/ METROPOLITAN EDISON COMPANY
/l____--.-
POST CFFICE BOX 542 RE ADING, PENNSYLVANI A 19603 TELEPHONE 215 - 929 3601 Eecember 28, 1978 GQL 20C6 Director of '.aclear Peactor Peculation Attn:
Mr. C. A. Varca, Chief Licht Water Feectcro Ernnch !!c. 1+
U. C...uclear Peculatcry Co=.iccion WaN 4 Lcton, DC 20555 Three Mile Island Iiuclear Etntien, Unit 2 (TI-2)
Operatinc License I;o. LFh-73 Docket ';o. 50-320 Startup Ferort
Dear Cir:
Section 6.9.1. 3 of the T'!I-2 Technical Cpecificaticn requirec that a startup report Le outrittee within nine tenths following initial criticality.
Initial criticality vac achieved fcr 'D!I-2 en March 28, 1976.
There fore, enclosed plence find the regt. ired TMI-2 Etartup Eeport.
Alco, plence note that becauce the Test Procedure for pcVer accencion tectine vac not eenpleted at the tire the enclosed report vac written, power accencion test resulto could not le included in the re po rt.
dovever, the encloced re-port includen results from the following tectc which have been completed.
Thece tects are ac follovet I.
Initial Fuel Lotding II.
Poct Fuel Load Freeritical Tect Program A) Eencto" Ccolant Fump Flow Tect B) h actor Coolant Pu~.p Flow Ccactdown Tect C) Control Eod Drop Time Test D) Freocurizer Test E) Feactor Coolant Syster Leakace III.
C re Performance - Measurerento at Zero Pcwer A) initial Criticality B) !!uclear Instrumentation Overlap C) All Rodo Cut Critical Eoren Ccncentraticn
/
D) Temperature Coefficient Measuremento
- b,/
pi E) Coluble Poison Worth 0
F) Control Rod Group Worth Measurerents, f
y9010 M 1@3
\\((
c.
lir'. M. A. Varga, Chief recetter 28, 1978 GQL 20C6 Because
'"'I-2 hac not yet terun contercial rever operati on and tecause the st artup test procrun vac not corpleted at the tire the er.clcced report vac written, a cupplementary rerort vill te sutnitted as required by Cection 6.9.1. 3 o f the TMI-2 Tecl.nical Speci fications.
Sincerely,
/
/
J. G. Herbein Vice Preaid<:nt - Generaticn m
JGH:RAL:c1b cc:
H. Silver Enclosure b Ii$b