.I Intui-Office Memorandum
~
~ ~^
f f.
Dae April 26, 1979 M
v Sur.ect
%TURAL CIRCULATION INITIATION TASK FORCE To B. ACKERMAN S. LEYY Locanon Three Mile Island J. HER3E1N L. PLEEE R. KEATON
- w v rm L. KOLONAY R. VOLLMER M. LEVENSON R. WILSON A Natural Circulatic1 Iniriation Task Force was establishei by =y memo of 4/23/79.
Following is an update of the me=bership of the task force and current telephone numbers.
The ch trter remains unchanged.
Organization Name On-Site Phone Off-Site Phone Met-Ed/GPU J. Herbein 944-153a 838-5222 R. Arnold 944-2506 533-3311 Room 454 B&W L.
Pletke 944-4206 564-3876 G. Kulynich (Alt.)
944-4206 939-7841 Industry Advisory Group S.
Levy 944-0305 533-3311 M. Leve. son (Alt.)
944-0205 W.
Shouge (Alt.)
944-0205 763-7117 Special Instrumentation
- 3. Acke man 944-1012 939-7841 Group L. Kolot ly 944-0830 Technical Support R. Wils.a 944-6170 774-2721 R. Keatoa (Alt.)
944-4029 234-5021 NRC V..Stello 782-3950 939-9854 Room 122 R. Vollmer (Alt.)
782-3950 939-1331 Room 211 Charter:
1.
Assemble in Unit 2 Control Room area in anticipation of deliberate initiation of natural circulation; or as soon as possible following loss of operating RCP.
2.
Provide real time review of available data and advise plant opera tions relative to proceeding with attempt to initiate natural circu-lation.
3.
Provide real time review of available data and advise plant opera-tions of appror -iate actions to take in the event of unanticipated developments.
~
4.
Mr. Herbein, or in his absence, Mr. Arnold, shall be the only individuals with decision-making authority, i.e.,
the only indivi-duals who may direct the plant operators to take specific action.
/
- %c 256 286
=
M F
78Ns J C. #,.. "
sear R.
RCA:dlw cc:
H.
Diecka=p General'Cperations Manager GPU
~
G. MillerGPU Service Corpora:.on is a subs.ciary of General Put!,c U:Ecs Corocrahon v
Inter-Office Memorandum Ome Apri1 26, 1979 W----Mj3erVICO r n
=
LE Sut e TMI/GPU Data Reduction & Management Group Status Report #9 TMI Site To DISTRIBUT10N mon Attached for your information is the TMI/GPU Data Reduction Manage-I ment Group Status Report #9.
The following information is included:
Graph 51 TMI Unit #2 Reactor Building Temperature and Pressure (April 1 thru April 26 @ 0600 hrs.)
Graph #2 Tf11 Unit #2 Reactor Pressure and A Loop Temperature -
ColJ (April 1 thru April 26 @ 0600 hrs.T Graph #3 TMI Unit #2 Letdown Temperature and Flui (April 1 thru April 26 @ 0600 hrs.)
Graph #4 TMI Unit #2 Six Highest T/C Readings (April 8 @ 1800 hrs.
to April 26 @ 0600 hrs.)
Graph #S TFI Unit #2 Once-Through Steam Generator ( A) Level and Pressure ( April 1 thru April 26 @ 06M hrs.)
Fraph 46 TMI Unit #2 Once-Through Steam Generator (B) Level and Pressure ( April 1 thru April 26 @ 0600 hrs.)
Updates will be provided and distributed.
- l f,(ALA L.'WEISER RMG JLW/nlk Distribution: ilBC 30itOf.JFaTEr.JDEEsouth?.GP4 NRC (ISE) Trailer #8 "
NRC (NRR) Trailer #27 "
GPU Assessment Croup Trailer en.
GFU Admin. Group Trailer #17 GPU Management (Mr. Dieckamp) Trailer #14 GPU Management (fir. Arnold) Trailer #201 B&W, Met-Ed Licensing Trailer #19 HP (Mr. Gaber) Trailer GPU Support, Trailer y p
- -m=2am===mimmmy G. Miller, Trailer #125 DUPLICATE DOCUMENT ORMG, Trailer #202 (fr Radwaste Management, T Entire document previously entered Burns & Roe - Cobean,
.into system under:
[,
Met-Ed Management (J.
=,
Hartford Steam Boiler, ANO
)gJ No. Of pages:
]
GPU Sei.o Corcora m s : c.+v
,