.. ed PROGRESS AS OF 6:00 AM 4/f4 e.-
h' 3:.-
.a_.
1.
Attached copy of core map and latest system conditions.
E:.:
2.
Industrial waste storage problem - have 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> to fill from 4 a.m.
e.
3 2nd level probe has had 2 spikes but returned to normal, failure is expected (o stoold be assumed to occur in near future hours) remaining level probe is norrnal with no indi-cation of failure.
Methods are being persued to backup level (I) makeup tank level (x s lf cr- [ g) at c 4 ha bMy f""'
e 4.
Did not obtain a waste gas decay tank sample.
5.
Containment pressure is decreating since they stopped vent-ing through pressuri::er vent line.
9 6.
Work is just beginning for installation of filters on con-denser ejectors.
7 No indication of work starting on Insta!!ation of charcoal filters in auxiliary building vent.
8.
Ao e.idence of advanced planning during night shif t.
167 166 79053002 3 0 [
2-instrumen __ 53.:
9 Licensee's plans for handling loss of all level tation is to slowly go water solid.
-((
a.. ~
10.
Raquested Bob Arnold to develop a list of all activities long and short term being pursued with estimated dates E
of completlon.