TMI DOCITMENTS DOCUFE?Tr NO:
TM-F3G COPY MADE O_N E A.'
OF DOCUMENT PROVIDED BY METROPOLITAN EDISON COMPANY.
Oj,np Supervisor, Document Control, NRC 205 301 7906150llD 1
i
~
Burns and Roe,Inc.
q P. O. Box 667 m 650Wmters Avenue, a Param6s, New Jersey 07652
- Tel. N. J. (201) 2'65-9500 - N 1
Telex 134322 m Cable BURCE PARAMUS. N.J.
Subject:
W.O. 2555-02 Jersey Central Power and Liglit Company y,;,;,
2 700 x;ne,rg m.cs Ro,e Three Mile Island Nuclear Station Unit No.
Hot Functional Testing Temperature Mappirn oraden. New Jusey O7649 (201) 265-2000
Reference:
GPU letter TMI-2/2433, dated May 3, 1976
- tachments :
(1)
Temporary Temperature Sensing Devices for Hot Functional Testing (4 sheets)
(2)
Sample Data sheets for Temperature and Humidity Recording (2 sheets)
.May 31, 1977
~'-
Serial No. 3842-GP Mr. R. W. Heward, Jr.
GPU Service Corporation 260 Cherry Hill Road Parsippany, NJ 07054
Dear Mr. Heward:
In regards to the ' above reference, we have reviewed pro-i ding
~~---
,~,(visions'for' temperature mapping in the Reacter Bu l during Hot Functional Testing.
In order to obtain an adequate temperature mapping of the building, readings should be taken from the 16 temperature and humidity sensors permanently installed in the Reactor Buidling and 7 temporary temperature The permanent sensing devices all have sensors.
These indication on panel 25 in the Control Room.
sensors are:
AH-TE-5010, 5011, 5012, 5013, 5014, 5015, 5016, 5017, 5020, 5021, 5022, 5023, 5027, 5088 and AH-HE-5032,'5090 The temporary tempera-ture sensors with installation instructions are listed in the attachment.
Temperature and humidity data recorded during Hot Functional Testing should be returned to Burns and Roe to the attention of Mr.
R. A. Podesfinski.
205 102 5
Durns and Roe, Inc.
Mr. R. W. Heward, Jr.
Page 2 5/31/77 - S/N 3842-GP Sample data sheets are shown in attachment #2.
It is suggested that readings be taken from all instruments at two (2) hour intervals as shown on the attached forms for several " typical peak load" days.
Very truly yours, c
chn P.
Cady, Jr.
Project Manager JPC/ RAP /fap Attachments cc:
W.T. Gunn, GPU Site, w/att W.F.
Ischner, GPU, w/att R.J. Toole, GPU Site, w/att.
") a r
.q7 I
ATTACHMENT 1
TEMPORARY TEMPERATURE SENSING DEVICES FOR HOT FUNCTIONAL TESTING Already existing in the Reactor Building are Resistance Temperature Devices (RTDs) which can be used for the Hot Functional Test.
These RTDs are part of the Leak Rate Test System (Flow Diagram #2517) and can be temporarily moved to the locations needed for the Hot Function Test.
These temperature measurements may be obtained at a temperature indicator (tag #LR-TI-4128)on rack 478 at elevation 328 ft. of the auxiliary building, co-ordinates A65-AD (see General Arrangement drawing #2067).
The following is a listing of the RTDs used and their pertinent information:
RTD HOT FUNCTIONAL LR-TI-4128
- EXISTING TAG #
TEST LOCATION READOUT #
CABLE LR-TE-4139 Air intake to 10 TD1318I Reactor Building fans LR-TE-4148 Reactor Vessel 19 TD1327I Cavity El. 305 ft.
LR-TE-4149 Steam Gener. B 20 TD1328I Support Skirt LR-TE-4150 Reactor Vessel 21 TD1329I CRD Cable Area LR-TE-4151 Steam Gener. B 22 TD1330I "D"
Ring El. 360' LR-TE-4152 Steam Gener. A 23 TD1331I Support Skirt LR-TE-4153 Steam Gener. A 24 TD1332I "D" Ring El. 360' Present location of these RTDs for the Leak Rate ta st are shown on Orawing 3107 Rev 7.
