 1, and 1, 9/24/76, 9/24/76, acceptable acceptable M-132-87-1 M-132-87-1 through 1, through 1, 10/12/76, 10/12/76, acceptable acceptable M-132-99-2 M-132-99-2 through -103-2, through -103-2, 5/12/77, 5/12/77, acceptable acceptable M-132-105-2, M-132-105-1, 3/3/78, 3/3/78, Level 1 Level 1 M-132-106-1, M-132-106-1, 3/3/78, 3 / 3,*7 8.
Level 1 Level 1 l#d Environmental-M-228, Paragraph 3.1; M-132-108-1, M-132-108-1, IN)
IEEE Std 323-74*/**
Appendix 1, Paragraph 3/20/79 8
3/20/79 8
Ps)
IEEE Std 382-72*
Al.1 Level 1 Level 1 IEEE Std 382-72, Draft 13**
(motor operated valves Inside containment)
C13 32 QTSR-Rev 8-6/8/79 S_TATUS.DCFISIN7 CNLY
Issued IEEE MR/
Qualification Specification ctandards* and Qualification Qualification (Original Item and FSAR Qualification Specification Test Test P.O. Date)
Manufacturer Comm i tme n ts *
- Qualification Reference Procedure Results Status M-13 4 /E-13 4, Steel plug Seismic-Section 3.B.l.C, M-134-36-1 M-134-36-1 Start Ship: l8 Rev 3 valves IEEE Std 344-75*/**
4.A.1, through 1, through 1, 3/23/79A I
(1/7/77)
(Tufline) 5.B; G-9, Paragraph 6/9/78, 6/9/78, Rerev:
4.2 (IEEE Level i Level 1 Inprocess.
Std 344-71)
NCR 1790 G-321-D 7.0 PAR M-134-46-2, M-134-46-2, 7/10/78, 7/10/78, Level 1 Level 1 Environmental-Appendix C, Article 3.0; M-134-85-1, M-134-85-1, IEEE Std 323-74*/**
G-9, Paragraphs 4.2, 11/15/78, 8
11/15/78, 8
IEEE Std 382-72*
(IEEE Std 382) 7.1 Level 1 Level 1 M-14 0 /M-14 0, Nuclear Seismic-none*
Page 5, Item 18; Attach-M-140-70-1, M-140-70-1, Start Ship:
'l8 Rev 2 se rvice IEEE Std 344-75*/**
ment 1.0, Paragraph 3.6; 4/26/78, 4/26/78, 6/30/79F (5/6/77) pressure (1 and 2 PSV-1016 Appendix D, Paragraphs Level 1 Level 1 Rerev:
relief valves only) 2.4, 2.5 Complete (Crosby)
G-321-D 7.0-PAR M-140-76-3, M-140-76-3, M-140-80-3, M-140-80-3, M-140-81-3, M-140-81-3, M-140-82-3, M-140-82-3, M-140-83-3, M-140-83-3, M-140-84-3, M-140-84-3, 1/19/79, 1/19/79, Level 1 Level 1 M-140-77-3, M-140-77-3, 1/19/79, 1/19/79, Level 2 Level 2 8
M-140-78-4, M-140-78-4, 2/20/78, 2/20/78, Level 2 Level 2 M-140-79-4, M-140-79-4, L/J 3/29/79, 3/29/79, rs)
Level 1 Level 1 N
M-140-85-4, M-140-85-4, 4/30/79, 4/30/79, Level 1 Level 1
~~^
M-140-86-3, M-140-86-3, 1/19/79, 1/19/79, Level 3 Level 3 33 QTSR-Rev 8-6/8/79 STATUS DCCD'EN' CNLY
b Issued IEEE Qualification Qualification qualification MR/
Standards
- and Test Test Specification FSAR C,alification Specification Results Status (Original Item and Procedure.
P.O. Date)
Manufacturer Commitments **
Qualification Reference Environmental-Section 3.2, Appendix D, Expected by l8 Expected by l0 Paragraphs 2,1, 3.0, 7/79 l
7/79 l
none*
Appendix F M-146-16-2, M-;46-16-2, Start Ship:
Section 3.5 8 10/29/76A M-146/M-146, Auxiliary Seismic-1/23/76, 3
1/23/76, Rev 2 building IEEE Std 344-71*
10.3.1.i, Level 1 Rerev:
5.16 (G-7); E-10, Level 1 i
Inprocess.
