NUCLEAR REGULATORY COMMISSION i

OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.

APR 101979 INCIDENT MESSAGE FORM T0:

The Commissioners FROM:

John G. Davis, Acting Director, Office of I

ction and Enforcement THRU:

e V. Gossick, Director, EMT

SUBJECT:

MANNING 0F NRC OPERATIONS CENTER With the Three Mile Island reactor in controlled preparation for natural conviction cooling, the staffing within the Operations Center is being progressively reduced. All staff, including EMT members, will continue to be on call.

The NRR technical staff has returned to their normal work l'ocations with the exception of Operations Center coverage from 12 midnight to 6:00 a.m.

The IE staff coverage in the Operations Center will be:

Full-time (24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />) - Two reactor operations personnel One health physicist During the hours indicated below, this coverage will be augmented as follows:

Operations Status Officer (6:00 a.m. - 8:00 a.m.)

Operations Status Officer (4:00 p.m. - 10:00 p.m.)

Telephone operator / typist (6:00 a.m. - 8:00 a.m.)

Telephone operator / typist (4:00 p.m. - 10:00 p.m.)

ohn G.

vis Adting irector Office of Inspection and Enforcement cc:

H. R. Denton E. G. Case R. G. Ryan R. B. Minogue hk.

B. H. Grier h,a 062 700/

[

......