Operating Procedure 2104-6.3,Revision 4:emergency Feedwater
ML19224B233
Person / Time
Site: Crane Constellation icon.png
Issue date: 06/08/1978
From:
Metropolitan Edison Co
To: Mullinix W
NRC/IE
References
2104-6.3, TM-0020, TM-20, NUDOCS 7906140266
Download: ML19224B233 (13)


Text

-

w..

TMI DOCLurrs "h

DO GMENT NO:

COPY MADE ON hN OF DOCUMENT PROVIDED BY

/'/

METROPOLITAN EDISON COMPAITI.

Wilda R. Mullinix,.NRC am

.j 7 9 0 614 o ggg 193 260

2104-6.3

~

CONIF.TJL'.7y

&*ni gi

~

4

.CchI!!AL

= n y,

r THREE MILE ISLCLE AR STATION UNIT #2 CIERACEDURE 2104-6.3 EMERG0 WATER Table ce Pages

Page, Date Revision Pace Revision Pace Date Revision 1.0 04/05/77 0

26.0 51.0 2.0 04/05/77 0

27.0 52.0 3.0 04/05/77 0

28.0 53.0 4.0 04/12/78 3

29.0 54.0 5.0 04/12/78 3

30.0 55.0 6.0 09/16/77 1

31.0 56.0 7.0 04/05/77 0

32.0 57.0 8.0 04/05/77 0

33.0 58.0 9.0 06/08/78 4

34.0 59.0 10.0 06/08/78 4

35.0 60.0 11.0 06/08/78 4

36.0 61.0 12.0 04/05/77 0

37.0 62.0 13.0 38.0 63.0 14.0 39.0 64.0 15.0 40.0 65.0 16.0 41.0 66.0 17.0 42.0 67.0 18.0 43.0 68.0 19.0 44.0 69.0

\\

20.0 45.0 70.0 21.0 46.0 71.0 22.0 47.0 72.0 23.0 48.0 73.0 24.0 49.0 74.0 25.0 50.0 75.0 Unit 1 Staff Recommends Approval Jnit 2 Staff Recommends Approval Approval b

/V Date

~

Date Approval Cognizent De;:t. Head Cognizant Dent. Head Unit 1 PORC Recommends Approval Init 2 CR o mends Approval Date

/

Date O

/

Chairman of PORC

-r an of PORC

-j Unit 1 Superintendent Approval Jnit 2 uperintendent Approval Y

Date j /

YV Date b S

r' O

//

Manager Generation Quality Assurance Approval 8M Dake

~

T MI 55. A R ev 8 /77

sq 2104-6.3

.x Revision 0 (I

'L 04/05/77 APR : 3 ;yy THREE MILE ISLAND NUCLEAR STATION UNIT #2 OPERATING PROCEDURE 104-6.3 EMERGENCY FEEDWATER Table of Contents SECTION PAGE

1.0 REFERENCES

2.0 1.1 Drawings Applicable for Operation 2.0 1.2 Operating Procedures Applicable for Operations 2.0 1.3 Manufacturers' Instruction Manuals 2.0 1.4 Applicable System Descriptions 2.0 1.5. Curves, Tables, etc.

2.0 2.0 LIMITS AND PRECAUTIONS 2.0 2.1 Equipment 2.0 2.2 Administrative 3.0 3.0 PRERECUISITES 4.0 4.0 PROCEDURE 6.0

[93 262 1.0

.g i

~

2104-6.3 Revision 0 f

04/05/77 APR 2 3 THREE MILE ISLATID fiUCLEAR STATION

~

UNIT #2 OPERATING PROCEDURE 2104-6.3 EMERGENCY FEEDWATER

1.0 REFERENCES

1.1 Orawings Applicable for Opera. tion.

1.1.1 Burns and Roe Flow Diagrams.

1.1.1.1 Main and Reheat Steam, B'2R Drawing No. 2002.

1.1.1.2 Auxiliary Steam, B&R Drawing No. 2004.

i.l.l.3 Feedwater and Condensate, B&R Drawing No. 2005.

1.2 Operating Procedures Applicable for Operation.

1.2.1 2102-l.1, Unit Heatup.

1.2.2 2102-3.1, Uni t Shutdown.

1.2.3 2106-1.1, Main and Reheat Steam.

1.2.4 2106-1.3, Auxiliary Steam.

1.2.5 2202-2.2, Loss of S. G. Feed.

1.2.6 2106-2.4, Feedwater.

1.2.7 2106-2.1, Condensate.

