9

'I

~

TMI DOCDENTS

!~[

DOCUMENT NO:

COPY MADE ON

//

OF DOCUMENT PROVIDED BY METROPOLITAN EDISON COMPANY.

Wilda R. Mullinix, NRC 7906140043 96 254 i

.UUNih0L_ED CCFY MisBl> 2 CEGA E_E

=

THREE MILE ISLAND NUCLE AR STATION UNIT #2 OPERATIt1G PROCEDURE 2104-5.7 DIESEL BUILDIt;G HEATIrlG AND VENTILATI0tl Table of Ef fective Pages P ce Date Revision Page Date Revision Page Date R evision 2

1.0 03/16/77 1

26.0 51.0 2.0 09/22/78 2

27.0 52.0 3.0 09/22/78 2

28.0 53.0 4.0 09/22/78 2

29.0 54.0 5.0 09/22/78 2

30.0 55.0 6.0 31.0 56.0 7.0 32.0 57.0 8.0 33.0 58.0 9.0 34.0 59.0 10.0 35.0 60.0 11.0 36.0 61.0 12.0 37.0 62.0 13.0 38.0 63.0 14.0 39.0 64.0 15.0 40.0 65.0 16.0 41.0 66.0 17.0 42.0 67.0 1

18.0 43.0 68.0 19.0 44.0 69.0 20.0 45.0 70.0 21.0 46.0 71.0 22.0 47.0 72.0 23.0 48.0 73.0 24.0 49.0 74.0 25.0 50.0 75.0 Unit 1 Staff Recommends Approval Unit 2 Staff Recommends Approval d/

Date

[

Date Approval Approval Cognizant Dept. Head Cognizant Dept. Head Unit 1 PORC Recommends Approval Unit 2 POPC Recommends Approval 75 Y

~

' 'Y r - r b Date Date Chairrnan of PORC

/i Chairman of PORC Unit 1 Superintendent Approval Unit 2 Supe.rint ndent Approval ff/

Dau

' A %)L{

Date f,,

h V'

g'

'I J

Manager Generation Quality Assurance Approval

/l/

1 O Qaten r 'i IUU LJJ T P.*l 55 A H ow 8 /7 7 - a W

ex,.s.un i

08/16/77 THREE MILE ISLAND NUCLEAR STATION UNIT #2 OPERATING PROCEDURE 2104-5.7 Diesel Building Heating and Ventilation TABLE OF CONTENTS' Page

1.0 REFERENCES

2.0 2.0 LIMITS AND PRECAUTIONS 2.0 3.0 PREREQUISITES 2.0 4.0 PROCEDURE 3.0 4.1 Startup 3.0 4.2 Normal Operations 4.0 4.3 Sht:tdown 5.0 4.4 Special or Infrequent Operations 5.0 1.0 186 256 e

e

._, c./

m Revision 2 09/22/78 o

fHREE MILE ISLAND NUCLEAR STATION UNIT #2 OPERATING PROCEDURE 2104-5.7 Diesel Building Heating and Ventilation 1.0 REFERENCJS 1.1 Drawings Applicable for Operation.

1.1.1 Emergency D.G. Building H&V, B&R #2049.

1.2 Operating Procedures Applicable for Operation.

1.2.1 2104-2.3, Instrument Air 1.3 Manufacturer's Instruction Manuals.

1.3.1 Buffalo Forge Manual B&R File #63.05 - Fan 1.3.2 Chromalox Manual B&R File #63.19 - Hea ters 1.4 System Descriptions.

1.4.1 H&V Emergency [ esel Generator Building, (Index No. 46).

2.0 LIMITS AND PRECAUTIONS 2.1 Hearing protection may be required if entering Diesel Generator Building during diesel operation.

3.0 PREREQUISITES 3.1 A Unit Initial each step.

3.1.1 Check power available to 430V Bus 2-llE and breaker FA-2 closed, (Fan AH-E-50A).

3.1.2 Check power available to MCC 2-llEC and breakers l AF and 2EF closed, (Fans AH-E24A and AH-E51 A).

3.1.1 Check power available to MCC 2-46A and the following breakers are closed:

2 Unit 1FR Heater AH-C-31 A Diesel Generator Basement 186 257

,_o o

O e

6

a.

,-u.i Revision 2 09/22/78

_ Unit 2CF Heater AH-C28A A Diesel Generator Room Unit lEF Heater AH-C-29 A Diesel Generator Room 3.2 B Unit.

