ML19224C934
| ML19224C934 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 05/05/1979 |
| From: | Galen Smith NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| TASK-TF, TASK-TMM NUDOCS 7907100269 | |
| Download: ML19224C934 (1) | |
Text
.
SC-320
SUMMARY
OF ACTIVITIES AT TMI FOR GREGORY C. SMITH 1.
Time of Arrival:
- C00 hrs., 4/26/79 Time on Duty
a.
1000 hrs. to 1800 hrs., 4/26/79 b.
0700 hrs, to 2000 hrs., 4/27/79 c.
0700 hrs. to 1600 hrs., 4/28-5/4/79 Total:
83 hours9.606481e-4 days <br />0.0231 hours <br />1.372354e-4 weeks <br />3.15815e-5 months <br /> i
l Time of Ceparture:
0800 hrs., 5/5/79 f
l 2.
Summary of Activities:
i
'While on duty, I was a member of the Environmental Mobile Survey Team.
Specific activities included taking air samples at varicus off-site locations as determined by meteorologic data, taking 3
i vegetation samples, and performing direct radiation surveys of the environment.
l 3.
Due to the nature of the work activities, my contact with the licensee j
was minimal.
Therefore, I have no comments regu.Hing licensee operations.
4.
No comment.
9 2
~'
790710026]
.