1.3 Manufacturers' Instruction Manuals.

1.3.1 Ingersoll-Rand Pump Manual (B&R File No. 42).

1.4 System Descriptions.

1.4.1 Main and Reheat Steam, Index No. 1.

1.4.2 Auxiliary Steam, Index No. 3.

1.4.3 Feedwater and Condensate, Index flo. 4A.

1.5 Curves, Tables, etc.

None.

2.0 LIMIT 3 AND PRECAUTIONS 2.1 Equipment.

193 263 2.0

Y r

2104-6.3 i"

Revision 0 04/05/77

'l APR 2 3

  1. 3'S -

2.1.1 To prevent damage to pumps, insure that each pump recirculation path to the condenser or condensate storage tank is lined up when system is in standby.

2.1.2 NR-V-27A and B (Nuclear Services River Water to EFP Suction Header are normally locked closed with breakers open, and will be opened only when all other sources of water have been exhausted.

2.1.3 When returning system to standby after maintenance or extended shutdown, thoroughly vent each pump.

2.1.4 Oil should always be visible in the glass bottle on the constant level oilers on the pumps.

2.2 Adminis trative.

2.2.1 The emergency feed pumps will not be used to replace a main feed pump for normai operation.

2.2.2 The Emergency Feedwater Pumps will be put into standby, during a unit heatup, after the first main feedwater pump has been placed in service, and EF-VilA and 8 placed in AUTO per 2102-1.1.

2.2.3 The maximum allowable number of cycles of the auxiliary feedwater nozzles in the OTSG is 80 for 80 F feedwater and 40 cycles fo.-

40 F feedwater.

2.2.4 During unit shutdown, prior to tripping the second main feedwater, the Emergency Feedwater Pumps control switches must be placed in PULL-TO-LCCK to prevent inadverent actuation.

2.2.5 Insure the emergency t:ip for EF-U-l is reset for emergency

-j sta.1dby operation.

3.0 193 264

~

2104-6.3 E.

Revision 3 04/12/78

('

2.2.6 During startup, prior to entering Mode 3 per Tech. Spec.

APR 3 793 3.7.1.2 all three Emergency feedwater pumps and their associated flow paths must be OPERABLE.

If one of the emergency feedwater pump systems are declared INOPERABLE, comply with action statement 3.7.1.2.a of the Tech. Specs.

2.2.7 With 'ow through the emergency feed nozzles, there is a possibility i

of Water accumulation in the OTSG steam annulus space and the steam lines. After flow through 'he E F header has stopped, insure the steam annulus space, and the MS lines are drained prior to startup.

3.0 PREREOUISITES Initial Each Step upon satisfactory completion.

3.1 VERIFY Instrument Air system is lined up for normal operation per 2104-2.3 and air is available to system valves.

3.2 PLACE the following control switches on Panel 4 in PULL-TO-LOCK, 2A Emergency Feed Pump, 2B Emergency Feed Pump, Steam Driven Emergency Feed Pump (MS-V207), Steam from 2A Generator to Emergency Feed Pump Turbine (MS-VilA), nd Steam from 23 Generator to Emergency Feed Pump Turbine (MS-VllB).

3.3 On the 4160V ESF BUS 2-lE, PLACE the brea'<er for EF-P-2A in the PACKED-IN position.

3.4 On the 4160V ESF BUS 2-2E, PLACE the breaker for EF-P-2B in the RACKED-IN position.

3.5 On the following 480V control centers, INSURE that the designated equipment manual brekaers are CLOSED.

VALVE MCC UNIT EF-V4A 2-llA 98R EF-V4B 2-21EA 13CF 193 265

^

4.0 e

(,,

2104-6.3 "evi..icn 3 04/12//8

~

EF-12A 2-llEA 13CF c.F-V12B 2-21 EA 140R EF-V32A 2-llEA ll8R EF-V328 2-21EA llCR EF-V33A 2-21EA 12CR

/

EF-V33B-2-11EA 12BR AS-V10 2-32B 5AF C0-V87 P-il EB 1CR 36 IflSURE that NR-V27A and B are CLOSED then 0 PEN and lock the respective circuit breakers.

VALVE VALVE POSITION MCC ~

UNIT BREAKER POSITION NR-V27A CLOSED 2-32A 98R OPEN NR-V278 CLOSED 2-42A 6AF OPEN 3.7 On the 250/125 VDC distribution system CLOSE the following switches:

~

VALVE /E0VIPMENT DC PANEL SWITCH EF-VSA DCA-1A No. 24 EF VSB DCA-2A No. 24 MS-VilA DCC-1A No. 14 MS-Vil3 DCC-1A No. 11 MS-V207 DCC-1A No. 9 Ca bi ne..

