ML19224C489

From kanterella
Jump to navigation Jump to search
Responds to Action Item 11.Determines That No Mod to Current Tech Specs Are Necessary.Authorization for Response to Be Submitted One Day Beyond 30-day Reporting Period Granted to J Parkyn by K Ridgway on 790518
ML19224C489
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 05/18/1979
From: Linder F
DAIRYLAND POWER COOPERATIVE
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
FOIA-79-98 LAC-6297, NUDOCS 7907020454
Download: ML19224C489 (2)


Text

,

n.-

DAIR LtND POWER COOPERATIVE

& Gm %a, 54601 May 18, 1979 In reply, please refer to LAC-6297

- ~

_ - T-DO_CKEb NO. 50-40$~

Mr. James G. Keppler Regional Director

? ?:

U. S. Nuclear Regulatory Cc= mission Directorate of Regulatory Operations Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137 SU3 JECT:

DAIRYLAND POWER COOPERATIVE LA CROSSE BOILING WATER REACTOR (LACBWR)

PROVISIONAL OPERATING LICENSE NO. DPR-45 IE BULLETIN NO. 79-08

Reference:

(1)

NRC Letter, Keppler to Linder, dated April 14, 1979.

(2)

DPC Letter, LAC-6262, Linder to Keppler, dated May 2, 1979.

Dear Mr. Keppler:

In response to Action Item No. 11, we have determined that consistent (Reference 2),

with our earlier response to Action Items 1 through 10 no codifications to current Technical Specificatiens are necessary.

Authorization for the response to be submitted one day beyond the thirty-day reporting pericd was granted to Mr. John Parkyn, Assis-tant Superintendent, by Mr. Ken Ridgway on May 18, 1979.

Very truly yours, DAIRYLAND PCWER COOPERATIVE Frank Linder, General Manager FL:RES:af U. S. Nuclear Regulatory Cc:=nission cc:

Office of Inspection and Enforcement 2[2 Q][

Divisicn of Reactor Operations Inspection Washington, D. C.

20555 Mr. Larry Witt, Facility Engineer.

American Nuclear Insurers 0204 @

n Farmington, Connecticut 06032 gyg g _ff Q,