ML19224C675

From kanterella
Jump to navigation Jump to search
Forwards QA Program Insp Rept 99900363/79-01 on 790329.No Noncompliance Noted
ML19224C675
Person / Time
Issue date: 04/26/1979
From: Potapovs U
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Hays C
B-LINE SYSTEMS, INC.
Shared Package
ML19224C676 List:
References
REF-QA-99900363 NUDOCS 7907060041
Download: ML19224C675 (2)


Text

[te "%

f UNITED STATES o,

NUCLEAR REGULnTORY COMMISSION

  • $ y) 77 REGION IV Y 2.I

{

q g

611 RYAN PLAZA DRIVE, SUITE 1000 5

g 7; AR LINGTON, TE X AS 76011 y,

../

p 2 G APR 1979 Docket flumber 99900363/79-01 B-Line Systems, Inc.

Attn: Mr. C. D. Hays Material Manager 509 West flonroe Street Highland, Illinois 62249 Gentlemen:

This refers to the inspection conducted by Mr. L. E. Ellershaw of this office on March 29, 1979, of your facility at Highland, Illinois, associated with the 10 CFR 50.55(e) construction deficiency report relative to defec-tive spot welds in strut material, and to the discussion of our findings with you and members of your staff at the conclusion of the inspection.

This inspection was made to confirm that, an evaluation of the condition had been performed, and responsibility for effecting corrective action and preventing recurrence had been assigned.

As you know, the flRC requires each of its licensees to assume full responsibility for the quality of specific products, components or services procured from others.

You should therefore not conclude that the fiRC's inspection exempts you from inspec-tions by an flRC licensee or his agents nor from taking effective corrective action in response to their. findings.

Areas examined during the inspection and our findings are discussed in the enclosed report. Within these areas, the inspection consisted of an exam-ination of procedures and representative records, interviews with personnel, and observations by the inspector.

Within the scope of this inspection, we found no instance where you failed to meet flRC requirements.

In accordance with Section 2.790 of the Commission's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter to-gether with the enclosed inspection report will be placed in the Commission's Public Document Room.

If this report contains any information that you believe to be proprietary, it is necessary that you make a written appli-cation within thirty (30) days to this office to withhold such information from public disclosure.

Any such application must irclude a full statement of the reasons on the basis of which it is claimed that the information is q c' '<i f i D)

(_

g g e '7 0 d, 3,

B-Line Systems, Inc. proprietary, and should be prepared so that proprietary information iden-tified in the application is contained in a separate part of the document.

If we do not hear from you in this regard within the specified period, the report will be placed in the Public Document Room.

Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

.t /E wW Uldis Potapovs, Chief Vendor Inspection Branch b

Enclosure:

Inspection Report No. 99900363/79-01 9

S.

Y h

g w

J f