(6/19/75) s a fe guard Paragraph 2.10 (C-7 NCR 1791 chiller Rev 4); Section 3.1 Requests to (Carrier)
(IEEE Std) vendor G-321-D 7.0-PAR 1/25/77 and 4/26/77 Not required Not required Environmental-Section 3.5; (see FSAR Taale IEEE Std 323-74*/**
M-146-Sk-1, Section 1.11; E-10 3.11-1, Test 16)
Section 3.1 (IEEE Std)
Paragraph 6.17 (G-7);
M-149-63-4, M-149-63-4, Start Ship:
IEEE Std 344-75*/**
Section 7.1 (IEEE 4/1/77, 4/1/77, 7/1/77A M-149/M-149, Air handling Seismic-Std 344-71); Appendix N, acceptable acceptable Aerev:
Rev 5 unit Inprocess.
(1/22/76)
(Trane)
Articles 9.0, 13.0 (G-7, NCR 1792 E-10, Article 3.0 M-149-66-1, M-149-66-1, Requests to Rev 4) 1, and 1, 1, and vendor G-321-D 7.0-FAR 1.10/4/76, 1/25/77 and 10/4/76, acceptable acceptable 4/5/77 Environmental-Appendix N, Articles 2.0, Not required Not required
!EEE Std 323 74*/**
9.0; E-10, Article 3.0 (see FSAR Table 3.11-4, Test 16)
(IEEE Std)
G-321-D 26.1 PAR G-321-D 26.2 PAR Paragraph 6.10 (G-7)
M-150-51-4, M-150-51-4, Start Ship:
Rev 7 Ing unit IEEE Std 344-75*/**
Appendix A, Items 1, 11/23/76, 11/23/76, 2/15/78A M-150sM-150, Air filter-Seismic-2, and 3, Fage 1 acceptable acceptable Rerev:
Ccmplete.
(4/30/76)
(MSA)
G-321-D 7.0-PAR NCR 1793 Requests to vendor
(,a 1/25/77 and I\\3 4/6/77; teleccpy 8/17/77 PN) s' J QTSR-Rev 8-6/8/79 34 5 TARTS MCt?E'c m tY
Jb 9
Issued IEEE Qualification Qualification Qualification PR/
Standards
- and Test Test Specification FSAR Qualification Specification Results Status (Original Item and P.O. Date)
Manufacturet Commitments **
Qualification Reference Procedure _
M-150-64-4, M-150-64-4, Procedures 12/19/78, 12/19/78, expected by Level 1 Level 1 4/20/79.
Test results will take 8 months according to Wyle lab schedule.
M-150-142-2, M-150-142-2, Environmental-Appendix A 11/28/78, 8
11/28/78, 8
IEEE Std 323-74*/**
Level 1 Level 1 IEEE Std 334-74*
IEFE Std 334-71**
O-321-D 26.1 PAR G-321-D 26.2 FAR Start Ship:
laragraphs 10/26/77A M-151A/M-151, HVAC Selsmic-Rev 4 subcontract ncne*
11.2.2, 1.2.3, 1.33, Rerev: Not 6.2, 6.4: C-305.
required.
(10/5/ '7 )
(2ack)
Table 2.1; Telex to Appendix G vendor 11/6f 78 G-321-D 7.0 FAR requesting selSm1C qualification.
Telecon 4/2/79 to expedite s ubmi tt al.
Environmental-none*
M-154/M-154, HVAC Seismic-Section 3.1, 5.3.lf M-154-38-4, M-lLi-38-4, Start Ship:
g Rev 1 isolation IEEE Std 344-75*/**
(IEEE Std 344); Paragraph 3/20/79, 3/20/79, 5/15/79F 5.1.1, 6.0, 10.3.3; Level 1 Level 1 (delayed).
