ML19220C758

From kanterella
Jump to navigation Jump to search
Forwards Supplemental Hydrologic Engineering Position Re Requirements for Insp & Maint of Erosion Protection on Dike Surrounding Island
ML19220C758
Person / Time
Site: Crane Constellation icon.png
Issue date: 05/20/1975
From: Harold Denton
Office of Nuclear Reactor Regulation
To: Moore V
Office of Nuclear Reactor Regulation
References
NUDOCS 7905140186
Download: ML19220C758 (2)


Text

~

N Y 0 C 573 V. A. Moore, Assistant Director for Light Wacer Reactors, Group 2, RL HYDRCLCk',IC ENGTmT':G POSITIONS (SUPPLEMENTAL)

PLANT MAME: Three Mile Island'- Unit 2 LICENSING STAGE: CL DOCIET NUMBER: 50-320 RESPO :SI3LZ BRANCH: LWR 2-2 REVIEW STA.US: Hydrologic Engineering Section (SA3) - Awaiting T

Responses Enclosed is a stipple = ental hydrologic engineering position f or the subject plant, prepared by T. L. Johnson and W. S. 31 vins. This supplenental position is based upon a site visit on May 12, 1975 and is necessita*,ad by the fact that the trehnical specification for Unit 1 does / cot require repair and :saintenance of the erosion prs-tection (17. apparently provides only for inspection). We consider that thf a/ position adequately addresses the repair and mintenance of the efosion protection.

Orgirrat S4 sed by

/

H.R.Unte

/

Barold R. Dencon, Assistant Director

/

for Site Safety

[

Division of Techn4 c al Reviev

/

Office of Nuclear Reactor Regulation l

F/2 closure:

DISTRI3CTION:

/is stated DOCKET FILE

/

NRR RDG i ec w/o enc 1:

SA3 RDG

1. Gin =rhusso

,/

W. Mcdonald i

J. Fanzarella 3

/

cc w/ enc 1:

S. Hanauer T. Johnson 1

F. Schroeder R. Elecker SS Branch Chiefs D. Eisenhut

,7 106,2?3 A. r -.ka J. Carter K. Ynfal S. Var a l

B. Washburn S /olson,152, ROI R. Botti:nore D. Jaffe l

TR:SAS,f r-.vi:g TR.:S R TR:ADfES TR:SA3

' a A3 q;

y a.

TJohnsonFJ3 m :s 2nn WPGamil HRDenton CG W l,:

ou...-.

__5/16/75

_5//f/75 5 / $ / 7_5_

5./f/75 5& c/75 f

o.v.

f s rm AIC-318 (Kre. 9-5 5 ) AECd 0.40 W u. s. sovs a mm any paumtvie oreic ts t.74.sas.t es j

.905140/ %

A

9 ETLJRCLOGIC E';G2?EERI'?G POSITIC:: (SL?pLI:C;T/si)

TJZ MILE 151 U0 t;IT 2 DCCKII :;0.30-320 321.05 It is our position that you should subnit technical specifications to require inspection and naintenance of the erosion protection on the dika surrounding the island. The proposed specification should include the following provisions:

1)

Inspection of the erosion protection at least evary 6 nonths and 4 diately after every flood which exceeds 300,000 cfs at the Earrisburg gage.

2)

Pronntly repair (to design specif;: Ttions) any danage to, or displacanent of, the erosion protection and filter

=aterial observed during the intpections.

3) Maintenanca of the dike and riprap should specifically include ranoval of vegetation (trees, growths of weeds and g asses) and other general naintenance as required in order to conforn to design specifications as subnitted in FSAR.

106 23,n