In order to locate these RTDs at their Hot F1nctional Test locations, the following modifications must be eifected:
These cables and cable #IT3889 must be pulled and terminated before the Hot Functional Test.
205 304 m
~
~
1.
RTD #LR-TE-4148 is enclosed in a box at elevation 347',
coordinates N+22', E+48', within the Reactor Building.
One hundred feet of coiled cabic (#TD1327I) is included with this RTD.
Uncoil the cable and bring the RTD to the Auxiliary Fuel Handling Bridge atop the reactor vessel.
At this point, disconnect the RTD from the cable.
Install a five terminal junction box to any local excess structure (such as a handrail) and termi-nate cable #TD1327I to it.
To the other side of the terminals of the junction box, terminate a 100 foot length of 4 conductor, #14 AWG cable with a FR-15EE jacket.
Snake this new cable with an equal amount of steel cable between the inside wall of the primary shield and the outside wall of the reactor vessel to elevation 291'-6".
Bring the RTD #LR-TE-4148 to this location and terminate it to the cable at elevation 291'-6".
Tie the steel cable around the RTD.
Pull the other end of the steel cable up approximately 15 feet and secure the steel cable to a local hand-rail at the Fuel Handling bridge.
2.
PTD #LR-TE-4149 is enclosed in a box at elevation 347',
coordinates S+3', E+42' within the Reactor Building.
One hundred feet of coiled cable (#TD1328I) is included with this RTD.
Uncoil the cable and bring the RTD to elevation 367'-4", coordinates N+16', E+44'.
At this point, disconnect the RTD from the cable.
Install a five terminal junction box to a local handrail and terminate cable #TI1328I to it.
To the other side of the terminals in the junction box, terminate a 100 foot length of 4 conductor, #14AWG cable with a FR-15EE jacket.
To the other end of the neu 100 foot cable, reconnect the RTD.
Attach a steel cable to the RTD on the floor of Steam Generator B cavity
'"D" Ring),
elevation 281'-6".
Place the RTD on s.e floor inside the Steam Generator support skirt.
3.
RTD #LR-TE-4150 is enclosed in a box at elevation 347',
cootiinates N+23', E+48', within the Reactor Building.
One hundred feet of coiled cable (#IT1329I) is included with this RTD.
Uncoil the cable and bring the RTD to coordinates N+19', E+11'. elevation 350' in the Reactor Building.
Place the RTD on the control rod drive cables and secure it (steel cable) to prevent it from moving.
205 305
~
4.
RTD #LR-TE-4151 is enclosed in a box at elevation 347'.
coordinates S+4', E+43' within the Reactor Building.
One hundred feet of coiled cabl- (#TD1330I) is included with this RTD.
Uncoil the cable and bring the RTD to coordi-nates N+15', E+17' at elevation 367'-4".
Fasten one end of a steel cable to a loc:1 hand' call and the other end of the steel cal'e to the RTD.
Lower the RTD about 15 feet into the Ste.
Generator B acvity
("0" Ring) and tie off the steel cable at that eltvation.
5.
RTD #LR-TE-4132 is enc 1rsed in a box at elavation 347',
coordinates S+4',
W+47 tit.iir She Reactor Building.
One hundred feet of coiled cable u D1331I) is included with this RTD.
Uncoil the cable anc bring the RTD to coordi-nates N+16', W+50' at elevation 370'-4".
At this point, disconnect the RTD from the cable.
Install a five termi-nal junction box to a local handrail and terminate the cable #TD1331I to it.
To the other side of the terminals o the junction box, terminate a 100 fact length of 4 conductor #14 AWG cable with a FR-15EE jacket.
To the other end of the new 100 foot ccble, reconnect the RTD.
Attach a steel cable to the RTD and lower the RTD to the floor of the Steam Generator B cavity
("D" Ring) elevation 281'-6".