Rerev (9/26/77) valves G-9, Sections 4.2, 7.1 (Pacific Complete (IEEE Std)
G-321-D 7.0 PAR M-154-39-3, M-154-39-3, Alr) 1/24/79, 1/24/79; 3
8 Level 1 Level 1 M-154-40-3, M-154-40-3, l/d 3/22/
9, 3/22/79, 7
PN)
Level 1 Level 1 FN)
M-154-41, M-154-41, 1/22/79.
1/22/79, Level 1 Level 1
(-J QTSR-Rev 8-6/8/ 79 35 STAn.'s M C'O'9,7
s Issued IEEE MR/
Qualification Qualification Qualification Standards
- and specification (Original Item and FSAR Qualification Specification Test Test P.O. Date)
Manufacturer Commitments **
Qualification Reference Procedure Results Status M-154-43-3 M-154-43-3 4/9/79, 4/9/79, Level 1 Level 1 8
8 Environmental-Section 3.1, 5.3.1, M-154-40-3, M-154-40-3, IEEE Std 2323-74*/**
7.3.4C (IEEE 3/22/79, 3/22/79, IEEE Std 382-72*
Std 323-
)
Level 1 Level 1 G-9, Paragraphs 4.2, 7.1 (IEEE Std)
M-157/M-157, Vane axial Seismic-Paragraphs 3.6, 5.5.10, M-157-33-1 M-157-33-1 Start Ship:
Rev 4 fans IEEE Std 344-75*/**
5.9 (G-7, G-29):
through 1, through 1, 9/6/77A Subparagraph 9.2.7d; 6/15/77, 6/15/77, Ferev:
G-7, Rev 4; G-29, 1.1.1 acceptable acceptable Complete (9/20/76)
(Joy)
(IEEE Std 344-75)
G-321-D i.0-PAR M-157-39-1, M-157-39-1, 6/28/78, 6/28/78, acceptable acceptable Environmental-Section 3.6, 5.5.10, M-157-24-1 M-157-24-1 IEEE Std 323-74*/**
(IEEE 323-74, 334) through 1, through 1, IEEE Std 334-74*
G-321-D 26.1 PAR 5/9/77 5/9/77, IEEE Std 334-71*
G-321-D 26.2 PAR Level 1 level 1 Sections 6.4.1, 8.3.2d, M-163-40-2, M-163-40-2, Start Ship:
M-163/M-163, Recirculating Selsmic-Rev 2 air cooling IEEE Std 344-75*/**
4.1.j (IEEE Std) 10/25/77, 10/25/77, 3/9/78A Section 6.8 acceptable acceptable Rerev:
(11/15/75) units CVI Inprocess.
(Penwalt)
(G-6, Rev 4 )
NCR 1794 Environmental-Section 4.1.j (IEEE M-163-22-2, M-163-22-2, IEEE Std 323-74*/**
S td ) ; Section 6/9/77, 6/9/77, IEEE Std 334-74*
6.3.4, 8.3 Level 1 Level 1 IEEE Std 334-71**
Section 4.1.j, 7.2.2, M-163-48-3, M-163-48-3, (IEEE Std 334-71);
4/7/78, 4/7/78, G-26; E-10, Paragraphs Level 1 Level 1 2.9, 2.10 M-168/M-168, Reactor Seismic-Paragraph 5.3, M-168-48-1, M-168-48-1, Start Ship: 68 Rev 6 building IEEE Std 344-75a/**
Appendix A, Art icle 8.0, 3/24/78, 3/24/78, 10/16/78A l
(9/22/76) isolation Appendix C, T?pendix H; Level 1 Level 1 Rerev:
18" and 48" G-9, Paragraphs 4.2, 7.1 Complete.
,fa (IEEE Std 344-75)
M-168-48-1, M-168-48-1, NCR 1795 3 y valves 9/8/78, 9/8/78,
%)
(H. Pratt)
Level 1 Level 1 QTSR-Rev 8-6/8/79 36 S T A~"' S DCC'7Er CNLY
&n Issued IEEE MR/
Qualification Specification Standards
- and Qualification Qaalification (Original Item and FSAR Qualification Specification Test Test P.O. Date)
Manu f actu re r Commitments **
Qualification Reference Procedure Results Status M-168-49-1, M-168-49-1, 9/8/74, 9/8/78, Level 1 Level 1 Environmental-Article 5.1 (G-26):
M-168-46-1, M-168-46-1, IEEE Std 323-74*/**
G-9, Section 9/7/78, 9/7/78, IEEE Std 38?-72*
4.2, 7..
