BOSTON EDISON CO M PANY ornce omets aco scytamm stucrr sostem. Mas sacwus trTo o2199

a. cas .v.oon=w.

ac=

NWCLEAS OPCRATIOMs DEPAAT,eCNT May 15, 1979 BECo. Ltr. #79- 93 Mr. Boyce H. Grier Office of Sspection and Enforce =ent Region I U.S. Nuclear Regulatory Co= mission 631 Park Avenue King of Prussia, PA. 19406 License No. DPR-35 Docket No. 50-293 Surelenentarv Resconse to IE Bulletin No. 79-08 Ref. a) Boston Edison Cc=pany letter to Mr. Boyce Grier dated April 25, 1979 titled " Response to II Sulletin 79-08"

Dear Sir:

Boston Edison Co=pany's initial response to II Eulletin 79-08 (Ref. a) included Ite=s 1-10. Ite= 11 was to be addressed in a subsequent letter within 30 days of the date of the Sulletin and is as follows:

Item 11 Propose changes, as required, to those Technical Specifications which cast be = edified as a result of your implementing Ite=s 1-10.

Response

No Technical Specificatien changes were required as a result of imple=enting te=s 1-10. However, certain Station Procedures required modificatica and have been changed accord.ingly.

Should you have any further questions or concerns please do not hesitate to Contact US.

7ery : uly yours, 2hh [l ['g cc: Director Office of Inspection and Enforc.enen:

/_e'K/Gh 0'5 #

1K Division of Reactor Operatiens Inspection Washington, D. C. 20555 7907020 # ~