ML19224C414

From kanterella
Jump to navigation Jump to search
Forwards LER 79-050/03L-0
Date released: 08/26/2019 Download: ML19224C414


LER 79-050/03L-0 on 790609:while Performing HPCI Valve Operability Test,Pump Suction Valve Failed to Open within Specified Time.Caused by Loose Connection in Shunt Field Circuit.Connection Tightened & Motor Released
ML19224C419
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 06/21/1979
From: Nix R
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19224C419 (1)
Forwards LER 79-050/03L-0
ML19224C412
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 06/21/1979
From: Manry M
GEORGIA POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19224C412 (1)