,[ 'h/ )I WASTE MANAGEMENT GR0llP 7: j fD' f) R R.

GAS MANAGEMENT TASKS j

ph

~~__

Task Plant Mod.

Cognizant No.

Control No.

Pri Description Engr.

Status G-1 WG-1 A-1 Install AB/FilB of f-gas filter C. Montgomery Phase I design complete.

System description is system to back-up plant system W.

Itschner complete, start-up procedure in drafting.

Preop

  • J.

Collins procedure in draf ting by Met-Ed.

UE6C supporting construction.

Plan is Phase I, 2 or 4 trains running. Phase I schedule developed, show 4/28 completion.

Phasa II & III lead to permanenc system, scheduled shows 5/1 operation.

Noise problem requires evaluation.

G-4 WG-3 A-1 Vent stack monitoring system

11. Morton Working on calibration for noble gas release to replace llP-R219 J. Cline monitoring.

Eberline serviceman and SRI have C. Pelletier calibrated on noble gas and lodine.

  • P.

Stoddart G-5 None A-1 Change out AB/FilB llVAC J. McConnell Long term storage plan under study, 35 vent filter train charcoal C, Edwards permanent storage /shipplagcontainers in bed fabrication delivery starts 4/25.

"A" trains of tiie AB filters and "A" train of FilB filters IN3 removed and replaced, units back in service.

'l' liigh radiation level in "B" train dictates delay

~d "B"

train change out.

Fire sensor tripped, deluge CZ) vales reset.

Deluge systems secured on all sa renewed filter trains.

C-7 1063 A-2 Condenser vac".m pump dis-J. Robison Filter operational.

Investigating operating

%3 charge filter system.

C. Montgomery criteria. Will evaluate DF.

43

  • J.

Collins O

Ch tO O

O iU g

sj (p

  • NRC Contact 6 gDM p

o P

q90 g

J' Date; April 26, 1979 Time:

1200 WASTE t1ANAGEMENT GROUP GAS MANAGEMENT TASKS Task Plant Mod.

Cognizant No.

Control No.

Pri Description Engr.

Status C-15 None A-3 Emergency RB Gas Purge Cleanup Open On hold, no plan to implement.

NRC is System

  • J.

Collins pursuing the issue with Sandia Lab.

G-29 WG-7 B-3 FilB Airlock Inactlye Determination made that airlock is unnecessary

  • L, Barrett at this time, G-30 Mone A-2 Reactor Purge System Charcoal J. McConnell Priority request made to obtain a RB purge filter Filter Sample
  • J.

Collins sample or cell for analysis. Radiation survey requested. Task on hold.

G-31 None A-1 Determine Air Flow Paths in A. Nawaz Critical examination of operating status and AB/FilB W.

Itschner instrument status underway.

Operating matrix J. Robison being developed - available 4/22. Update

  • L.

Barrett scheduled 4/28.

G-3?

None A-1 Determine that there are no A. Nawaz Examination of plant status / configuration under-unidentified air flow paths W.

Itschner way.

First cust review complete.

J. Robison

  • L.

Ba r re t,t G-33 None A-2 Desensitize AB and FilB Filter E. Sieg Preliminary investigation is that desensitization Monitors

  • P.

Stoddart is infeasible.

N Ln N

Q y

  • NRC Contact b[

Date: April 26, 1979 WASTE MANAGEMENT GROUP Time; 1200 GAS MANAGEMENT TASKS Task Plant Mod.

Cognizant No.

Control No.

Pri Description Engr.

Status G-34 None B-1 Review overall Unit 1 and 2 AB W.

Itschner Review underway; Documentation completed, and FilB ventilation requirements J. Robison with a view towards minimum flow *L.

Barrett from Unit 2 to Unit 1.

  • J.

Collins G-35 None B-2 Start criteria setting for GAI, Reading CAI requested to provide design concept by 4/20.

isolating Unit 1 and Unit 2, C. Montgomery Concern identified because of low negative FilB-se ismic, ventilation, service

  • R. Weller pressure in FilB.

Air flow partition needed, cranes, etc.

Temporary ventilation isolation betweca Unit 1 and 2 has near term urgency.

G-36 None B-2 Develop " standard" contaminated

  • P.

Stoddart The need, required evaluation and action plan-work area radiological protec-i t. necessary.

Suggest tasking a Met-Ed HP, tion system (s) including air Met-Ed Maintenance, ALARA on WMG team to develop supply, clothing, communications standard work package.

systems, etc. which permit beat possible working conditions.

G-3/

B-2 Develop status system to monitor / 11. Marton Started sampling Unit 1 stack monitor on a routine report I 131 and noble gas re-basis. Plan being expanded.

leases and sources.

G-38 B-1 Develop plan for ventilation sys-Need identified to set up a plan Control / advise tem operation based on fan / filter on local and system ventilation practice.

train status and on door openings and other plant operations evaluations.

p)

LJ7 N

CD N

(v

  • NRC Contact

Date; April 26, 1979 WASTE MANAGEMENT GROUP Time; 1200 GAS MANAGEMENT TASKS Task Plant Mod.

Cognizant No.

Control No.

Pri Description Engr.

Status G-39 B-2 Develop and assess back-up gas J. McConnell B&R has developed a concept.

Evaluation of filtration schen.e to cross con-cost (technical) to benefit (technical job nect the Auxiliary Building review.

Second estimate scheduled shows 14 filters to the RB purge filters, day + schedule. lleisman Co. has developed drawings. Next step is to'make entry to establish dimensions.

Exposure / schedule cost appears too high! Contingency plan is to open roughly filter manway if emergency ventilation of Auxiliary Building is needed.

G-40 A-1 Criteria for an,1 control tasas 20 " Red Devil" type local filtration systems resulting in the evolution of on order to control welding fumes, contaminates that could poison charcoal filters.

G-41 B-2 Develop filter management strategy.