April 4, 1979 NOTE TO:
J. Collins W. Kreger G. Mazetis T. Novak Please give me any notes appropriate to attached material oy 9:30 A.H. on April 5, 1979.
Dick Vollmer cc:
R. Mattson V. Stello D. Ross 3 9 0 3 2 3 0od 162 30
. +.
METROPOUTAN EDISON C O M P A N Y us u., e om.e w.c o,u,,, cc.._
Subject DAILY PL*..?NING MEETING l.oca tion
'U!I Date April 4, 1979 To DISTRIBUTf.ON JCH Memo #
Incation:
Trailer #22 Time:
10:00 a.m.
Daily i
The above meetings are being initiated in order to more ef fectively coor-dinate activities, assign task responsibilities and obtain general agree-ment on the activities for the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period following each meeting.
It is intended that these meetings will be reasonably short.
Thus, it is important that attendees come prepared to discuss the agenda items and hate reasonable alternatives for those they feel are objectionabic.
Any attendee wanting to place an item on the agenda should contact the scheduling group in Trailer #21 prior to 8.00 a.m.
the day of the par-icular meeting of concern.
Such items should include a short statement of activity of concern and an indication of the priority the items should
.e given.
It is expected that those in attendance will have the necessary i
thority to approve the daily plar and they will be expected to sign plan for succeeding 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period.
e
. tached is a list of activities to be discussed at the next meeting.
SV J. G, tlERBEIN
- j fg cc:
W.
Creit:
J. G. Herbein - 2 copies G. P. Miller /J. B.
Logan B._ Craber
- d. Ro s s/ R Vollmej b.
Gunn R. C. Arnold /R. F. Wilson R.
J.
Too l e / J. Sheehan D. M.
Shovlin J. L. C.
Gachoffer J. Devine J. T.
Faulkner
}h2 h\\
D.
E.
Hetrick 3
Observat)on Center Ud. Qtrs.
File - Trailer # 21-P&S IN T E R-O F F IC E t.".E 3.'O R A N D U M
DAILY PLArmING MEETING AGENDA April 5, 1979 ITEM TASK DATE NO.
COORD.
DESCRIPTION / STATUS REQdIRED
- 1. A.
Miller / Ops.
Degas RCS w/ Plant in current Est complete 5 days mode of operation (4-8-79)
B.
J. Devine Ibw do we track rate of Degas.
2.
Miller / Ops.
Continue to Run No. 2H2 Rec ombirier Working 3.
Miller / Chem.
- a. Robot Performance Testing for Delayed - can't get RCS samples.
in Devine b. De t e rmin e Requirements for Primary Sampic 4.
Radwa s t e Mgat.
Hook-up Solidification Truck for Group /Toole Radwa s t e. Need hose Tie Think Tank / Rad Con / Plant Staff 5.
Gunn/ Miller Define Need for N2 - Backup supply 6
Devine Des ign/ Fab. Instl. Shield Plugs at
/GPU Engr.
DH/BS vaults in Aux. Build ing.
- 7. A.
Gunn Cond. Storage Tanks Requ3'?
Liquid Waste Removal-via eruck (Determine need for shield wall at condensate decins).
B.
Radwaste Committ ee/ Tool e Cet Method to Process 8.
Chr is tman / Shovlin Improve shuttle service for In-Plant Employees tc/from TMI site.
9.
Miller / Porter a.
Review list of roc. and determine status of each (i.e., not req'd, on-hold schedule, in progress, to PORC, NRC, issued)
Miller b.
Review De generation list each shift change w/ operator 10.
Gunn/ Catalytic Clear Whse. at south end of 2 days site for storage of GPU rec'd j
materials - Logistics group will set up office.
~.
ITEM
. TASK DATE
~
NO.
COORD.
DESCRIPTION / STATUS REQUIRED 11.
Cunn/ B& R Design / install additional waste Is s ue Partial gas hold up facility at BWST area Eng. 4/4 for for t ie-in to WDC - ECM - Issued foundation and block wall Cunn/B5R a.
Design / Install tank farm with Conc ept ual shield walls to act as processing design on site system. - 1 PM Meeting for review Arnold
- b. Review requirements & scope with bRC 13.
Miller / Dubiel Sample air around aux. bldg. sump to see if it should be covered.
14.
Miller / Ops.
Test on PZR Level - Prepare procedure
& Equipment.
Loss of 2nd level indicator - Go on Heisegage.
15.
Devine MU Tank & Waste Cas Dec ay Ven t Verify MU Tank Line Design a.
b.
Verify Decay Tank Line Design 16.
Ihrbein IWT sump to be discharged 17.
Shovlin FU/AB Vent Filters:
a.
Charcoal - determine av ail able inventory Shovlin b.
HEPA Filters -
Miller c.
Sample to determine need f,r filter replacement Levine B&R/Cobean d.
Provide alternate set of filters
,R Miller /J. Colitz Co-ord. personnel to limit exposure of aux. operatora 19.
Dev ine a.
Determine if caustic can be used in AB Sump to maintain acceptable Iodine limits.
Devine Determine source of Iodine Shovlin c.
Cover the A3 St 2)}
i kD J
Edller d.
Resample for Iod ine Dev ine c.
Analysis of exis t ing cond it ions.
ITSM TASK DATE NO.
COORD.
[ESCRIPTION/ST/.TUS REQUIRED 20.
7/Cunn Responsibility for design of filters for vacuum pu=p.
21.
Chr i s t man / Arnold Describe organizational re-sponsibilities (overall).
22.
Arnold Came plan for use of DH sys.
as cooldown mode, if required.
23.
Dev ine / Wall ac e AMS De-sensitization 24.
Miller Prov id e redundant power for RC-V137 & RC-V2 - Prepare DON'T INSTALL.
25.
Mtiler/ Dub ie l Update emergency plan for acasuring high iodine levels.
26.
revine B5 R/ Cob ean Make seismic analysis of =ain steam lines.
27.
Miller /Limrock Develop access list to Island Security on Island Fire Fighting.
28.
Devine What is structual concerns on RB under vacuum.
29.
Lionel Bannon Thermocougics - f rom Incores Neutron signals from Incore s.
30.
Arnold Provide contingency ef fort co-ord in a t ion.
31.
Mc Coey/ GPU Intermediate and long range radioactive waste gas and liquid overall planning and coordination.
.