ML19221A132

From kanterella
Jump to navigation Jump to search
Lists Info Requirements for in-plant Data for Inclusion in Daily PNO
ML19221A132
Person / Time
Site: Crane 
Issue date: 04/12/1979
From: Galen Smith
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Book H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
NUDOCS 7905190173
Download: ML19221A132 (1)


Text

a g

te.<;,DCT FOR:

H. T'ook, In-Pl. t H P f' c c t.p Lu ci e r F RO'4 :

C. H.

Smith, Director, IE I!calth Miysics SU3 J:iCT:

ESV IRC' 'i.STAL SHIFT LF A1>ER II,it m 'i AT) C., AL ', ?S T'ie Envircr.en tal Shif t Leader (ESL) is r. p :sible for ry d : ;3 id plotting certain in-plant data and for pc;viding data for t' e.! lily PN.

It is acc.:srary that the In -p l an t H.P.

Ccoup c.

.=de inf t it i en to the FSL in accordance with the scF2?ule listed he'c,.

1 s i r0 H M - ;CY

-.L.1 N_T__D ATA P -.

ind Direc tion Every hour Wind Speed

9. cry ) hour HPR-219 (Part, I, Cas) iourly liFR-3210(Area ::onitor Ecurly VAR-748 (Cas) licurly Equip:.ent Hatch (by portable neter)

Twice daily Personnel Hatch Twice daily HFR-214 (Dece)

Tsiice daily (the above data chould be transnftred by the in plant HP cc-anicator.)

Alco, to,rovide in fo r.;a t i ca in e ch L: en ".ny lip type e'.ent of sipificance,"

each In-Plant HP Shif t Leader uhculd provide a a rnary of any such event at the end of h'is shift to the In-Plant lip Group Leader.

The In-Plant HP Group Leader, at the and of the C300 hour to 1600 ncur shif t, will provide the ESL en the 1000 hour0.0116 days <br />0.278 hours <br />0.00165 weeks <br />3.805e-4 months <br /> to 2?CO hcur shif t eith a cu-nary of the previ cus day's HP cvents of significance.

T~ie ?.S L is th a re s p c.: :ible for utt ing this daily c

suu. mary into the daily TN.

This meno is ef fective en 4/12/79 and rena(ns in ef fect until further notice.

C zoche H.

S.iith CC:

3.

Crier J.P.

Srchr P. Trojacuski

c. :01:s R. Cr car M.

Sciu -cher

\\bh

\\

'i905190M s

C/

T