ML19221A451

From kanterella
Jump to navigation Jump to search
Forwards Jg Herbein 790405 Memo & Agenda for 790406 Daily Planning Meeting
ML19221A451
Person / Time
Site: Crane 
Issue date: 04/05/1979
From: Vollmer R
Office of Nuclear Reactor Regulation
To: Mattson R, Ross D, Stello V
Office of Nuclear Reactor Regulation
References
NUDOCS 7905230032
Download: ML19221A451 (8)


Text

, -,.,,

April 5, 1979 NOTE To:

R. Mattson V. Stello D. Ross J. Collins Please give me any notes appropriate to attached material by 9:30 A.M. on April 6, 1979.

Dick Vollmer

Attachment:

Meted Daily Planning Mtg dtd 4/5/79 790-a3OO3b 0-Q

\\

162 353

_.y..;

METROPOLITAN EDISON C O M P A N Y sa,.o.,, o, c,m,.i reim ui.i..., co,co,.oom Subject DAILY PLANNING MEETING Location TMI Date April 5, 1979 To DISTRIBUTION JGd Memo #

Location:

Trailer #22 Time:

10:00 a.m.

Daily Th e above meetings are being initiated in order to c: ore ef fectively coor-dinate activities, assign task responsibilities and obtain general agree-ment on the activities for the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period following each meeting.

It is intended that these meetings will be reasonably short.

Thus, it is important that attendees come prepared to discuss the agenda items and have reasonable alternat ives for those they feel are objectionable.

Any attendee wanting to place an item on the agenda should contact the scheduling group in Trailer #21 prior to 8:00 a.m.

the day of the par-ticular meeting of concern.

Such items should include a sLort statement of the activity of concern and an indication of the priority the items should be given.

It is expected tha~ thote in attendance will have the necessary authority to approve the daily plaa and they will be expected to sign the plan for succeeding 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period.

Attached is a list of activities to be discussed at the next meeting.

v I

i J.

REREEIN

j fg cc:

W. Creit:

J. C.

Herbein - 2 copies G. P. Miller /J. B.

Log an B. Craber D. Ro s s / R. Voll=cr W.

Cunn/W.

H. Hirst R. C. At uold/ R. F. Wilson R. J. Toole/J. Sheehan D. M. Shovlin J. L. C. Eacho fe r, Jr.

J.

Devine J. T. Faulkner D.

E. Hetric k L. F.

Pogers J. J. Colit z J. F. McConnell D. Limroth

.b a

Cbscrvat ion Center H3. Qtrs.

k File - Trailer # 21 ~5S ltG E R - O F F I C E fA E T,* 0 R A,' 0 U T.i

_ ~.

. ITEM TASK DATE NO.

COORD.

DESCRIPTION / STATUS REQUI RE D, RADWASTE MANAGEMENT AC11VITIES 1.

Mc Connell / Cunn Design / install additional waste Pri 2 hold-up facility for

  • ie in to waste gas system.

(ECM issued for founda-tion) 2 McConnell/Cunc Nvelop processing system.

Pri I (rank farm) 3.

IODINE CONSIDERATIONS A.

McConnell Sample AB/FH Bldg. for filter Pri 1 replacement indicating accept able operation.

B.

McConnell Provide alternate set of filters Pri 2 for AB/FH HVAC.

C.

Mc Connell Determine bes t solution to be Pr1 1 used in Aux. Bldg. to maintain acceptable iodine limits.

D.

McConnell Analysis o f existing conditions Pri 1 e Y

h. _.

DAILY PLANNING MEETING AGENDA April 6, 1979 ITEM TASK DATE NO.

COORD.

DESCRIPTION / STATUS REQUIRED 1

DECAS IN PRESENT MODE:

Pri 1 A

Dev ine/ B&W Do we reduce Pressure in 50 psig increments to 500 psig?

Noon 4-5 B

Dev ine / B&W Ibv do we measure rate of Degas?

Pri 1 C.

Devine/Kunder Inc re as e letdown flow.

Pri 1 P.

Miller / Devine Verify letdown valve alignment of Pri l makeup ~ system.

E.

Shovlin/ Knoll Restore pressurizer heater.

Pri 1 (495 KW cf 1755 KW 005)

F.

Devine Investigate use of sample line Pri 1 to Degas.

PRDL\\RY SAMPLEa:

2 A.

Miller /Dabie'.

Fabot performance testing for Pri 2 RCS samples - need procedure,

s B.

35W bgers retermine urgency & requirements

/i'e r b e i n for primat y sample to evaluate core cordition.

4 e

' ~ - ',,,

. ITEM TASK DATE NO.

COORD.

DESCRIPTION / STATUS REQUIRED 3.

Grayber/Lachofer Lnprove TLD method s.

Pri 1 (Do we need to read daily?)

Bacho fer Co-ord. personnel to limit exposure Prior to of aux. opers/ rad tech.

1500, 4/5 4.

Miller / Dub iel Determining sources of high iod ine Pri i

sample near AB elevator.

5.

B&W Rogers Test on PZR. level for loss of 2nd Pri 2 level indicator.

Heise gage installed.

Develop procedure for te _ ting / reading.

6.

Miller /Herbein FW tank vent to RB.

Repair fitting.

Pri 1 7.

Devine/ Miller Waste gas decay tank vent.

Pri 1 Prepare presentation on venting to Prior to Rx Bldg.

1700, 4/5 DH SYS. FOR COOLDONN:

b.

A.

Arnold Euvelop game plan for use as cool-Pri. 2 down if required.

B.

Conn /Cobean Nark with W to develop design for parallel DH Sys.

162 357

~

=

4 3-ITEM TASK DATE NO.

COORD.

DESCRIPTION / STATUS RECUIRED 9.

B5W Rogers Develop methods and procedures Pri 2 for cooldown using OTSC' S on natural circulation:

Arc both OTSC's required for:

A)

Steaming down B)

Solid secondary cooldown 10.

Wallace Calculate Rx coolant spray flow.

Pri 2 11 Limroth Q2alif y ( 5) men, at leau-, :o go Pri 1 in Aux. Bldg. by 1700 on 4/5/79.

12.

Gunn / Cobean De s i g n/ Fab. install shield plugs Pri 2 at D11 vaults in aux. bldg.

13.

Mc Connell / Cunn resign a shield wall at cond.

Pri 2 demins in Turb. Bldg.

14.

Cunn/ Catalytic Clear warehouse at south end of Pri 2 site for GPU rec 'd matl's (4/6/79) 15 lie rb e in / Conn F4T sump d ischarge.

Install Pri 2 portable IWT system.

16 cunn /lli r chman Cesign and install filters a*

Pri 2 v a c u u:a pu,p d is cha rge.

162 358

. J ITEM TASK DATE NO.

COORD.

DESCRIPTION / STATUS REQUIRED 17.

Devine/McConnell FJtS De-sensitization.

Pri 2 18.

P _ / ine / Cob ean Seismic analysis of main steam Pri 2 lines in Turb. Bldg.

Are additional supports req'd?

f Develop access list to Island /

Pri 2 19.

Limroth control room.

Stac Security on Island Miller Fire fighting readiness 20.

ES'4 Rogers / Shepherd Core analysis program:

Pri 2 A. Thermocouples from incores B. Neutron

.gnals from inceres C.

Naise analysis 21.

Arnold Provide contingency ef fort co -o rd in a t ion.

162 359 m

a

ITEM TAS K DATE NO.

COORD.

DESCRIPTION / STATUS REQUIRED 22.

PLANT CHANGES:

A.

Miller /Tro f f er Develop. lis t (Colit z supply man).

Pri 2 B.

Miller Establish control room change control log.

23.

Miller IMvelop procedure to put plant Pri 1 in best possible condition for CR/ site / total evacution.

Up-date emergency plan.

24.

Mc / Guoy/ She walt e r Construct brick wall at water Pri 2 filter system, Unit 1 HX vault for thit 1 processing.

25.

Gunn Move Aux Bldg.model to Turbine Pri 2 Deck / provide pictures.

$4