Notes of 6 PM 790410 Technical Mgt Meeting
ML19221A502
Person / Time
Site: Crane 
Issue date: 04/10/1979
From:
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 7905230097
Download: ML19221A502 (2)


Text

_

M" b 9f et LO*E win x0..h.

g., M s QQ be VAckuh N g Meeting Minutes QQ

~Q

%5

\\ A ~ f),.Nx e.Y Y

>Y h

,- M oH 1' y%g hu - 3 % DHR.f=

MIdAGEMENT/SCHEDUIE J1EETING 0900 [4/10/79) kJ,,h k b al TM b 2 m (4)A</ L2 wM We/*

d ff

+

ew gum A4ae y lct a p h = W i+<c[

  1. ction

%r A

1.

Primary coolant sample has been taken.

(40 ml, Herbein 17 r/hr gamma reading).

Get samples to labs Miller (Met-Ed, B&W, Savannah River, Oak Ridge).

Ibn mG SRL d olt M L. M b '3m m 2.

Check reliability of pressurizer level indications; Herbein release hold on depressurization.

Wilson 3.

Bob Long (Ext. 170) is establishing data center.

All Essential that copies of all data is forwarded to him.

4.

There will be a mee ing at 1200 Wednesday, April 11, All 1979, in Euilding 26 to discuss the Safety Analysis for Natural Circulation and Long Term Cooling (which will be provided).

5.

Implement shorter health physics training for Herbein qualified personnel.

6.

Sample has been taken on Neutralizer Tank 8A.

Need electrical work or new valve line-up to get recirc Palmer on 8B for sample.

7.

NRC to locate railroad tank cars for contingency Stello liquid waste storage.

8.

Locate Heise Gauges (0-20 psi range) for containment Herbein sung level measurement system.

-~

9.

Emergency RB cooling pumps have been repacked.

Herbein Leakage to Auxiliary Building reduced to essentially zero.

Tech Spec changed issued;to allow securing the

}()) 2[D pumps.

10.

Investigate report of leaky atmospheric dump valve, Palmer S.G.

"B".

7 905 2a oM 7 tf

/

_2-

-6, W Meeting Minutes 4/10/79

. 11.

Instrument Group to issue 12-hour status reports Levenson on instruments.

12.

Determine what in-core *hermocouples should have Levenson readout in Control Room; route " Diagnostic" signals Wilson -

to other con enient location.

13.

Most excores working well.

Assure that operators are Herbein aware of any invalid signals.

14.

Movable detector N-8 is capabl,e;of b,eing. moved at least 3 ft. into the core ~.

~ ~

i 15.

Thermocouple on exit of electro-mechanical relief Wilson valve may provide valuable data for reconstructing incident.

Locate data and retain.

16.

Emphasi::e that we are operating in " casualty" mode-All not business,as usual.

Judgment must be made and technical review limited to the essentials.

17.

Need training course for going to natural circulation.

Wilson Zeckman 19.

Westinghouse should re-direct effort to locating Cobean skid-mounted system next t3 pit outside Auxiliary Build-ing for hook-up in 24 period.

9 ;o a.m W e d E be % P m

19.

Proceed with isolating make-up tank; depressurize Herbein primary system; take gas sample; vent if oxygen is less than 5%.

,ca -

~

mo yo s Q n el d LW-A,3a%

op &

moht 4

Ld W m W ~t Ab a

M-ot.

d.H Aa Juk 0%

6m w3 ma%u.hMWM6k.

W 6 b Ts cm

=

M da

.