/v PLANT OPERATION STAFF
.644.sch w Af g
- g, g '4,u,.e Task Description Priority Status /Due Date Task Coord Obtain RCS pressurized Schedule next Thorpe /Hetrick sa=ples. Review sample 1
sample--CS00 Shift Surarvisior frequency (Broughton) 4-25.
),/
,J/
Pressurizer Heise and Recalibrating Wilson /Broughton D ff. press [ ~t dead-1 LT-2 failed.
Ignt tester.
,X Reductfon k RCS temp.
Logan to 175 -- Limit speed of turbine to 500 rpa.
,A[
Boron concentration in 0700 4]Q; sample.
3rcughton RCS calculation Sample was 2937 Shift Super.
35cc/kg gas.
f Obtain SEC approval and (Tie in approval only.)
Need ECM'S h Porter / Faulkner 36, 37R1, 52, 56, Seelinger M, 9 2, M, M$,
109, 127,,13T, 132, b
[
SSRW pump repairs 1
A.
In service Miller /Shovlin B. Asser.ble 4/24 //,,co C. Disassc=bling the C. punp.
K Set up 350 CE! air Cc=p-3achoffer/ Thorp f
ressor for use by W in 2,
decontamination of D. C.
building.
L'se Eberline to monitor Bru==er trend. Plot every 10 mins.
[
Make calculation of RAD.
Ccbeap/Gunn levels that will occur in cond. Demins - if we circulate and clean 3 OTSC.
/
J0.
Layout STE office for use Porter.
as Aux. Inst. location for Incore temps. etc. -
Provide Milestone Schedule.
164 262 Make sketch of WGDT Miller /Floyd and Mcnitor tank level vs time.
7005230 64 C
-.r Task bescriotion Priority
' Status /Due Date Task Coord.
[
Prepare instructions for Herbein/Morck/Kunder loss of gland stea:2 to turbine.
1 Determine Hotwell radla-Hetrick tion levels twice a day.
[
Look at using generic 4/23/79 Thorp / Miller R'JPs to cover heavy traf fic or department.
f L5.
Se prepared to run Toole Existing 3 Decay Heat Pump on recire - Wednesday 4-25 Have Schedule 6 pc today (Include megger of mo tor).
,.1[.
Hydro FW heater to determine pM,h i
T le if it leaks - we need surge tank for "B" OTSG long ters b #,y ccoling system.
f M
[
A. Sample "B: OTSG for total y Hopkins B. Sample Cond Pump discharge.
Q#
p l* M,A-activity.-
AN Match every 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to VAC I
.p b
C. B Main Steam stop on B side. @ g gp pump exhaust.
4 /
y pgo I@
Seeinger Operations check Turbine Su=p, gpk Cond Pol Sunp & Waste 'ent
. /A MM yy#
tank sump to see if the y go to Ras waste.
, (,9 & 'U Verify heaters cperational on Vac)* jO Shoviin/Teole gha %DWi Pump exhaust.
f Take gas sample on HPR - 221 A53.
Miller p
Do we have extra sample pumps.
,d u/4t) /0 g h 4Lf for HP-R-222 5228?
qO g rrupm m L km 2**
N*
164 263
PLANT MODIFICATIONS Task.
_pescrintion Priority Status /Date Due Task Coord.
.WF
.Decon water in AB using 1
Relay inst. process, Cobean Epicorion exchange pro-ventilation, fire svc, cess. Targer operation, Demin water, serv. air 5-11.
power-Need ECM 36&96.
/
TS-Develop complete package 1
Equip. avail. 4/21 Wilson /
for logn-term cooling of Instal. comp. 5/7 Cobean OTSG "B". Use Unit #2 7
g Demins, for long ters
,/
system.
/
TS 4 Develop comp 1ne package 1
Heise gauges instal.
DeVine/
for measuring water level 4/12. Do not open Cobean/
inside reactor building.
DH-V6B, until approved.
