ML19224A824
| ML19224A824 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 05/18/1979 |
| From: | Herbein J Metropolitan Edison Co |
| To: | Stello V Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML19224A825 | List: |
| References | |
| GQL-0697, GQL-697, NUDOCS 7906010213 | |
| Download: ML19224A824 (1) | |
Text
.
a.
g e.
Metropolitan Edison Company 1 lf lpaiji f,'
)_
4 --; -grn; v3~
],
f V
=
=: -
z w
(
q
.~7_,_
- c.
-.;y,
%.m,,. _a, c,c GQL C697 Mr. Victor Stello, Director Division of Cperating Reactors U.S. Nuclear Regulatory Agency Washington, D. C.
20555
Dear Sir:
"hree Mile Island I.uclear Station Units 1 & 2 (OE-1, DE-2)
License :To. DPR-50 (DE-1) :
DPR-73 (DE-2)
Docket Lio. 50-239 (DE-1): 50-320 (DE-2 )
References:
A.
Letter, 7ictor Stello, Jr., :iFC to all P'4R Licenses,
January 25, 1976 3.
Letter, J. G.
Herbein, 'detropolitan Edison Co., to Victor Stello, May 8, 1978, Asy=etric LOCA Leads, Phase I Phase 1 of cur Asy retric LOCA Lcads Preg a-that was outlined in our previcus letter to you (Eeference (b)) has been conpleted for both DE-1 and D!I-2.
" hat phase of our work has identified the need to proceed with less conce vative approaches and, therefore, this letter submits our plan for prcceeding with Phase 2.
The attached repcrt entitled "EFJ 177 FA Owners Group Asynnetric LOCA Loads Evaluation Program. Phase 2" identifiec the centent of Chase 2.
Please note that we are still engaged in the requested evalmation as a participant of the 3FJ 177 Fuel Assenbly Owners Group and, Pere pe"nissible, plan to take advantage of generic analyses.
Tnen doing so. We vill provide justification for the generic grouping.
Sincerely, s
v J. G.
Herbein 7 ice Fresident Generation O
JGH:EAL:.rn 5 \\.
7906010213 Atta rent
' h p C)p$
cc: D. DiAnni (w/o attach)
,s.
4 w.
\\,.
~
- u..
-.,n.
j 168 302 m= = sm, :_ om m am c m 5,-