ML19224C329

From kanterella
Jump to navigation Jump to search
Lists Review Consideration for Plants Nearing OL Decision Date Including Operator Licensing,Administrative Controls, Qa,Initial Test Programs & Technical Qualifications
ML19224C329
Person / Time
Site: Crane 
Issue date: 04/17/1979
From: Skovholt D
Office of Nuclear Reactor Regulation
To: Ross D
Office of Nuclear Reactor Regulation
References
NUDOCS 7907020148
Download: ML19224C329 (2)


Text

.

/ g'j UNITED STATCd j

s,,1 f.UC LE A R H LIGU L A 1 ORY CO....".isst C *J f7 g

['

WMHING TON D. C. 20L5

/

g

_a

./ J-1 2

  • %,, ] f
  • gpg 171979 i I NOTE T0:

D. Ross

SUBJECT:

REVIEW CONSIDEPATIONS FOR PLANTS NEARING OL DECISION DATE As discussed in ir.eeting in R. Boyd's office, we are commencing prepara-tion of activities needing attention before OLs are issued, in light of the TMI-2 experience. Within our assigned review areas, we are consid-ering the following aspects.

1.

Operator Licensing, including:

a.

Training Requirements b.

Regulification Requirerents c.

Examination Scope and Content d.

Attitudinal Reinforcement 2.

Administrative Controls, including:

a.

Operating Procedure Type and Content b.

Emergency Procedure Type and Content c.

Lock and Tag Procedure d.

Shift Turnover Procedure 3.

Quality Assurance for Operations 4.

Initial Test Programs, including:

a.

Preoperational Test Program Pesults b.

Startup Test Program Content c.

Overall Program Review 5.

Technical Qualifications, including:

a.

Methods of Determination b.

Provisions for Rapid Augmentation Within each of the above aspects, we shall develop specific items to be settled before OL issuance.

When possible, these items will define requirements to be met or actions to be taken; in some cases, they may merely reflect the need for trore study.

We will have a first cut at this list by the end of this week.

7S07000NT

&R:p l'

D. Ross g 7 373 For each item, we shall categorize it as:

1.

f;eeding full implementation before OL issuance, or 2.

Needing appropriata commitments before OL issuance and short-tenn implementation, or 3.

Needing appropriate commitments before OL issuance and long-tenn implemen ta tf on.

hfY' &

Ocn Sko olt,ADQA0 cc:

R. S. Boyd D. B. Vassallo W. P. Haass P. F. Collins 7t. U' /1 1,1 '_.

r i

r.