Submits Written Record of 790509-18 Actions Re TMI Event: Observed Operations Such as Maintaining Pressurizer Level Stack Exhaust Monitoring & New Sys Status
ML19224D024
Person / Time
Site: Crane Constellation icon.png
Issue date: 06/01/1979
From: Dance H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
REF-SSINS-8150, TASK-TF, TASK-TMM NUDOCS 7907100535
Download: ML19224D024 (2)


Text

...

'" p c 9ta

'l v

'o, UNITED STATES

[ f g,., 'j NUCLEAR REGULATORY COMMISSION

.9

.. c REGION 11 3

[

101 MARIETT A ST., N.W., SUITE 3100 w/ g ATL ANTA, GECRGIA 30303 h-[ [

JUN 1

'979 SSINS 8150 ME".ORANDUM FOR:

Boyce H. Grier, Director, Offica of Inspection anr' Enforcement, Region I THRU:

James P. O'Reilly, Director, Office of Inspection and Enforcement, Region II FROM:

H. C Dance, Chief, Reactor Projects Section No.1, RONS Branch, Region II StddECT:

ACTIVITIES AT THREE MILE ISLAND The following summaries my activities at TMI:

1.

I arrived onsite at 1415 hours0.0164 days <br />0.393 hours <br />0.00234 weeks <br />5.384075e-4 months <br /> on 5/9/79 and departed at 0810 hours0.00938 days <br />0.225 hours <br />0.00134 weeks <br />3.08205e-4 months <br /> on 5/18/79.

During the period 5/10-5/18, I worked the 12-8 shift.

Hours spent cutside this shift included a one hour site HP/ Security orientation by TMI on 5/9, two hours of mask qualification on 5/10, and four hours of system hydro checks on 5/12.

2.

Activities included observation of oserations occurring on the 12-8 shi#t sten as maintaining pressurizer level, stack exhaust monitoring, and status of new systems being installed.

Participated in NRC witnessing of hydro leak checks on two occassions.

3.

Observations of licensee operations appeared to be ccmpleted in accordance with instructions provided.

Significant delays into the auxiliary building were noted due to limited availatdlity of dir hose and other respiratory equipment.

4.

Observations of NRC Operations a.

IE operators at the site were divided into three distinct work groups of environmental, radiation protection and operations.

Connunication between these groups and NRR activities could be improved especially for shift personnel.

Circulating the Daily Report and p'

q agenda helped in this regard.

Collection of pertinent inst

..uns and use of logs is recommended.

'L.

J /) c; o 9 C; l'

l.
  • I 7 907100 $35.

O

s.-

-~.

Boyce H. Grier 2

Jun 1 1979 b.

Much of the data being collected in the control room by IE was also being provided to IE and NRR by the licensee.

c.

Recomend plan for rotating shifts of IE personnel assigned to plant be pursued.

d.

Prior to arrival, inspectors should be made aware of site specific infonnation, such as badging requirements, need of Fonn 4 radiation history information, whole body counting, recent medical examination certificate (if available) for respiratory equipment, and availability of hard hats.

g H. C. Dance, Chief Peactor Projects Section No.1 cc:

R. C. Lewis

.. -