Place the RTD on the floor inside the Steam Generator support skirt.
6.
RTD #LR-TE-4153 is enclosed in a box at elevation 347',
coordinates N+29', W+48' within the Reactor Building.
One hundred feet of coiled cable (#TD1332I) is included with this RTD.
Uncoil the cable and bring the RTD to coordinates N+18', W+16' at elevation 367'-4".
Fasten one end of a steel cable to a local handrail and the other end of the steel cable to the RTD.
Lower the RTD about 15 feet into the Steam Generator B cavity
("D" Ring) and tie off the steel cable at that elevation.
7.
After the Hot Functional Test has been completed, return all the RTDs to their original locations by follcwing instructions 1 through 6 in reverse order.
BILL OF MATERIAL 1.
Three (3) - 100 feet length of 4 conductor, 14 AWG cable with a FR-15EE jacket.
2.
Tliree (3) - Junction boxes 3.
Three (3) - 5 point states-type ZUM terminal blocks to be installed inside junction boxes.
4.
400 feet of braided steel messenger cable (approximately 1/4" in diameter).
- All new materials supplied for Hot Functional Test are shown abcVe.
After the test, these materials are not required any-where and should be stored in the warehouse.
1 205 3n7
a a unua:.1 a
SAMPLE DATA SHEE SHEET 1 OF 2--
TEMPERATURE AND HUMIDITY RECORDING DATA 1
FOR HOT FUNCTIONAL TESTING THREE MILE ISLAND NUCLEAR STATION UNIT #2 REACTOR BUILDING RTD LOCATION TEMPERATURE (F)
TAG #
(READ ON PANEL 25 TIME (DATE
)
IN CONTROL ROOM)
AH-TE-503.0 Sump Pump Area AH-TE-50ll Let Down Cooler Area AH-TE-5012 R.C. Drain Tank Area AH-TE-5013 Impringement 3arrier Area AH-TE-5014 EL. 305'-0" AH-TE-5015 Supply Air Duct from R.B.
Cooling Unit AH-TE-5016 Primary Shield Concrete AH-TE-5017 Primary Shield Concrete AH-TE-5020 R.B. Dome AH-TE-5021 R.B. Dome AH-TE-5022 EL. 330'-1" AH-TE-5023 EL. 330'-1" AH-TE-5027 Supply Air Duct from R.B.
Cooling Unit AH-TE-5088 EL. 305'-0" HUMIDITY LOCATION HUMIDITY (% R.H.)
ELEMENT TAG #
AH-HE-5032 R.B. Ambient 4
i AH-HE-5090 R.B. Ambient l
I l
205 308
ATTACHMEN1 #2 SAMPLE DATA SHEE SHEET 2 OF 2 TEMPERATURE AND HUMIDITY RECORDING DATA FOR HOT FUNCTIONAL TESTING THREE MILE ISLAND NUCLEAR STATION UNIT # 2 REACTOR BUILDING TEMPERATURE (F)
RTD LOCATION TIME (DATE
)
TAG #
(READ ON PANEL 25
.Ta CONTROL ROOM)
LR-TE-4139 Air Intake To R.B.
Fans LR-TE-4148 Reactor Vessel Cavity at EL.
305'-0" LR-TE-4149 Steam Gener. B Support Skirt LR-TE-4150 Reactor Vessel CRD Cable Area LR-TE-4151 Steam Gener. B "D" Ring (EL. 360')
LR-TE-4152 Steam Gener. A.
Support Skirt LR-TE-4153 Steam Gener. A "D" Ring (EL. 360')
NOTE:
Readings are to be taken at 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> intervals for a 3 day period.
If temperature readings have not stabilized at the end of the 3 day period, continue readings until 4 consecutive readings indicate temperature stabilization.
Data shall be returned to Burns and Roe, Inc., Three Mile Island Nuclear Station No.2 Project, 29 Park Place, Paramus New Jersey, to the attention of Mr.
R. A.
Podesfinski.
205 309 5