Relocation Contingency plan,790402
ML19221A287
Person / Time
Site: Crane Constellation icon.png
Issue date: 05/18/1979
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To:
References
NUDOCS 7905210198
Download: ML19221A287 (21)


Text

-

l NRC RELOCATION CONTINGENCY PLAN 4/2/79 (I&E) 15i 221 7905210 / 7 f j

~ y,7 vr(l 5 9

t WC FILOCATIOn CotIT13cESCY M 4/2/79

$F$

\\

\\

N 1-1 s

e

\\)b\\

Luu

_+%

y RELOCATION C0hTINGENCY PLAN OBJECTIVE: To define a plan for t..ocation of NRC operations in the event the need should arise.

CONCEPT OF THE OPERATION:

Senior IE and NRR management will be relocated to Building 684 (Rocms 7A and 73) of the Carlisle Barracks, US Army War College, Carlisle Barracks, Pennsylvania. This movement will be accomp-lished via helicopter or van in the event of inclement weather.

Command Group "A" (Annex A), the mobile laboratory and equipment van will be moved to the alternate Command Post (CP) on initiation of this plan.

Group "E" (Annex A) will remain in position at the site CP until approx-imately T+1.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />, at which time relocation to the alternate CP will be performed via FA Army National Guard helicopter or van in the event of inclement weather.

All other NRC personnel will be relocated to the Region I Of fice. Movement of on-duty personnel will be accomplished via bus and/or helicopter (if needed). Movement of off-duty personnel will be via personal and/or rental cars available to them at their motels.

Subsequent NRC site operations will be conducted from the alternate CP and Region I Of fice locations. Transfer of site operational personnel from the Regional Of fice to the site through the alternate CP (and back) will be accomplished via helicopter. The lis ing of IE and NRR personnel who will operate from the alternate CP is at Annex B.

Priority actions to be performed during relocation are shown in chrono-logical order in Annex C.

CO?^1AND AND CONTROL:

Command and control of site activities over which NRC:IE and NRR are involved at the time of plan implementation will remain at the site CP w.th those individuals listed in Group "B" of Annex A.

Command and control of site activities will be transferred to Ccmmand and Control Group "A" at the alternate Ci just prior to removal of Group B personnel from the site CP.

LOGISTICAL TsPIORT: Logistical support for the alternate CP and relocated site operations personnel at the Region I office will be provided by Region I persannel.

This support shall consist of, but not be limited to:

-Arrany,ements for helicopter transpcrtation of NRC site opera. ions shift personnel to and " ~m the TMI site;

-Lodging for personnel relocated to -

ogional Office;

-Accountability of NRC personnel; and

-Arranging NRC:IE site operations shift schedules in coor-dination with the alternate CP.

T]ANSPMTATION PLAN:

See Annex D.

Annex A I

CO?.AND AND CONTROL MOVEENT PLM; GROUP:_ A___ -

MOVEMENT TO BJGIN:

At the time of Plan initiatio1.

MEANS OF TRM;SPORATICN:

Personnel, National Guard Helicopter (van, alternate)

Laboratory & equipment van, to be driven.

DESTINATION:

Alternate Ccamand Post PERS ONNEL/ POSITIONS :

IE, NRR OTIER Grier Vollmer IE Mobile Laboratory Seyfrit Ross IE Equipment Van Smith McCabe Keimig Fisher Neely Essig Gibson GROUP: B MOVEMENT TO BEGIN: Upen establishment of alteinate CP (f 1.5 hrs frem T+0)

MEANS OT TRANSPORTATION: National Guard Helicopter (van, alternate)

DESTIN ATION :

Alternate Command Post PERSCNNEL/PCSITIONS:

E NRR Stchr/ Fisher Denten Senior Operations Support Shiftman Stello Operations Shift Person (in plant) Matson Senior Shif t HP (in plant) 1C4

')')Nl

!Ji i1#l

A'i';EX B i

ALTERNATE CP COMMAND A'iD C0!TIROL GROUP

  • IE NRR Grier/Seyfrit (Director)

Denton Vollmer Smith /Stohr (HP/ENV)

Stello hatson McCabe/Keimig (OPNS)

Ross Essig/Gibson (OPNS SPT)

Fisher /Neely (RAD PROT)

  • The alternate CP can only accomodate 10 NRC personnel at one time.

