Text
'
a neco
[r
'o, UNITED ST ATES
$Jk['_'d'f)'%
e" NUCLEAR PEGULATOP,Y COMMISSION y
REGION lli
[
799 ROOSEVELT ROAD o,h[
[
GLEN ELLYN, ILLINOls 60137 N
JUN 2 /1979 State of Illinois Dcpartment of Public Health ATTN:
Mr. Gary N. Wright, Chief Divi: ion of Nuclear Safety 535 West Jefferson Street Springfield, IL 62761 Gentlemen:
The enclosed IE Circular No. 79-10 titled "Pipefittings Manufactured From
'bacceptabl, Material" was sent to the following licensees on June 26, 1979, for action:
Americr.n Electric Power Service Corporation Indiana and Michigan Power Company D. C. Cook 1, 2 (50-315, 50-316)
Cincinnati Gas & Electric Company Zimmer (50-358)
Cleveland Electric Illuminating Company Perry 1, 2 (50-440, 50-441)
Commonwealth Edison Company Braidwood 1, 2 (50-456, 50-457)
Byron 1, 2 (50-454, 50-455)
Dresden 1, 2, 3 (50-10, 50-237, 50-249)
La Salle 1, 2 (50-373, 50-374)
Quad-Cities 1, 2 (50-254, 50-265)
Zion 1, 2 (50-295, 50-304)
Consumers Power Company Big Rock Point (50-155)
Midland 1, 2 (50-329, 50-330)
Palisades (50-255)
Dairyland Power Cooperative LACBWR (50-409)
Detroit Edison Company Fermi 2 (50-341)
Illinois Power Company Clinton 1, 2 (50-461, 50-462) 9 9,,
QDO
~
JUN 2 71979 State of Illinois s Iowa Electric Light & Power Company Duane Arnold (50-331)
Northern Indiana Public Service Company Bailly (50-367)
Northern States pur-r Company Monticello (50 Zo3)
Prairie Island 1, 2 (50-282, 50-306)
Tyrone Energy Park 1 (50-484)
Ohio Edison Company Erie 1, 2 (Pre-CPP)
Public Service of Indiana Marble Hill 1, 2 (50-546, 50-547)
Toledo Edison Company Davis-Besse 1 (50-346)
Union Electric Company Callaway 1, 2 (50-483, 50-486)
Wisconsin Electric Power Company Point Beach 1, 2 (50-266, 50-301)
Wisconsin Public Service Corporation Kewaunee (50 305)
Sincerely, n
A.,'I(l2<, ] /Igf2Y Helen Pappas, Chief Administrative Branch
Enclosure:
IE Circular No. 79-10 cc w/ enc 1:
Mr. D. W. Kane, Sargent & Lundy Central Files Reproduction Unit NRC 20b Local PDR NSIC TIC 7 C ',
\\ ;; r c
l'.S.
NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT REGION III June 26, 1979 IE Circular No. 79-10 (7906200171)
PIPEFLTTINGS MANUFALRIRED FROM UNACCEPTABLE MATERIAL Description of Circumstances:
Liberty Equipment and Supply Company of Kennewick, Washington and Tube Turns Division, Chemetron Cciporation of Louisville, Kentucky reporced on April 4 and 12, 1979, respectively, that potentially defective pipe fittings were manufactured from material with a high carbon content beyond the range allowed by ASTM A-234 WPB.
These high carbon content fittings may crack when welded.
Tube Turns received 3.500 OD x.250W pipe from U. S. Steel - Lorain -
identified as U. S. Steel Heat No. N570028.
A total of 28,153 feet was received and identified by Tube Turns as Lot W6719.
U. S. Steel has not been able to determine the exact number of lengths of pipe of incorrect chemistry, but indicated it could be at least four lengths. From this pipe, 4" - 90 degrees and 45 degrees
.237 wall elbows and 2"
.237 wall straight tees, ASTM A-234 WPB, were produced by Tube Turns.
Each length of pipe is teenty feet and makes from 20 to 30 fittings. Approximately 27,000 fittings were produced and each is identified by Tube Turns Lot No. W6719.
Shipment of these fittings started in March of 1978, and it is estimated all were shipped before the end of 1978.
On May 10, 1979, the Tube Turns Division reported to the NRC that 4" elbows, Lot W6719, have been provided to the nuclear power plants listed below.
U.S.
Steel has tested about one hundred and fifty (150) loose and installed fittings at the seven sites noted by on asterisk.
- Grand Gulf
- Zi=mer
- Phipps Bend
- Waterford III
- Brown's Ferry Midland Limerick Shoreham
- LaSalle Sequoyah
- Brunswick Hartsville Bellefonte On June 1,1979, the Tube Turns Division reported to the NRC via telephone that of the 160 fittings tested at Nuclear Power Plants, three (3) pieces were found to have a high carbon content and were replaced.
^
~
All construction permit holders are adv i
~ ~
pipefitting receiving documents for the DUPLICATE DOCUMENT and determine if fittings manufactured 1 identified as Tube Turn Lot W6719.
If u Entire document previously entered were received, appropriate corrective air into system under: