Agenda for 790410 Technical Review Meeting
ML19221A494
Person / Time
Site: Crane 
Issue date: 04/10/1979
From:
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 7905230086
Download: ML19221A494 (1)


Text

et.nos u i ncvien r.ce u n s v

Te d <~. - 2 3, PgJ c e/

1890, 4/19/79 f.M-Q Action 1.

Provide knowledgeable plant man to Industry Advisory Group.

Arnold 2.

Present conceptual design of DHP. with regard to collection of leakage, etc.

}l 3.

Identify -flow path to transfer water from Neutralizer Tank 8A to Unit 1.

Bitel 4.

Provide written instructions so that PH Ops can maintain additions in AB sump to fix iodine.

Bitel 5.

Assign an Operations ' Water King" to work with Waste fianagement to eliminate any bottleneck in the tasks.

Herbein I

6.

Complete procedure and sample MU tank. Tank not to be vented until sample is taken.

Herbein 7.

Cetermine what if anything should be done as a result

Levy, of the yellow coloration of primary sample.

Wilson 8.

Expand vent header leak evaluation to include MU tank manway gasket.

Levy 9.

Review procedure for installation of air ejector fil-ters to insure precise actions are identified if they start to lose vacuum.

Ferbein

10. Determine if small taps used for containment leak test were considered in evaluation method of measur-ing water level in containment.

Establish best method. Cobean

11. Examine bubble technique accuracy to determine con-tainment water level.

S. Levy

12. Determine boration level to be used.

a.

Provide assessment of core configuration.

McMillan/ Levy

13. Review TS procedure for short-term evacuation of Unit 2.

McMillan/NRC

[14. Provide assessment of Reflux method of cooling.

McMillan

15. Provide update of assessment of time to melt through the vessel and the assumptions used in the calculation. NRC d 16. Determine how many tank railcars can be accommodated Cobean on site.

d 17.

In taking a pressurized primary sample:

163 232 Can we get a smaller bomb compatible with a.

McMillan sample sink?

b.

Can we shield the existing bomb?

Herbein 05230 %