ML19224A672

From kanterella
Jump to navigation Jump to search
Lists Requested Replacements for IE Region 1 Personnel at TMI-2 Site
ML19224A672
Person / Time
Site: Crane Constellation icon.png
Issue date: 04/12/1979
From: Keimig R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
NUDOCS 7905190175
Download: ML19224A672 (1)


Text

i

./,'i.-j 7 y l'..? tG ' '.DDi FCR :

E.

J. Drunner, Chief, Lo!.NS Brc.nch, RI FRC:!:

R. R. Ke imig, Chie f, RPS No. 1, RCENS Branch, RI

SUBJECT:

RI REPLACEMENT PERSO:mEL FOR T'il SITE (J tC The belcu listed RI Reactor Operations persennel requestad for replac. rent of inrM ated persennel pres +.ntly at TtfI:

J. Jchnson for L. Bettenhausen on 4/17/79 - to st.:nd the 0000-0300 shif t D. Haverkamp for R. Ccate on 4/IS/79 - to stand the 0800 - 1600 shift J. Higgins for W. Lazarus en 4/19/79 - to st.*nd the 1600 - 2400 shift H. Kister for E. 'IcCabe on 4/16/ 79 - to stand the C300 - 1600 shif t (a one shift overlap is anticipated).

I will be relieved by P. Rellogg, Chief, ':uclear Support Section No. 2, Region II on 4/18/79 on the 0000 - 0800 shift. A one shift turnover is anticipated.

R. Warnick, R III was replaced by W.

Little, R III on 4/11/79 en the 1600 - 2400 shift.

All personnel, with the exception of H. Kister, are reporting for 2 week assignments.

/A

/

R.

?

"eimig j

cc:

B. Grier, TMI Site J. Keppler, TMI Site J. Allan, RI J. :'c os ca r, T'il S i te 295 134 7005190('7 6/

0 CJ L

.