ML19224C090
| ML19224C090 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 06/18/1979 |
| From: | Tedesco R Office of Nuclear Reactor Regulation |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 7906280265 | |
| Download: ML19224C090 (1) | |
Text
/
o.to ROUTitiG AfdD TRANSt,t!TTAL SUP
[/
TO: (Name, office symbol, room number, ini ials Date Dullding, Agency / Post) 2.
NRC PDR Assessions Unit (P-50) 2 3.
4, i
!L Action Fife Note and Return Approval For Clearance Per Conversation As Requested For Correction Prepara Repty I'Irculate For Your information see Me Comment investigste S!gnature Coordination Justify REMARKS TO BE PLACED IN NRC PDR
~,
DO NOT use this form es e RECORD of approvals, ccncurrences, disposals, clearances, and similar actions
}
FROM: (Name, org. symbol, Agency / Post)
Room No.4;dg.
8 o-11228 Robert L Tedesco, L Task Force, 1 P one No.
2 i 11-2 X28090 9 1-102 OFTIONAL FORM 41 (Rev. 7-76)
C c. s. cpo:t sn-o-241-s m/222e A I~II #
258 110 7 9 0 6 28 0 % 7 jd
,... o r c,,
J, UNITED STATES
[ % s-[m'( j NUCLEAR HEGULATORY COMf.11SS!ON'
,,.. Q f-'.f/,
C WASHi*JGTON, D. C. 20555
'i JUN 181579 MEMCRANDUM: To Files FRG:1:
R. L. Tedesco
SUBJECT:
fiEETIflG WITri If1DUSIRY REPRESENTATIVES A brief meeting was held on June 12, 1979 with the following to discuss certain of the actions now being taken by the industry in response to the TMI-2 accident:
F. Lewis (EPRI)
H. Denton (NRR)
J. Selby R. Mattson (NRR)
F. Linda R. Tedesco (NRR)
W. Lee (0P)
S. Berstein (CP)
J. Kearny (EEI)
G. White A plan was described by F. Lewis (EPRI), Chairman of the TMI Ad Hoc Nuclear Over-sight Committee to study the affects of TMI. A series of detailed technical reports will be issued by the consortium to cover the following:
operating plant interfaces
- core behavior
- primary coolant thermal-hydraulic history instrument and computer characteristics
- hydrogen generation and history
- radiological pathways R. J. Mattson will be general NRC point of contact with the consortium.
The efforts are directed to conduct an in-depth comprehensive study of T"! to further ensue the safety and operability of nuclear pawsr planta.
Initial resources in-clude about 3.5 x 106 dollars.
d J Q_.c= m a
R. L. Tedesco cc:
H. Denton liRR R/F PDR V R. ffattson 258 11;