ML19224A870
| ML19224A870 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 05/15/1979 |
| From: | Geoffrey Miller Metropolitan Edison Co |
| To: | Collins P Office of Nuclear Reactor Regulation |
| References | |
| CON-NRC79-23 NRC79-23, NUDOCS 7906070150 | |
| Download: ML19224A870 (1) | |
Text
...
tiRC7 9-23 f.- @c
- TyM_]
J
~
PCe*f 4 PM
'JE
/
METROPOLITAN EDlSON COMPANY
~s.
-u-'.
POST OFFICE SOX 450 M!C D LETOW N. P EN NSYLV A N 't.
17C57 TEL' P HONE 717-9M 4041 flay 15,1979 Director of Operator Licensirig Attn:
Mr. Paul F. Collins U.S. Nuclear Regulatory Cornission Washington, D.C.
20555
Dear Sir:
Three flile Island Nuclear Station Units I and II Docket ?!as. 50-239 and 50-320 License Nos. DPR-50 and DPR-73 Licensed Operator Requalification Training Progran This letter is to confirm telecon this date with Jerry Holman/f tarshall Beers.
The T !I Trainina Department intends to resume the Licensed Operator Requalifi-cation Progran on May 21, 1979.
This is independent of the " Accelerated Requalification Pronram" (Reference flRC 79-20) and a detailed outline for that progran is forthconing.
Sincerely, i
n n,o i
Manager - Generatina Statf or *:cclear
'iP:!/"LD/d rg cc:
J. L. Seelinger P-U Zechman K
I' T0rni5 D. 2 E C ' '. Z t.
E, uc"
169 067 SOGO7orgo
<