163 DCC-1B No. 2 Cabinet 164 DCC-28 No. 2 Cabinet 163 DCT-1A No. 6 3.8 At Cabinet 163 Distribution Panels, CLOSE the following circuit breakers:

2d6 5.0

Q 2104-6.3 Revision 1 9

09/16/77 EOUIPMEflT PANEL VOLTAGE CXT NO.

ApR 2 3 g RCP/TG & RCP/T

  1. 1 125 VDC
  1. 1 R6
  1. 4 120 VAC
  1. 2 RCPTX/T
  1. 2 125 VDC
  1. 2 EF-V26
  1. 4 120 VAC

!3 EF-V27A

  1. 4 120 VAC
  1. 5 3.9 At Cabinet 164 Distribution Panels, CLOSE the following circuit breakers:

EQUIPMENT PANEL VOLTAGE CKT fl0.

RCPTX/TG

  1. 3 125 VDC
  1. 4 EF-V278
  1. 2 120 VAC

!5 3.10 CC"PLETE valve lin~e-up per APPENDIX A ard sign-off valve line-up complete in APPEllDIX B.

3.11 Insure that the system is filled and vented.

4.0 PROCEDURE Initial Each Step Upon Satisfactory Completion.

4.1 Aligning Emergency Feedwater during Unit Heatup.

4.1.1 After the first main feedwater pump has been put into service per 2102-1.1, Unit Heatup, PLACE the following control switches in NORMAL AFTER STOP:

2A Emergency Feed Pump (EF-P-2A), 28 Emergency Feed Pump (EF-P-23), Steam Driven Emergency Feed Pump (tis-V207),

Steam from 2A Generator to Emergency Feed Pump Turbine (MS-VilA), and Steam from 2B Generator to Emergency Feed

]

Pump Turbine (MS-VilB). The system is now aligned for

~

standby operation.

6.0 193 267

2104-6.3 g

~

Revision 0 0

04/05/77 APR 2 3 1379 NOTE:

Valve line-up has a recire path to the Condensate Storage Tank, CO-T-1A.

If a recirc path to the Condenser is desired complete step 4.1.2 and 4.1.3 per Shift Supervisc. /Shif t Foreman instructions.

4.1.2 CLOSE EF-V8A, B and C using the control switches on Panel 4.

4.1.3 OPEN EF-V7A, B and C using the control switches on Panel 4.

4.2 Disabling Emergency Feedwater during Unit Shutdown.

4.2.1 Prior to taking the seccnd main feedwater pump out of service per 2103-3.1, Unit Shutdown, PLACE the folicwing control switches on Panel 4 in PULL-TO-LOCX:

2A Emergency Feed Pump (EF-P-2A), 2B E..lergency Feed Pump (EF-P-28), Steam Driven Emergency Feed Pump (MS-V2G7),

Steam from 2A Generator to Emergency Feed Pump Turbine (MS-VilA), and Steam from 2B Generator to Emergency Feed Pump Turbine (MS-V118), and proceec wi ch Unit Cooldown.

4.3 Special and Infrequent Operations.

4.3.1 Using luxiliary Steam for the Turbine Driven Emergency Feedwater Pump.

NOTE:

If it becomes necessary to run the Turbine (; riven Emergency Feedwater Pump on Aux. Stea.a perform the following steps:

4.3.1.1 INSURE that Auxiliary Steam is available per 2106-1.3, and steam is available at AS-V10.

NOTE:

If the Aux Steam lir.e is already warmed by Main

'l Steam then 90 to step 4.3.1.5.

7.0 10'4 e68 6

.-/

M%3 WS 2104-6.3 Revisi 04/05/ac 0

/7 4.3.1.2 OPEN MS-V65, and dripleg valve', MS-V309 and MS-V314.

~

i 4.3.1.3 SLGJLY OPEN AS-V218 (AS-V10 Bypo s valve) and BLOWDOWN f

the Aux steam inlet to EF-P-1 fer 5 minutes.

i 4.3.1.4 CLOSE MS-V314 and MS-V309.

4.3.1.5 OPEN AS-V10 using the control switch on Panel 17 to provide Aux Steam.to EF-P-1.

4.3.1.6 CLOSE AS-V218 (AS-V10 Bypass Valve).

t 8.0 193 269

~

/#

2104-6.3 Revision 4 06/08/78 jf ( j V

APPENnIX A V

APR 2 3 g379 Valve Line-Up Valve No.

Descri ption Position Initials EF-V3A EF-P-2A Discharge Pressure Inst.

OP EF-V3B EF-P-2B Discha:ge Pressure Inst.

OP EF-V3C EF-P-1 Discharge Pressure Inst.