3.2.1 Check power available to 480 V Bus 2-21E and breaker FB2 closed AH-E-508.

3.2.2 Check power available to MCC 2-21EC and breakers 2AF and lEF closed. (Fans AH-E-24B and AH-E-SlB).

3.2.3 Check power available to MCC 2-46A and the following breakers closed:

Unit lDR Heater AH-C-30 B Diesel Gencrator Basement Unit 2DR Heater AH-C-288 B Diesel Cenerator Room Unit 2EF Heater AH-C-28C B Diesel Generator Room 4.0 PROCEDURE NOTE:

The following steps can be used to start either the A or B emergency diesel generator building systems.

4.1 Startup.

Initial each step.

4.1.1 Check that local pneumatic thermostats listed below are set for their appropriate values:

Thermostat Location Setting AH-TS-5581 A Switchgear Room 100 F AH-TS-5830 A Diesel Generator Room 100 F AH-TS-5605 A Diesel Generator Room 90 F AH-TS-5593 B Switchgear Room 100 F AH-TS-5831 B Diesel Generaty-Room 100 F 2

U 0

AH-TS-5592 8 Diesel Generator Room 90 F 3.0

-b

c i u -, - a. /

Revision 2 09/22/78 4.1.2 Verify each unit heater listed below is in service by setting the thermostat to 60 F:

Heater _

Location Thermos ta t_

AH-C-28A A Diesel Generator ?oom AH-TS -5598 AH-C-29 A Diesel Generator Room AH-TS-5597 AH-C-31 A Diesel Generator Basement AH-1S-5577 Storage Area AH-C-288 B Diesel Generator Room AH-TS -5596 AH-C-28C B Diesel Generator Room AH-TS -5595 AH-C-30 B Diesel Generator Basement AH-TS -5585 Storage Area 4.1.3 At control panel 25, piace the START-STOP-AUTO switch for fans AH-E-51 A/B and AH-E-24A(B) in AUTO.

If the diesel building air temperature is below 100 F, AP-E-24A(B) will start and air j

flow will be indicated on control panel AH-E51 A(B) will start U

if the diesel swgr. room _> 100 F and air flow will be indicated on panel 25.

4.1.4 Also at control panel 25, place the AUTO-STOP switch for AH-E50A(B) in AUTO.

AH-E-50A(B) will start if the diesel bkr. is closed, AH-E-24A(B) is not running, and diesel gen building U

temp _>,100 F.

4.2 Normal Operation.

4.2.1 AH-E-24A(B) and AH-E51 A(B) supply fresh or recirculated air to their respective areas to maintain temperature no higher than 104 F.

AH-E-24A(B) runs continuously and AH-E-Sl A(B) starts 2

automatically w!,en either thermostat senses temperature above U

100 F.

Fan operation, air flow and building air temperatures are indicated at main control panel 25.

186 259 4.0 m

e

_e

c!U1 -J./

Revision 2 09/22/78

{

System heaters will respono to their respective local thermostats to maintain building temperature at about 60 F during cold weather.

4.2.2 AH-E-50A(B) will not be running during normal operati:iis.

4.3 Shutdown.

4.3.1 Normally, AH-E-51A(B) shuts down automatically.when the air temperature in the diesel generator switchgear rooms goes below 100 F.

AH-E-24A(B) rhuts down when disel gen.

0 bldg. temp is 3,100 F.

AH-E-24A(B) and AH-E-51 A(B) may also be shut down by setting the START-STOP-AUTO switch on panel 25 to STOP.

4.3.2 The electric unit heaters are shut down by turning the local thermostat selector switch to 0FF.

3 4.3.3 AH-E-50A(B) is shutdown by placing its AUTO-STOP switch on panel 25 in STOP.

4.4 Special or Infrequent Operation.

4.4.1 If the building fire detection system is actuated, AH-E-24A(B) and AH-E-51 A(B) shut down and the intake dampers close.

4.4.2 AH-E-50A(B) will start if the diesel generator bkr. is closed and AH-E-24A(B) is not running (or fails) and diesel generator U

building temperature 3,100 F.

U 4.4.3 If the diesel gen. buildings temperatures exceed 10C F when the diesel gen bkr. is not closed, either AH-E-24A(B) or AH-E-50A(B) should be started manually.

Once the temperature drops back below 100 F, AH-E-24A(B) will run automatically.

l 5.0 186 260