ML19220C872

From kanterella
Jump to navigation Jump to search
Summary of Telcon W/S Cubie Re Decommissioning Costs for TMI
ML19220C872
Person / Time
Site: Crane Constellation icon.png
Issue date: 04/03/1979
From: Calkins G
NRC OFFICE OF STANDARDS DEVELOPMENT
To:
NRC OFFICE OF STANDARDS DEVELOPMENT
References
TR-790403, NUDOCS 7905160015
Download: ML19220C872 (1)


Text

h p

ljs r

fz April 3,1979 m

s

!.'ote to the File:

At the request of Steve Kent of Congressional Affairs I tried to call David Coulton (224-2993) of Sanator 7:nnedy's staff to cnsuer some cuestions on deco missioning.

I ended up talking to Jim Cubte instead.

He wanted to kno:1 d. hat it could cost to decomission Threc l'ile Island fluclear Station L'a. 2.

I replied that I could not answer his cuestion hecause our technical studies had dealt with the plants that had had a rar. al cperating lifetire and act with those involved in accidents.

I also indicated that we had tentatively planned to look at accident cases some tine in the fature.

Ha then asked for the estimated costs for deccmissioning a plant that had not experienccd cn accident.

I told him that Battelle-P.',L in iiibl:C/CR-0120 estimated about $'.0 nillion for imediate dismantlement o f a l a r ge P:,'R.

Then h: asked about entomiment, and I responded that a very preliainary estimate froa Sattelle was aLout S34 tillion, plus any costs that usuld be associated with surycillcnce of the entombed structure.

G. D. Calkins FPSSB, ES, SD FP 813 Distribution: Central Files SD Rdg/ Alpha FPSSB Rdg/Subj R. M. Bernero R. B. Minogue K. G. Steyer <

G. A. Arlotto S. K. Kent, CA kk

}]b R. G. Smith G. D. Calkins 79051600\\T SD:

__ _ _,, _F o S S3

' C F F IC E Pa=

GDCal kin's : bh s u n = c o-o n ct.------.---. _.-


1___-------

f.fiC Torn 318 (2-/G) f;IICT.1 U2040 t? v. 5. G O v L n v 'c 4 T P R w T W G O F M C E : 19?S ?34-Fe2