ML19224C117
| ML19224C117 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 05/02/1979 |
| From: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| References | |
| NUDOCS 7906290035 | |
| Download: ML19224C117 (2) | |
Text
,
$a 7 '
~
The organization will have the cognizance a n d ca..sh i l : t v 'or implementing the following activities:
Analysis, as appropriate, of plant conditions and operating mode.
in system design or proposed chanc Independent analysis of dose to oublic via,all pathways for proposed releases of gaseous or liquid activity and evaluation of solid storage.
Analysis of plant activities in conformance with ALARA objectives, to include evaluation o plant f
organization, personnel training and,rocedures.
Review and analysis of proposed operating plans and procedures te accomoli sh maj or ocerations such as long term cooling, containnent cleanup and entry, and core removal.
Preparation of Technical Specifications appropriate to the plant
,c idi t ions and act ivi t ies.
Interface with the licensee, IE, and all government agencies involved in reactor safety and environmental issues.
Preparation o' presentations and correspondence apornoriate to the TMI accident such as green tickets, oriefings of State, local and federal agencies and the Commission.
In order to carry out the above activities, the following resources will be required on a dedicated basis:
256 297
'906290
% %o c37
\\.
C i.
L,.
A C
r.
6I g-v c-n d
P.
E w
m
=
=
e, u
- I 0
_T C
69
^
C C
U C-O P.
3 C
L U
V.
T 3
C E
C C
W U
v.
t; c
C C
.~
E b
V U
C' O
w W
>^
L*.
"v.
mN t'
F-Cl C.,
V E
L m
'S
^
E
- ~
C F.
~
c-c n
w c
C C
C w
v w
C U
C L_
Q C
C 0
4.;
C
- r w
c_
c c
a P
- he' Vs C'
L*)
F.
W c.
am u
N
{
2
^
n.
2,,
e v
Lh l
e L: !
e u
G
-I v
4 I
l C
1 u
7 P
r.
P L"
b~
M C
s-n C
s v
O J
C^
1 Q:_ il c-
=
L.' 4 w
0l
.L
.C.
C w
E
- 't r.
e O
C V
5f tr.-
C
'" ' l e*
C' L.
Zl M C C C C
sn t.
1 v
-= l C
R C L C :
l C C T
L L.
n l
1.
C U
256 298
.