ML19224B111

From kanterella
Jump to navigation Jump to search
Discusses Data Reduction & Mgt Group Objectives Re TMI Recovery
ML19224B111
Person / Time
Site: Crane Constellation icon.png
Issue date: 04/09/1979
From: Long R, Arnold R
Metropolitan Edison Co
To: Mullinix W
NRC/IE
References
OSP-790409, TM-0065, TM-65, NUDOCS 7906140059
Download: ML19224B111 (4)


Text

_

~

TMI DOCU3ENTS DOCU>ENT NO:

//~

COPY MADE ON

/) ((

OF DOCDENT PROVIDED BY

/ /

METROPOLITAN EDISON COMPANY.

f.

'k Wilda R. Mullinix, NRC 7906140059 j

187 009 O

e

/u /r 7 "' Y s -

~

TMI 31 METROPOLITAN ED! SON COMPANY

~

uu,,, a c.

,o %,; o,,a,, c,,

SuNect Data Reduction and :'.anagerent Group locMian IIif D,e April 9, 1979 To Tli hcovery Task Force A Data "edoction and "rngm at Gcoup has b en es t:bl!.;b. d.

'h e o'a j e c t is e a of the Craup are-1 To collect and file f.n a sin;1e location all plaat dita, doct ents, procedures, analyses, etc. relative to the T:li 92 incident.

2.

To provide reduction of this data into convenient summary fornats for use in plant analyses, procedure preparation, design of plant modifications, etc.

3.

To distribute periodic reports listing the information available and updating plant parameter histories.

4.

To serve as a distribution center to all on-site and off-site t sers of information from the TMI J2 incident.

E f fective inmediately it will be the responsibility of the doctment originator to provide a copy of each doc =ent generated, along with the following infomation for each document, to the Data Reduction &

Management Group (DRMG):

- Originator's name or Group identification.

- Doctment type.

- Date of doctaen*

- 1 or 2 keywords identifying the document.

This information should be annotated on the document or on an attached cover sheet, as appropriate.

A preliminary list of the types of information to be collected is included as Attachment A.

Initially, copies of all documents and information generated since the incident should be submitted.

Then submittals should continue on a daily basis.

Document collection baskets will be located in each trailer.

A messenr r will pick up doctuents from the collection points 4 times a day for delivery to the DRMG.

After reduction of the data has been completed, 1 copy of the doctmenta-tion will be filed in the DRMG, Trailar #26. Anyone requiring information from these files may visit the trailor or call 233-90'+ 5, ext. 170 or 171 i

i 187 010 INTER-OFFir,E MEr.10 R ANDUM

hY-2/-

^M TMI Recovery Task Force April 9, 1979 A report of file contents wili ac published on a regular basis.

A copy of the.eporr aill be distributed and sill be a"ailable in Trailer 26 If you have q ue t; t io n:; or aced au ;istance, plea: e call R.

T. s a g o r J. ' ois : r en 2 3 3 - 9 0'> 5,. : t. 170 or 171 or on 337-3676.

/)l~ (GWR. -

d) fd -Ci, ~'u i

Robert L. Lo? [

l'a na ge r, DPJ. /

i lf ik Approved By:

_ N',

l' '

R. C. Arnold GPU Cperations l'anager Dis tribution:

B. Cobean J. Herbein

~

=

M. Levenson R. Matson F. Pal:ner R. Paulick V. Stello F. Stern R. Wilson e3 187 011 e

e

aGW U-Zl li -

ATTACR WTr /.

PRELE!INARY LIST OF I:;FOR:nTIO:i TO EE COTJ"CTED 1

Control Roc 2 Data, including such i tems as:

a.

CR0 Lcgbook b.

Aux. operator logsheets c.

Che= Leal analysis (all sa=ple results) d.

HP Radiation / Contamination Survey's e.

Radiocherdcal Analysis (all cacple results) f.

Recorder Charts (all) g.

CRO logsheets h.

Alarm typewriter print out i.

Relay Operations Reports 2.

On-site Air and Water Sa=ple Analyses 3.

On-site Radiation Level Survey Histories 4

Reports and Analyses Generated by Contractors (On and off-site)

  • 5.

Reports and Analyses Generated by All Recovery Team Working Groups

  • 6.

All Approved Plant Operations / Maintenance Procedures.

7.

All Plant Construction / Modification Drawings, Diagrams, etc.

8.

All Covern=ent Agency Reports / Analyses and Data (where available) 5 f

9.

Press Releases,

  • This includes correspondence containing data analyses results.

187 012 e

e

If v r :

METROPOLITAN EDISON COMPANY

~

u..,, c, c m.,,, e,nc u,,a. s c >,m

, m.c,

Subject Three Mile Island Recovery Data Eeduction &

TMk Location Fanagement Group Data Tr.namittal Cover Sheet A ril 9, 1979 Cate P

To Daua naduction Panagement Group itta? ed For Pernunent Filing:

Title or Description of Docurent:

Key Words for Indexing:

Originator or Group Name:

Organizat..on:

Location (Trailer 5, Etc.):

1 hone:

Datc:

Time:

!i 187 013 INTER-OFFICE MEMORAt'DUM

.