The above listing provides personnel for two 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> shifts.

I

\\

s 151 22 t!i

,/

b

/

l

\\

151 ggg

Annex C Time Action / Decision Responsible Individual (s)

T-6 hrs Decision to administer KI

?

T+0 Decision to implement CP at site

~ Denten/ Alternate

~

T+5 minutes Call NG to airlift CP personnel

' Donald s on/Kerr/McGra th T+10 minutes Call NG to provide buses Donaldson/Kerr/McGrath T+20 minutes Contact Region I office to alert Donaldson/Kerr/McGrath for implementation of Regional CP

___T+35 minutes Begin Group C movement by bus / heli-National Guard copter T+90 Alternate CP established NA Ti91 Recall inplant personnel Donald son /3 err T+120 Depart Site CP personnel for National Guard rear CP.

T+150 Site operations people arrive at NA Region I n

Ei 7 ') A 1 Jt L L L3 L

j-C e

2) 8 9 s 8

/ r 2

3 e 7

E 9t N

/ p r

O 5 o o

H 9 c P

/ i 1 }

A A

E 4l 6 s N

N L

9 e 6 u E

6h 8B T

8(

- (

7 7

8 8

7 7

i ks

)

n)

N i M 2

)

z2 s1 e

H@o C

d1 v

l 0_

o l

P rN e2 eb A

A B2W1 na N

N

( o 1

j(T ye a

P ne M

C AS(

)

p u

k N

c A

a L

b P

)

(

p N

r u r

O ek e

I t c t

T pa p

A E

ob o

C C

T D

c(

c R

R

/

/

R O

i i

O M

l n

sl V

V P

ea ue O

O S

HV BH P

P N

ART P

P N

C C

O I

e e

T t

i t

i A

a a

N n

n n

n I

r o

r o

T e

i e

i S

t g

t g

E l

e l

e D

A R

A R

lo l

l o

e r

r n

t t

n n

n o

o o

s C

C R

C r

l e

d e N

S d

p n n L

nB a n y

A a

C o

t U

R d s u

D d

N n r dl I

nA a e

- e V

a y

nP f n u

I n s t

n f n r

D n p u

op oo N

ou d

C u s

I C o o

r r r

n yr e e yG o

t G hP t

u t

u r

d o

d 6 d

e r'

h f

l n

t f

l O

O O

A

e IMPLEMENTING INSTRUCTIONS s'

NRC RELOCATION CONTINGENCY PLAN 4/2/79 151 229

/

j 15l 2JO

PERSON'IEL NOTIFICATION Objective:

To describe actions by NRC personnel in the unlikely event that relocation of site operations becomes prudent or neces-s'a ry.

Action Level:

This procedure will be implemented only upon direction of H. Denton or his alternate.

Actions:

1.0 COM.AND AND CCNTROL GRCUF A, MOBILE LABCRATORY AND EQUT FMENT VAN.

1.1 The following individuals will proceed to time designated alternate CP immediately.

E NRR Grier Neely Vollmer Seyfr t Essig Ross i

G. "cith Gibson McCabe Keimig Fisher r

1.2 Transportation to the alternate CP for Command Group A personnel will be via helicopter.

The helicopter pickup point will be the helipad at the rear of trailer city.

In the event of inclement weather, transportation will be pro,ided by van provided by the PA National Guard.

