Forwards Revisions to Schedule for Westinghouse & C-E Repts Re Scope of Work, Current Licensing Considerations, Findings & Recommendations
ML19224C147
Person / Time
Site: Crane 
Issue date: 05/15/1979
From: Thadani A
Office of Nuclear Reactor Regulation
To: Israel S, Thatcher D, Wilber H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE), Office of Nuclear Reactor Regulation
References
NUDOCS 7906290170
Download: ML19224C147 (4)


Text

--

i t,

<~

.?-

c-

/

i

"." dress 3es

" _ Indun hted 05/15/79

\\.

scael S. Varca D. a t c ~. e r F. ','i i i f a r's al.cer, i R.

a. cd ra t i__

C..Liang N. '-la g n e r A. Ignatonis T. '-larbach

3. Wilson R. 'oa ttson M.

Cairtile u.

d 3 ar3uerD T, 'lc. a k R. Reid V. Stello G. izetis E. Case F. A sr.a A. Sch vencer D. Fischer B. Cox

3. Ecger,.

R. Bursey D. Ornar-C. Grimes C. Nelson' J. Shapaker G. Vissinc Z. Rosztac :.

..- s u e u u =

R. Franm

3. Sneron W. Jensen H. Cenrad F. Odar P. Norian S. Siegel L. Beltracchi A. Thadani
. Graves S. Newberry G. Kelly R. Scnoll P

a t the'.9s L. Riani R. Giardina J. '.;a rni ei A. Bennett J. Calvo M. Taylor J. !'urphy M. Cunnincham N. Villaiva P. O'Reilly R. Tedesco 256 21'/

7906~"90lqo d

)'

k Alf

/

\\

;i REC JTA TEs c

's

- ? '-

NUCLE AR REGUL A TC R Y CC'.1 MISSION 1,

1;--- / i u m oros o

sss

=. N Jt,r !

  • n g

.'uY 15 373 NOTE TO: Those on Attached List FROM:

A. C. Thadani SU3 JECT:

' AND C-E EVALUATIONS d

On Acril 27 I met with the memters of my group and described the scoce of work, 3ssignments, and the schedule for,ccmpleting an evaluaticn of the operating 'd and :-E olants.

In view of the delays in obtaining the necessary data, it has been necessary to revise the schedule. gives the revised schedule.

I have also modified the cutline (see Enclosure 2) and I believe the revised format e;ould permit the reader flexibility in pursuing details of interest without having to read the whole report.

Essentially the rain body of the report wculd describe scope of work, current licensing consider 3tions, and the findings and recommendations.

The appendices would include system designs, detailed analyses, operator considerations, and short-term and long-term recommendations.

If you have any cuestions on scope and/or schedule, please call me at x27341 or bring it up at our daily meetings.

r

,, ~,. a Ashok C. Thadani Reactor Systems Branch

Enclosures:

1. levised Schedules
2. Report Outline (See ittached list) cc:

Contact:

Ashok Thadani, NRR 49-27341 256 218 e

9 e

i

4 ENCLOSURE 1 RE'/ISED SCHECULE FCR W AND C-E 3EFORTS

'tilestene

ue la tes W

C-E

1. All Draf t Write-ups Except Analysis 05/13 05/18
2. A. Th2dani Ccmrents on Item 1 05/21 05/21
3. Draft *,nalysis '.irite-ups 05/22 05/23 4 Revised Wri te-ups - Item 1 05/23 C5/23
5. anagement Ernefing on AFWS Findings (P.atthews) 05/24 05/24(
5. A. Thadani Ccmments on Item 3 (Analysis) 05/24 03/24
7. Revised Analysis Write-ups 05/26 05/26
3. anagement Sriefing cn Draf t Report Findings 05/28 05/28
9. Draft Report Issued for Cerments 05/29 05/29
10. Comments on Draft 06/01 06/01
11. Final Report issued 06/06 C6/06 7_5) b

4 E'CLOEURE 2

[E CRT CUTLINE SJ'"fsRY A,D CCNCL"SICNS INTF0 DUCTION LIC. BASIS AND REGULATICNS EULLETINS -- SL:"'ARY FINDINGS ViD REC:."PENCATICNS APPENDICES 1.

Principal Design Characteristics 2.

"ain Feedwater Systems 3.

Auxiliary Feedwater Systems 4

Control Systems S.

Safety Systems 6.

Ins trumenta tion 7.

PORVs + Safety Valves 8.

Containment Isolation 9.

Challenges to Systems PORV ECCS

10. Natural Circulation
11. Analysis Considerations Transients that Challenge PORV Complete loss of Feedwater Small Breaks Michelson Concerns
12. ACRS Recommendaticns
13. Operator Considerations 256 220

?

,i