OF EF-V4A EF-P-2A Discharge Isolation Vaive OP EF-V4B EF-P-28 Discharge Isolation Valve OP EF-V5A EF-P-1 Discharge to RC-H-1 A OP EF-V5B EF-P-1 Discharge to RC-H-18 OP EF-V7A EF-P-2A Recirc to Condenser CL EF-V7B EF-P-2B Recirc to Condenser CL EF-V7C EF-P-1 Recirc to Condenser CL EF-V8A EF-P-2A Recirc to CO-T-1A OP EF-V8B EF-P-2B Recirc to CO-T-1A OP EF-V8C EF-P-1 Recirc to CO-T-1A OP EF-V9 EF-P-1, 2A and B Inlet to C0-T-1 A OP EF-V10 EF-P-1 Discharge Isolation Valve LO EF-V12A Em. Feedwater to RC-H-1A OP EF-V128 Em. Feedwater to RC-H-1B OP Wired & Sealed EF-V14A "A" Em. Feedwater to RC-H-1 A Drain CL Wired & Sealed EF-V14B "B" Em. Feedwater to RC-H-1B Drain CL EF-V15A "A" Em. Feedwater to RC-H-iA Drain CL EF-V15B "B" Em. Feedwater to RC-H-1B Drain CL EF-V16 Em. Feedwater Pump Disc. Head. Dr.

CL EF-Vl7 Em. Feedwater Pump Disc. Head. Dr.

CL 193 270 9.0 1

2104-6.3

//

Revision 4 06/08/78 r

APPENDIX _A_

Valve Line-Up APR 2 3 9 79 Valve f;a.

Descrioti on Position Initials EF-V18 EF-P-1 Discharge Vent CL l

~

EF-Vl9 EF-P-2 Discharge Vent CL EF-V20 EF-U-l Bearing Inlet Test Conn.

CL EF-V21 EF-U-l Bea

.',g Outlet Test Conn.

CL EF-V22 EF-P-1 Be 2 ring Outlet Test Conn.

CL EF-V23A EF-P-2A dearing Inlet Test Conn.

CL EF-V238 EF-P-2B Bearing Inlet Test Conn.

CL EF-V24A EF-P-2A Bearing Outlet Test Conn.

CL EF-V248 EF-P-2B Bearing Outlet Test Conn.

CL F'-V25 EF-U-1 Bearing Drain OP EF-V28 EF-U-l Bearing Inlet Isolation OP EF-V2.9A EF-P-2A Bearing Inlet Isolation OP EF-V298 EF-P-28 Bearing Inlet Isolation OP EF-V30 EF-P-1 Bearing Outlet Drain OP EF-V3 4 EF-P-2A Bearing Outlet Drain OP EF-V31B L. -P-28 Bearing Outlet Drain OP EF-V32A EF-V12A Bypass CL EF-V32B EF-V128 Bypass CL EF-V33A EF-VilA Bypass CL EF-V33B EF-VilB Bypass CL C0-V125 Suction to EF-P-1 L0 C0-V82A C0 Storage Tanks to EF LO C0-V82B C0 Storage Tanks to EF LO 193 271 oo

2104-6.3

/

Revision 4

~

l g/

C6/08/78 R

APPENDIX A

'379 Valve Line-Up Valve tio.

Des cri pti c, Position Ini ti al s CO-V85 Condensate to EF L0 CO-V87 EF Pump Suction Header Isolate OP C0-V83A EF-P-2A Suction L0 C0-V838 EF-P-2B Suction L0 CO-V98A CO-T-1A Isolation LO C0-V988 CO-T-1B Isolation LO EF-V38 EF-P-1 Recire. Line Min. Flow Orifice Bypass LC EF-V39 EF-P-2A Recirc. Line Min. Flow Orifice Bypass LC EF-V40 EF-P-28 Recire. Line Min. Flow Orifice Bypass LC EF-V-36 F to SG B DRN.

CL EF-V-37 FW to SG B DRN CL EF-V-501 EF-PI 2001 Isol OP EF-V-502 EF-PT 1150 Isol OP EF-V-503 Inst DRN CL EF-IV-504 EF-PI 2002 Isol OP EF-IV-505 EF-PT 1147 Isol OP EF-IV-506 Inst DRN CL EF-IV-507 EF-PI 2003 Isol 0F EF-IV-508 EF-PT 826 OP EF-IV-509 Inst DRN CL e

193 272 G

e

... jj 2104-6.3

~ ' '

Revision 0 i

04/05/77 V

APPENDIX B Signatures c those perfaming/ supervising valve line-up Valve Line-up Signature Sheet Operator Operator Shift Foreman or' Initials Sicnature Shift Da te Suoervisor Sic.

Remarks i

I 1

l 193 273

.