ML19220C916

From kanterella
Jump to navigation Jump to search
Evaluation of Alternative Backup Level Indicator
ML19220C916
Person / Time
Site: Crane Constellation icon.png
Issue date: 05/11/1979
From: Buhl A
NRC OFFICE OF NUCLEAR REGULATORY RESEARCH (RES)
To:
Shared Package
ML19220C917 List:
References
NUDOCS 7905160060
Download: ML19220C916 (1)


Text

7'

' h.(l 60-32.o h

Bu.hl I

[266/P/h5 w

W:

f.r.

Hvf I\\, H~?

Alternate Backup Level Indicator Using PZR RTD

~

v

,Y; g

'11' EVALUATION

  • p

[E TEC/0RNL have looked at using PZR RTD as level indicator.

coefficient decreases by about a factor of 100 when water level drop

@h The film below RTD (surface temperature increases).

The sensor will heat up and can determine whether water or steam environme of a time constant.

Q5

.g tc = 200 sac ye f;'i Decision Time e @ t 50 seconds

&e M

Note:

requires increased current ^100 ma into a stable bridge kE c1 g

L'~

MEASUREMENTS __

M Gd TF.C (Robinson /Mott) did measurements last night in water at TEC l could readily detect water versus air. increasing the current aos.

By Mf ey Rosemont (RID manufacturer) ran tests last night and found at 400 the senser fails in 4 minutes, but the situation looks reasonabl milliamps, milliamps.

(signal to noise problems).TEC tried lab tests at 50 milliamps but were n e at 100 f

b is that the system will work. However, with better equipment, if their judgment V

{

CONTACTS f

Dr. James Robinson, TEC, 615-966-5856 p

Dr. J. E. Mott, TEC, 615-966-5856 g:

r O

e

)t t,,.,..

\\\\8 \\00 j.'y t.[

f h 79051606 @

9

-} n

\\

's

~.