1.3 The mobile laboratory and equipment van will be driven to the alternate CP by the duty person assigned to the vehicle as follows:

Laboratory:

Jackson or Kottan Equipment:

McPhail/

1.4 Maps to the alternate CP are at Attachment 1.

1.5 Rooms assigned to the NRC are shown on Attachment 2.

15i 231

CP-1 2

2.0 covMAND AND CONTROL GROUP '.'B" 2.1 The following individuals will remain in position at the site CP until released by command and control group "A" (approximately 1-1.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> from issuance of the order to relocate):

IE Stohr/ Fisher Seuior operations support shiftman Operations shift person (in plant)

Senior shif t HP (in plant)

NRR_

Denton Stello Matson Transportahon to the alternate CP for Cn= mand and Control Group "B" 2.2 will be via PA National Guard helicopter.

The helicopter pickup point will be the helipad located at the rear trailer city.

In the event of inclement weather, transportation will be provided by PA NG c

van.

\\

2.3 Proceed to the pickup point upon release by Command and Control Group "A".

3.0 ALL OTHER NRC PERSONNEL CNSITE 3.1 Upon receipt of the order to relocate. all onsite NRC personnel other than those assigned to Coc=and d Control Groups A & B, the mobile van and equipment van, muster in the area in front of the green food distribution house.

Transportation will be provided by PANG Buses to the Region I of fice. Backup will be provided by PA NG helicopter.

Private, rental and government cars are NOT to be utilized.

4.0 ALL NRC PERSCNNEL NOT CNSITE 4.1 Proceed to the Regional Office of NRC by the most expeditious means.

151 232

x%br?g P

,N 2,

,I 1S 6 )k. 1 c 1d(s&I R n xie r o

-cS oC e_

A t

L o

S

. a t

e n

k1 n 1

o1 ip+

o i

ni e_ S C x

c, c.u e

Tduy c

o A a ol i

P (I 6h

' ' ^

\\'

e.

6' l

i

  • f P

?

C e

k a to a

v.

s u

e b

k r

s r

t i

A r

o s

T c

o

) e.

g Op C s.E t

S s1 t

l.

o o

e. th Pc l

E(

sW e.

if t

n42 IV b

<.a s

o54 c6 a

i 3:

h 81 l <

g P 33 o

E C

p b

~~

}

Q 55 4 4 22 n

.i t

~tv

AHachmenf 2.

~

t0 I

L s

I 7

I

$k O

Uv Es la o3 e

3 4

\\

d f i %

?n

-r-1 E

.z a :d u

4 L

>tD 5

i z

1 e

av l

.~

1 1

5

<o tJ

~

E Z

k N

151 234

s 3

A 44 Ac.hsea +1 k

h A

g

\\

q L

A l

'~

4 d

  • T

' :[

A

%, N o

7 V

b v%

i 7

t-

  • 3 b

~L

>M;

  • 9.

w#s la g

0 x4 3

U s

  • . rs e s

's s) y6 e a

  • 3 S

e e

b.T o

4 D

(

s J

.E s

o b

,t p

s s

f

+

s

+>

h i

b b

t

  • A
  • e a

3 V

V6 Y

J c

iL 151 2M

4 A

h 15;2%

CP-2 CP COORDINATOR IMPLEMENTING INSTRUCTION PURPOSE:

To define actions to be taken by the CP Coordinator who is on-duty at the time relocation is ordered.

ACTION LEVEL:

This procedure shall be implemented only upon order of Dr. H. Denton or h's al ternate.

ACTIONS:

1.0 Alert PA National Guard for:

1.1 Helicopter pickup of Command Groups, a.

Call 787-8694/95/93/92 and say, "This is (Name) of NRC.

We would like a baggage pickup."

GIVE PICKUP POINT AND DESTINATION. (TMl Observation Center /Carlisle Barracks).

b.

If inclement weather prohibits use of helicopters, call 787-8661/7288 and request dispatch of the van being held in reserve. Also, request dispatch of buses being held in reserve to transport other NRC personnel to the Regional Office.

GIVE PICKUP POINT AND DESTINATION (S).

1.2 Bus pickup of all other NRC personnel on-duty:

a.

Call 787-8661/7288 and request dispatch of buses being held in reserve.

