Text
,
4.
I IAG fieco #IA.24 TASK CLOSE OUT DOCUMENT Task Scope O C i_9 EC m,.'t ' /_, y,2
%, 4 <** e f' 6,6.,T. s A - tiit~v in:
f)e i !, i, c an, v
To:
M. Levenson d c S E N A v e d c!'
S. Levy E. Zebroski Task No.
2 '/
Date Complete
- /
OM i
Reason felt task is complete:
5 <..c e uNnLYa.J' (Ekk w%) 4-k.1 O~ i c b o,
~
l,-
4<J 3
r.aG u r n., AX ur -<-
c.n
_~,t
.;x.
n
_V
/
)
g 7 t1 5
p r
h Me:rters of Ccenittee
?/ W Sc' M tYM
?
T'i.1 Tis / e'51 d6 d~
7
' Signed' l A 2 "f ddL Ctanittee Leader LG t..0/
$; W W 166 145 h{.
g
'.3 (j
? 0 05 'n3 0.S_og-
i n
./
f April 20,1979
,sF 's TO:
S. LEVY
SUBJECT:
POSSIBLE LEAKAGE OF GASF: :S ACTIVITY The gaseous activity in the Aux ary Building is apparently coming from the make-up tank (MU-T-1) vent.
.he activity level of this is above that expected if its source was the MU-T-1.
A likely source for this gas is one or more of the reactor coolant bleed tanks (WDL-T-1 A, 8 or C).
The leakage path could be as follows:
1.
Source: WDL-T-1A, B or C 2.
Through: Air operated diaphragm valve WDL-V26A, B or C 3.
Through: Manually operated diaphragm valve WDG-V116A, B or C 4.
Leakage Past Check Valve WDG-V110 on the MU-T-1 vent 5.
Out MU-V13 or MU-V136 which may be leaking to the room.
Recentnenda tion:
Close valves WDL-V26A, B and C if open.
W. Stroupe WS:dr 166 146