- . J MORNING REPORT 4/30/79 1.
DHR Upgrade - TV c ame r a s installed and opera'1c; accelerometers en pumps being installed.
2.
Auxiliary building supplemental filter train - calibration of monitors about finished.
Installation of frame and plate for isolation "7"~~
"i capability and connection to existing train expected shortly.
n.:u'_ _.
3.
Auxiliary building flow paths - supply f ans and additional exhaust 'f3ns' will be started to attempt to reduce airborne iodine levels (while still maintaining negative building pressure).
4.
Containment water level - new estimated at 5 feet (425,000 gallonsi.'
Source is leakage from comparent cooling system and safety valves and
~
~
~
venting 'los se's"from the pressurizer.
5.
Su=p pumps Toth sump pu=ps inside containment are inoperable.
Some other means will have to be fou _d to remove sump water for cleanup.
6.
Tank farm in fuel pool - traks in place; welding of piping continuing.
7.
Heat balance by B&W; 4/2[/79:
Core Decay Heat 1.7 MW Pressurizer Heaters 0.3 MW
~
Loss in Letdown 0.22 MW
~
'~~ ~ Loss to Containment Air 0.05 MW Loss Due to Piping Underwater 0.1 MW Loss Irem Safety Valve Leakage 0.3 FM 2.0 MW 0.67 MW Calculated Reu, val by A Stm.
Gen.
1.3 MW 8.
The following attachments are included:
a.
Latest availabic system conditions and core map.
' ' ~b.
Hour 1'y'HFR -219 d,ata.
~
_ _. _ Operability Status Instru=ent c._
d.
System / component operability status e.
NRC envircamental data f.
B&W heat balance Attach =ents:
As Stated cc:
R. Vollmer W. Mills 4)
S. Grimes J. Murphy R. Engelken Trailer #2 i
J. Collins 7905210 %