ML19220C777
| ML19220C777 | |
| Person / Time | |
|---|---|
| Site: | Crane, Midland |
| Issue date: | 08/29/1978 |
| From: | Vassallo D Office of Nuclear Reactor Regulation |
| To: | Grossman M NRC Office of the Executive Legal Director (OELD) |
| Shared Package | |
| ML19220C778 | List: |
| References | |
| TASK-AS, TASK-BN-78-05, TASK-BN-78-5 BN--78-05, BN-78-5, NUDOCS 7905140278 | |
| Download: ML19220C777 (1) | |
Text
,
Distribution:
m 2 s,973
-+ Docket nles (2)
~
F. Williams Q
o F. Williams Rdg.
Docket Nos: 50-320/50-329 B. Scctt MiltonJ.Grossman,HearingDivisionDirec..,Bgnd"5 8
MEPCRANDUM FOR:
Chief Counsel, OELD D. B. Vassallo, Assistant Director for Light Water FRCH:
Reactors, Division of Projec.t Management, FM BOARD HOTIFICATION - B&W REACT,0R VESSEL WELD MATERIAL
SUBJECT:
(BM-78-5) 21,1978 on this subject recotanended Our memorandum to you of August notifying the Three Mile Island-2 Board on the possible use of out-of-specification weld material in the pressure vessel.
The enclosed licensee response to the staff on this concern should be pro-The vided to the THI-2 Board as followup infomation.
have received this docunc9t under the routine transmittal of docketed However, the administrative techniques of handling incoming infomation.
information are still being worked out so we recommend that it be trans.
uitted through 00 9.
Odtnsihad by t
D. B. M D. B. Yassal.lo, Assistint Director
~
for Light Water Reactors Division of Project. Manageocnt
Enclosure:
Ltr. J. Herbein to NRR, dtd. 8/18/78 cc w/ enclosure:
H. Denton IE (7)
E. Casa M. Fairtile J. Davis W. Hazelton R. Boyd A. Schwencer D. Muller T. Ippolito Y. Stello R. Reid I
D. Hood
, cl -
R. DeYoung D. Eisenhut H. Silver l'
T. Engelhardt B. Grimes 78214020o J. Stolz jOhM L. Michols R. Baer
- 0. Parc
)
e,,[.h Ehf,Tfy 9 25 LWR:A
[
n v__
Zh 1 Iams:ld DVassallo
[Q8/ % /78 08/2.9 /78
- us s. eovsanu.srv emomme opriesa ie7 s -sa*4aa NRCFORM 313 (9 76) NECM C240 7905140'M 2
W-J s