(IEEE Std 382); Level 1 Level 1 IEEE Std 382-72, G-6 Draft 13**
G-321-D 7.0 PAR (motor operated valves G-321-D 26.0 PAR inside containment)
M-168-47-1, M-168-47-1, 9/7/78, 9/7/78, Level 1 Level 1 M-169/M-169, Electric Seismic-Paragraphs 6.8, 9.L.7c, M-169-39-1 M-169-39-1 Start Ship:
Rev 2 hydrogen IEEE Std 344-75*/**
Section 4.2 (IEEE Std through 1, through 1, 1/78A 8
(7/8/77) recombiners 344-75);
G-7, Rev 4; 1/23/78, 1/23/78, herev:
In-(Westinghouse)
G-6, Rev 4 Level 1 Level 1 process.
G-321-D 7.0 PAR N2R 1796 Environmentcl-Section 4.2, (IEEE Std M-169-5-2 M-169-5-2 IEEE Std 323-74*/**
323-74) and 2, and 2, IEEE Std 334-74*
Section 6.2 (RG 1.17) 11/1/77, 11/1/77, G-26, Rev 1 Level 1 Level 1 M-169-7-2, M-169-7-2, 1/23/78, 1/23/78, Level 1 Level 1 M-169-8-1 M-169-8-1 For information g and 1, and 1, only 9/20/77, 9/20/77, Level 5 Level 5 M-169-10-1 M-169-10-1 For information l8 and 1, and 1, only I
9/26/77, 9/26/77, Level 5 Level 5 W
PN)
M-169-18-1, M-169-18-1, 11/10/77, 11/10/77, 8
ps)
Level 1 Level 1 01.
(9 37 QTSR-Rev 8-6/8/79 STA"'US DCC N ENT__CNL:.
am Issued IEEE MR/
Qualification Specification Standards
- and Qualification Qualification (Original Item and FSAR Qualification Specification Test Test P.O. Date)
Manu factu re r Comm i tment s *
- Qualification Reference Procedure Results Status M-180/M-180, Se rvice Seismic-Section 4.1.10 (IEEE M-180-16-5, M-180-16-5, Start Ship:
Rev 2 water self-IEEE Std 344-75*/**
Std 344); Paragraphs 5/10/78, 5/10/78, 6/30/79F 8
(S/12/77) cleaning 5.4, 6.5 (G-30);
Level 1 Level 1 Rerev:
In-strainers Section 6.8.2 (shafts);
process.
(S.P. Kinney)
Appendix A, Section A2.0 M-180-27-3, M-180-27-3, (G-30); A2.0; 5/18/78, 5/18/78, C-30, Rev 0 Level 1 Level 1 G-321-D 7.0 PAR M-180-34-3, M-180-34-3 4/5/79, 8
4/5/79, 8
In review.
in review.
Environmental-Section 4.1.10 (IEEE M-180-27-3, M-le0-27-3, lequest to IEEE Std 323-74*/**
Std 323-74); Appendix A, 5/18/78, 5/18/78, rendor Section A3.0, E-10, Level 1 Level 1
/7/78 8
Section 11.3a (IEEE
- ill some Std 323-74 and 4
items) 334-74)
G-321-D 26.1 PAR G-321-D 26.2 PAR M-333/M-333, Nuclear Seismic-Section 2.4, 2.5; M-333-17-2, M-233-17-2,j Start E t.xp :
Rev 3 se rvice IEEE Std 344-75*
Appendix K; Appendix D, 2/20/79, 8
2/20/79, 8 6/15/79F (11/26/77) pressure 2.4 Level 1 Level 1 Rerev:
relief valves G-321-D 7.0-PAR Complete (Crosby)
Environmental-Section 2.0, 3.0; M-333-11-1, M-333-11-1, none*
Appendix E; Appendix 5/1/78, 5/1/78, A,
2.0; Appendix D.
