ML19221A164

From kanterella
Jump to navigation Jump to search
TMI-2 Recovery Base Cost Summary,Revision 2
ML19221A164
Person / Time
Site: Crane 
Issue date: 05/17/1979
From: Arnold R
Metropolitan Edison Co
To:
References
NUDOCS 7905190225
Download: ML19221A164 (1)


Text

1700 }

Y TMI-2 Recovery

,/

BASE CASE

SUMMARY

(Revision 2)

,,11S

- - - - &:C B

V,'

Oc QR

(,

/&x RC Pressure D

(psi)

'r

/

OA i

I 310 RC Temp ( F)

(1)

Degas at A.

Lower pressure ( A -* A ' ) while degassing, then return to A.

(2)

Continue design / installation of static & active systems for primary makeup / level control and secondary cooling system for S/G "B".

(3)

Reduce temperature ( A - B) by steaming on "A" S/G.

Verify operability of secondary cooling system for "B" S/G.

(4)

At B, establish solid coolino to "B" S/G, and when stable, isolate "A" S/G.

(5)

Reduce temperature ( B -+ C ) with S/G "B".

As soon as possible, start solid operation with "A" S/G, with modification pkg to be determined.

(6)

At C, trip RC Pump "A" and establish natural circulation in "A"

and "B"

loops.

W (7)

Reduce primary pressure to value to be determined (C-tD)-

(8)

Take primary system solid - activate new MU/ pressure control system.

END POINT Primary:

"atural circulation, solid water, long term P/V control Secondary:

Solid water, long term heat dump system APPROVED FOR ISSUE:

/

(3 ?* ^l

}930 00' R.

C.

Arnold 1905190 C: