AVIRAGI DAILY U?i!T PC'4IR LIVIL Decket No, 50-320 Unit NI-2 Date 10-9-78 Cc=pleted 3y P. A. Lenzel Telephone 215-929-3601, Ir 1h8
,m,q cm gg DAY AVIRAGE DAILY PCVIR LIVIL*
DAY AVERAGI DAILY FCWIR LIVIL" (M'Je-Net )
(M'le-N et )
1
-H 17
-35 2
-10 16 3
3
-9 19 57 h
-9 20 9
":h 5
-5 21 h6 6
-5 22 4 9-7
-9 23 8
-9 2h
-21
-10 0
9 25
-27 26 63 10 lIl
-32 27 n
-17 26 233 12
-11 3c2 13 29 309 1h
-23 30
-l
15 31
-lI 16
~
"Please note the negative numbers indicate that =cre pcVer '.as supplied to the unit than was generated by it.
Sese nu=bers are included fer ycur informatien caly.
7fr/ o/7 o fg 33g LAlff
- OPERATING DATA REPCRT Decket No. 50-120 Date 10-9-78 Cenpleted By R. A. Leneel CFEFATING STATUS Telephcne o' c_c2c Mn, w+
1_
l.
Unit Name: 2C-2
- 2. -Reporting Perioi:
Septe=ber Licensed Themal Fever (Wt):
2772 FC-S.
Na=eplate Rating (Gross We):
5 Design Electrical Rating (Net We):
9c6 6.
Max. Dependable Capacity (Gross We):
930 N
7 Max. Dependable capacity (Net We):
8.
If Changes Cecur in Capacity Ratings (Items No. 3 through 7) Since Last Report, Give Reasons:
9 Power Level to which Restricted. If Any (Nat W e):
2563 Mv(t) 10.
Reascns fcr Restrictions, If Any:
Fever is limited pending *iRC appreval of 3&*4 "rsil 3ree 10CA Analres s&4 + a ~. ~ _;L -a
"'his Mcnth Yr. -To-D at e Cu=ulative 720 ud3 hhS3 11.
Hours in Reporting Peried 12.
No. of Ecurs Reactor was Critical 236.5 c:T o. ?
c;7 9.
h53.5 2271.5 2271.5 13 Reactor Reserve Shutdevn Hours lb.
Hours Generator On-Line 189.1 231.1 231.1 0
0 0
15 Unit Reserve Shutdevn Ecurs
- 16. Grcss Thernal Energy Generated (WE) 1656f5 203r6 203576 17 Gross Elect. Energy Generated (WH) 30912 h42C4 hh20h
- 18. Net Electrical Energy Generated (L~d) 22cTO
-36704
-367CL 19 Unit Service Facter N/A N/A N/A N/A N/A N/A 20.
Unit Availability Facter 21.
Unit Capacity Facter (Using MDC Net)
N/A 7 /3 7/3
. /A N/A 22.
Unit Capacity Factor (Using DER Net) 7/A i
N/A N/A N/A
- 23. Unit Forced Cutage Rate 2k.
Shutdowns Scheduled Over Next 6 Months ("'ype, Date, and Duratien cf Iach):
25 If Shut Dcun at End of Report Period, Esti=ated Date of Startupt
- 26. Units In Test Status (Frier to Cc==ercial Cperation):
FCRECAST ACHII"TED INITIAL CRITICALITY 3-9-78 3-23 79 0-15 70 INITIAL ELECRICI~'Y 11-26-73 CCMMERCIAL CFERA"'ICN 4
i
- =.
o w
Docket No.
50-320 LINIT SlitfrDOWNS AND POWER REDUCTIONS
~
Unit Name
'lti t -2 REPORT MONTil SEf"PitfBER Date 10-9-78 Completed By R.
A. I.engel Telephone 215 ')PO-1601 Ext, li 8 i
No.
Date Type cu System Component Cause and Corrective l
Code le Code 5 Action t.o 4g g o gq gy o
ym
{
wg g,ct g, sg Prevent Recurrence d U 'l 00j a
m m
1 9-1 '(8 F
h22.7 11 3
78-33/IP Repair and testing or main steam carety val u.s t
2 9-20-70 F
5 A
3 losa or a motor reed pump 3
9-21-78 F
3 A
3 Control problems with FWP1A h
9-22-7d S
69.3 B
1 Testing or main steam sarety valves 5
9-25-78 F
5 II 3
liigh reactor pressure due to reducing load on turbine 1;
b W '
b I
4 2 enson:
3 A
G - Insuu Mons I F: Forc ed H
Hethod I#
"E#"
" I ""
S: Scheduled A-Erguipment Failure (Explain) 14fanu al Entry Sheets for Licensee B-Maintenance or Test 24amal Scram
""E # ( ' "}
C-He rueling 3-Automatic Scram.
~
D-Hegulatory Hestriction 1-Ott'er (Explain) 4 E-Operator Training & Licensee Examination F-Administrative G-Operational Error- (Explain).
Fxhibit 1 - Same Source
!!-Other (Explain)
I
Su==ary of Cperazinz Experience
~
Three Mile Island, Unit 2 entered the =enth with the Unit in Mode 5 verking en vacuum cutnge items and en main ste1= piping restrsints.
On Septe=ber 7, vacuu: vas established in the condenser and feedvater heating commenced. On September 9, unit heatup ectmenced in order to continue with the test progra=.
On September 11, it was determined that the pressurizer spray line was blocked '
by the disc of RC-V3 A cecidevn was cc= enced to replace RC-V3 sten and disc asse bly.
The unit returned to Mode 3 at ih58 en September ik.
At C020 cc September 15th, the centrcl roc: received a Reacter Suilding fire alar =.
Investigation revealed a cracked fitting en the "3" e=ergency feed header and unit cocidavn was cen=enced at 0055. At 1900 en September 16, the veld repair cf the cracked EF syste: fitting was approved and heatup ec= enced. The reactor achievel criticality at 2029 en September 17, and the turbine was placed on the grid at 100 My at 13k2 en Septe=ber 18.
At 2212 en September 19, the reacter was tripped for the Ehutdown Cutside Central Ecc: test. The Unit returned to power a 06h0 on September 20 and 15% pcver level ICS tuning continued. At 1606 en Septenber 20, the reactor tripped frc: 20% power en high pressure due to a 1:ss of a condensate beester pu=p and a : sin feed pump. The reactor tripped en high pr4ssure due to problems with the main feed pump.
The Unit returned to power at 10k0 cn September 21 cnd power was increased to 305 for I:s tuning. At 0925 en Septe. ber 22, the turbine was manually tripped per the turbine test procedure and the reactor successfully ran back to 15% power. At 1950 :n September 22, unit shutdown ec= enced to allow repairs of a leaking cerex connection en the special instrumentatien installed in "B" stea= generater.
The Unit entered Mede 5 at 0853 c= Septe=ber 23 and repair verk ec==enced.
The reacter was taken critical at 06h5 en Septe=ber 25 and the Unit returned to 155 power at 0915 At 2056 cn Septe ber 25, the reactor tripped frc= 175 power on high pressure due to the main feed punp tripping on lov suction pressure. The Unit returned to 20% power at 0537 en September 26.
Reactor power was increased to h0% at 1230 en September 23 to continue with the LO5 power plateau testing.
At 2355 en September 30, pcver vis reduced to 355 for physics testing per Tp 800/5 Major Safety Related Maintenance 1.
Peplaced sten and dis: assembly in EC-V3 (pressuric+r spray line 'cicek valve).
2.
Feli repair cracked fitting en E=ergency Feed syste: "3" header.