ML19224C931
| ML19224C931 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 04/28/1979 |
| From: | Roxanne Summers NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| TASK-TF, TASK-TMM NUDOCS 7907100254 | |
| Download: ML19224C931 (1) | |
Text
[
fe if s>
SUMMARY
OF ACTIVITIES AT TMI FOR ROBERT J. SU"MERS i
'j 1.
Time of Arrival:
1100 hrs., 4/20/79 Time on Duty:
a.
1100 hrs. to 1800 hrs., 4/20/79 q
b.
0730 hrs. to 1630 hrs., 4/21-25/79 c.
0730 hrs. to 1930 hrs., 4/27/79 d.
0900 hrs to 1000 hrs., 4/28/79 i
Total:
74 hours8.564815e-4 days <br />0.0206 hours <br />1.223545e-4 weeks <br />2.8157e-5 months <br /> Time of Departure:
1000 hrs., 4/28/79 2.
Summary of Activities:
While on duty, I was a member of the Environmental Mobile Survey Team.
Specific activities included taking air samples at varf aus off-site locations as determined by meteorologic data, taking vegetation samples, and performing direct radiation surveys of the envircnment.
3.
Due to the nature of the work activities, my contact with the licensee was minimal.
Therefore, I have no comments regarding licensee operations.
1 i
4.
No comment.
i i
7 907100259 qg 259 12?
N
..