CIVE PICKUP POINT AND D ES TI NAT I ON. (THI Observation Center / Region i Office, King of Prussia, PA) b.

If buses are insufficient, call 737-8694/95/93/92 and say, "This is (Name) of NRC.

We have a additional baggage pickups.

Will you please dis-patch the Chinook (s) you have on alert for us."

GIVE PICKUP POINT AND DESTiRATION. (Dil Observation Center / Region i Office, King of Prussia, PA) 2.0 Recall all in-plant NRC personnel except Senior Shi f t Operations person and the Senior Shi f t HP.

3.0 Perform personnel accountability using Attachmert 1.

4.0 Request Forestry Service to set up aircraf t radio on frequency 122.9 5.0 Call Regic, I office and inform them of relocation (215)337-SrJO f 5360 151 237

CP-2 6.0 Call State liaison representative and inform him of the relocation.

783-1734 or 637-2480 7.0 Dispatch someone to " pop" smoke grenade for incoming helicopters.

8.0 When citernate CP is established, recall remainder of in-plant NRC personnel. (Senior Shif t Operations and Senior Shif t HP) 9.0 Depa rt on helicopter wi th Command and Cont rol Group "B".

10.0 Subsequently, arrange for additional flights to the site CP to recover equipment / documents, as needed.

\\

i51 238

CP-2 s

NRC PERSONNEL ONSITE - IE, SP, PA0 1.

Andrews 48.

Mazetis 2.

Ashicy-49.

Madden 3.

Axelson 50.

McCabe 4.

Baunack 51.

McG*eth 5.

Beckman 52.

McPha11 6.

Berlinger

,m a v ~

53 McGregor 7

Bores 54 Mc0 scar 8.

Brown 55.

Miller 9.

Boyd 56.

Montgomery 10.

Clark 57 Neely 11.

Collins 58.

Nimitz 12.

Costello 59.

O'Nelli 13 Coyle 60.

Paul

_Perr$

14 Dicey 61.

Perrotti 15 Donaldson 62.

Plumlee 16.

Dyer 63.

Ra ymond 17.

Essig 64.

Roy 65.

Rodgers 18.

Elsasser" " " ut M ^l ^ ~ # '

19. -Frsher 66.

S=, h im k i 67.

Se ra b i an 20.

Fouchard-FWtd 21.

Gallina 68.

Seyfrit 22.

Glenn 3.g ; L g o u, 69.

Smith, R.

23. G444 son 70.

Smith, G.

24.

Grant 71.

Stohr 25.

Grier 72.

Strasma k

26.

Harpster 73.

Terc 27.

Haverkamp 74 Tongue 28.

Hanchett 75.

Troup 29.

Wtrer 76.

Verdery 30.

Higgins 77 Vessman 31.

Minkley 78.

Warnick 32.

Jackson, T.

79 White 33 Jackson 80.

Wisner 34.

Jape 81.

Woodruff 35.

Jenxins 82.

Yuhas 36.

Johnson 83.

Young 37.

Jorgenson 84 Zavadowski 38.

Kottan 85 Veden 39 Keimig 86.

Aoraham.

40 Kerr 41.

Kohler 42.

Kendig 43.

Kohler 44.

law 45.

Lewis 46.

Little 47.

LAn*mu 151 239

CF-2 NRC PERSONNEL ONSITE - NRR 1.

Adensam 2.

Ash 3.

Bell, M.

4.

Benaraya 5.

Berlinger

6. Boger

,r;#<-' #i 7.

Chiaamal 8.

Collins, p oui r y 9.

Denton 10.

Dunchew 11.

Holman 12.

Klinger 13.

Kreger 14.

Laubeu 15.

Mazetis 16.

Mosshurg 17.

Murphy 18.

Newberry 19.

Novak 20.

Olshinski 21.

Ross 22.

Schierling 23.

Stello 24.

Taylor

[

25.

Thandani 26.

Vollmer 27.

Zigler 28.

Matson.

151 240

-