Herbein TJritf' Install 2/2500 kw diesel 1
Equip. avail. 4/10 Cobean/
/
generators - check ship-Instal. comp. 4/20 Gunn/
ping damage - vendor. Run Toole diesel, fill fuel system.
Jfd Develop electrical distri-1 Equip. avail. 4/10 Cobean bution system. Install Instal. ccep. 4/20 cabling and switchgear from DG's to current BOP loads requiring loss of off-site power protection.
[WG-Install storage vessels in 1
MEC relocate their Cobean/
Fuel Pool " A" equipment.
Gunn Tc RC loop passive pressure 1
ECM cceplete Gunn control sys te:2.
Instal. comp. 5/2.
Irstall AB/FHB Filter 2
Relay power fire sve.
Gunn/ Thorp system. MEC install high process inst. Do base 3achoffer noise level signs.
line noise survey 4/23.
Tc Install and coepicte turn-2 ECM-S-069 Cunn over package of electrical heaters in supply side of Aux. Building. Existing Filter.
f Shield for decay heat pu p.
1 Installation to be
'iilson scheduled by 4-30 y
Resolve procedures that require Gunn/ Thorp evacuating FB prior to sampling 3g
!s inghouse CH removal system by Westinghouse.
IU p 16 Provide cap for lux. Building Gunn stack.
.c PLAST MODIFICATIONS task
' Description Priority Status /Date Due Task Coord.
Open two h' oles for R3 B&R/Cobean purge to be used for AB air cleaning.
Relocate #1 access to FH Cunn/ Rice building on Unit #2.
B&R put together set of Have by 4/24 Toole/B&R small flow prints.
WASTE EU AGEMENT CROUP G-5 Set-up to change AB/FH 1
Cut in A Aux.
Shovlin/
building vent. filters.
Bldg. Filter Bachoffer Changing out FHB filter-on 4-23 "A" & Aux. Building. filter "B'.' Map ou t change sequence.
L-33 Develop plan for tying tank farm to Epicor "2".
1 In progress Snyder Develop Health Physics Seelinger Plan to cover waste agmt.
Begin Maste Gas Program to Seelinger determine location of leak.
Develop plea for canage=ent Seelinger of decont<aination of radioactivity in Aux. &
Cont. Bldgs. - 4/23 Cet Bldg Sample thru Air Lock Miller Check possibility of det-Levy /
ermining containment semp Industrial level by measuring radiation Ads iso ry at centainment wall.
Group TECHNICAL SUPPORT LS-2 Tech. Spec. Daletions, 1
Issue 5-01-79 Harding f
{
}{}
Changes, and additions of Long-Term Cooling.
TM 32 Review with B&R work'on 7
DHR system codification 1
Issue 4-18-79 Capodanno
~M53'5 Establish long-term plc.at 1
Is sue 4-18-79 Chisholm
,/
Instrumentastor, game plan.
tobe revised Develop Cuidance en Natural need date.
Circulation procedure to be out 4/21 Broughton/ Tech Tech Group-Wilsen
TASK _
SCHED/
CCNST.
CCC.
TEST NO.
TITT.E COOPS.
_E';G_R.
_E_:._:G_R.
CO NT?A_CT_C R CCM". EST
'iG 1 A3 Filter tirif M. Schuber: McMullin UESS He'aold s -
TS 3 SG 3 Rose J. Paparelli ?oje Long ter Freulx T. Jordon Catalytic coeling f
'JG 6 Storage
?nusi J. Tochy McMullin CI55 tank "3" D. Payne pools
'?ater recen V. Fricke Gatto Ca:alytic
'iG 2 systen Uilkira D. Lilly (CAPGO)
Fre drik TS 6 Fressure Shippert Fapaiya Poje Centrol Ray D. Lilly TS 10 Diesels Canale Gen:cle:
Kakarla Catalytic
& 11 McCabe Meniyar TS 13 Heater in Ccnale M. Schuber:
McMullin Catalytic A-3 filter McCabe Shield for'Iright de c ay-h e a t pump pi:s :Te ll=ol d
- T/A Catalytic 164 266 g
e g
S