Forwards Possible Action Plan by J Kelley & L Slaggie for Consideration of Regulatory Options on B&W Operating Sister Plants to TMI
ML19220C750
Person / Time
Site: Crane Constellation icon.png
Issue date: 04/02/1979
From: Bickwit L
NRC OFFICE OF THE GENERAL COUNSEL (OGC)
To: Gilinsky V, Kennedy R
NRC COMMISSION (OCM)
References
NUDOCS 7905140163
Download: ML19220C750 (3)


Text

a sh^ Rt%q'o llh l'

s

((g UNITED STATES

+

y g

NUCLEAR REGULATORY COMMISSION o

D f.als; 4 j(( - 2 E

WASHIN GTON, D. C. 20555 V.

April 2, 1979 MEMORANDUM FOR:

Cctrissioner Dilinsky Commissioner Kennedy keonardBickwit, Jr., General Counsel FTtCM:

SUBJECT:

OPTIONS RELATING TO OTHER B&W PLANTS Attached is a possible work schedule which Jim Kelley and Leo Slaggie have put together for your consideration of the " sister plant" issue.

m('

Attachment:

Action Plan cc:

Chairnan Hendrie Commissioner Bradford Commissioner Ahearne OPE SECY 79051401(o3 106 203 4

!)

W p;..

ACTION PLAN FOR DEVELOPING REGULATORY OPTIONS ON t~

SISTER BABCOCK & WILCOX OPERATING REACTORS Commissioners Gilinsky and Kennedy are acting as a subcocmittee of the full Cormissd on for the purpose of developing regulatory options on the Babcc :k & Wilcox operating reactors that are essentially similar in design to Unit 2 of Three Mile Island.

Governor Brown of California has petitioned the Cc mission to shut down one such reactor, Rancho Seco, as a precautionary measure pending development of more definitive information about the causes of the Three Mile Island situation.

Governor Brown's petition, and any similar petitions, should be acted upon expeditiously, recognising that full information about and evaluation of the TMI situation will not yet be avail-able.

Accordingly, OGC suggests that the following steps be taken:

I.

Immediate Staff Work A.

Obtain best available preliminary technical evalua-tion of the significance of the TMI accident for the sister plants.

The focus should be on whether presently available infor=ation indicates a generic design or procedural problem.

B.

Determine current operating status of sister plants --

'e'.c., Davis-Besse is not presently operating.

C.

Determine probable practical effects of the follow-ing regulatory options:

1.

Provision of resident inspector and other meas-ures already adopted.

2.

Increased inspection and surveillance above current levels.

3 Operation at reduced power levels.

4.

Other possible safety ccndit_ons -- e.g.,

provision of additional safety equipment.

5 Precautionary shutdown pending more definite identification of TMI problem.

SUSPENSE:

Tuesday noon, April 3 106 204

~4*

G 2

II.

Briefing of Gilinsky-Kennedy subcommittee on results of I.A-C.

SUSPENSE:

Tuesday afternoon.

III. Subcommittee discussion of regulatory options in light of the briefing.

SUSPENSE:

Tuesday afternoon, following briefing IV.

Presentation of preferred options to full Cot =ission, and Commission decision SUSPENSE:

Wednesday morning V.

Implementation of Commission decision SUSPENSE:

Wednesday noon.