3.0 Level 1 Level 1 G-321-D 26.1 PAR MR-336/M-336, Nuclear wye seismic-Attachment F, Sheets M-33627-2, M-336-27-2, Start Ship:
Rev 1 strainers IEEE Std 344-75*
l-4; Attachment G 4/26/78, 4/26/78, 4/3/78A (8/8/77)
(Leslie Co.)
Level 1 Level 1 Rerev:
Complete M-336-27-2, M-336-27-2, 4/17/78, 4/17/78, Level 1 Level 1 Envi ro nmental-Appendix A, Section 3.3,
(/W none*
Attac hment N
N
_b C'
38 QTSR-Rev 8-6/8/79 STATUS DCCCVENT CNLY
s U
u N
t 9C a
e t
h n
7 S
t o
e
/T i
t 8 '.
n t
a
/E dd 6 p' a
D n
o ee c
ii o
i y
8C i
d ff f
t vG t
s e
i i i
i a
t u
4 cc l
v e
ctl s
a i
3 3
7 ee u
t 7
5 7
pp R[
S isu s
f es i
q c
7 5
ss RT iTe l
R d
e 6
3 0
1 SA a
n E
f 1
1 7
1 tt TT u
a E
f 1
oo QS E
E 3
7 6
4 1
NN Q
I d-ed ve h
os c
i ru h
n p
o pe w
4 51 1
5 1112 2
i e ar o
t 7
7 7777 7
7 77 t
r e
t n
3 atu sw e
4 4
3442 21 3
44 csd a
iee ws e
=
4 4
2348 8
2 44 fTc e
v
+
3 3
3333 3t 3
33 f
i 1
i o tt m
E E
E E
Ea E
EE l
r aa a
m E
E E
E Er E
EE a
P hd u
t l
o E
E E
E Ed E
EE Q
e e
C I
I I
I I
I II du r
e d
rs as Rt sv n sn e
di An ri a
ei de c
n Se ot va ed n
ag Fm tc n
lt ti e
tn p
oa o an as di um pi vo rn r
si ne w
nu d c
I ut c
ei t
t of no aq e r*
ra d p
n n l e t
i eysarsie od e e ie ol d
c cl reettod e m m tR il if e
eoovlli ni rl p
p a
to cn af Mo f
r o gl cines ol i i f
cea ful n ta u u io c
fi ie d
ee A t
tvc oi ottq q it fh e
hc nra irns msne e ca it u
te t
- e. i C d r i o d
ne ec l
s 41 i n r a neaiEe EI mE E
9 pi a,
s 26 4177534 np e n cah tll l
n1 I
3 I
77177 - - 777 i
m i ni pmp l
si Sf ue i
qs
- 97 - - -
r p
aomssersa seas s
tispotosttsvts s
l o e 14 - 8621105 ea i a
Ep t
2121 - - 311 dl u
ntimmssasnal na a u
Er a
2 - - - - -
au q
o a e u t ybl nel aol l
Q Eu D 1542911144 mc E
ClS pA s a Ci m C v c C C
i I p 4
tt ts nr 0
si ea 1
n eh mp o
tt t
1 3
ndi a
ia Eont*
l r m
1 n
mg Ei a a
- o 1
o Et cs eF on i
I a*it h
d ci csfn t
r y
3 tc didie a
yf d
ni e e efrl m
.d al e
l s
e n uiaat sldui dt a
a c b0b sanQm ru t
u n 0
8 2
3 9a0u I ua m ac S
2614141524
.q e
4 4
5 7
8T1S QtRo de 7777777777 t
r S/C nx E
nn e 1
1 1
1 1R1R S
ae E
7733444423 ei f
A A
F t
E 1122334488 m
e G
G G
G GSGS ss I
3333333333 td R
R R
R R
RFRF a
ie nw ms mu o
r ir c
e te ce dr ad b
nu cr n
at io od c
f il ma ie tu ef l s ao t u aa cw i
I n uh f) a qc i s M
r l(
Eu Ep ad 9
E ur n
I e qa h
d o
)
il e dt Rn tat e
Aa ana ue St
/ciD st Fs Rig sa J N N
._ N 1,
4 Mfi Id
/
i rO
(
t cO e(P p
S